Click to continue…. Railroad Track wetland Image Date: December 2003.

Slides:



Advertisements
Similar presentations
SUB-STRUCTURE foundations.
Advertisements

Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
Chp12- Footings.
SHALLOW FOUNDATION NAME: INDRAJIT MITRA
Loads and Load Paths "Architecture is inhabited sculpture."
Soil & Site Investigation
Failure Case Study of Construction at a Solid Waste Site K. Madhavan, Ph.D., P.E., Dept. of Civil & Env. Engineering Christian Brothers University Memphis,
INTRODUCTION Session 1 – 2
Geological response to Mexico, 1985 Bruce Ashcroft And Amanda Chapman.
Foundations and basements
Chapter 33 Foundation Systems.
Foundation Systems.
Foundations and Soil types
CE 486 DEEP COMPACTION Name : Ali Hamood Al-teeb. ID :
Basic Civil Engineering-Foundation
Floor Systems and Foundation Support
TOPIC 2: TYPES OF FOUNDATION
Foundation Engineering CE 483
FOUNDATION.
ERT352 FARM STRUCTURES FOUNDATION DESIGN
Footings.
Commercial Foundations
FOFFF.
Chapter 2b Foundations Shallow & Deep Foundations.
The sand filter has to be moved from this location. The embankment cross section used in the slope stability analysis did not include the sand filter.
Unit 2 Terms & Definitions.  Legal requirements designed to protect the public by providing guidelines for structural, electrical, plumbing, and mechanical.
Excavation Below Subgrade (EBS)
Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)
Faults Earthquakes begin on a fault plane movement will not proceed smoothly away from the fault due to Changes along the length and depth of the fault.
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
Site Work.
Ground Improvement Dr. Talat Bader
3 Easy Steps STEP 1: SITE SELECTION Select Area with Unsuitable Rock Types.
FOUNDATION Engineering Design of shallow foundation
Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Geotechnical Conditions Tom Joos Civil/Structural Engineer BNL Plant Engineering.
Session 9 – 10 MAT FOUNDATION
Competency: Design and Draw Foundation Plans
P3 - Principles of Foundation Design Foundations or substructures need to safely distribute the weight or load of a building into the subsoil. There are.
EXERCISE 1 GROUP : OPERATOR. Safety Case : Post Closure Of A Disposal Facility Introduction  The facility is situated in Vaalputs, South Africa.  It.
Factors to Consider in Foundation Design Chapter # 02
BUILDING CONSTRUCTION
Engineering Presentation. Basic Soil Mechanics Soil type classification Gravel, sand, silt, clay Soil strength classification Granular soils (sand and.
PILE FOUNDATIONS UNIT IV.
Faults Earthquakes begin on a fault _________ movement will not proceed smoothly away from the fault due to Changes along the _________and ________ of.
Foundation Failure. Foundation movement may result from a wide range of factors, which can include: Shrinking or swelling of clays caused by changes in.
GROUND IMPROVEMENT TECHNIQUES
Foundation types and uses
FOUNDATIONS.
SOIL MECHANICS AND FOUNDATION ENGINEERING-III (CE 434)
Floor Systems and Foundation Support
Keep Your Home Grounded With Expert Answers to Your Foundation Repair Questions.
A REPORT ON PRACTICAL TRAINING CONDUCTED AT PUBLIC WORK DEPARTMENT(PWD),KOTA FROM 15/6/2011 TO 14/7/2011 Submitted to: Mr. Rajneesh Sharma HOD {Civil Dep.}
GEOTECHNICAL CONSIDERATIONS IN CONSTRUCTION DEFECT LITIGATION
Fall 2016 ASSE 4311: Learning Outcome Assessment III/Civil Engineering 18/1/2017 Final Presentation Structural & Geotechnical Design of a Hotel in the.
Plate movement Earthquake = sudden release of energy in the Earth’s crust that creates seismic waves. They are measured by the Richter Scale,
WELCOME.
Arch205 Materials and building construction 1 foundation
Foundations in Low-Rise Construction (up to 3 floors)
CONSTRUCTION METHODS & TECHNOLOGY
“Measuring Earthquakes”
4th Annual Construction Law Summit
Arch205 building construction foundation
Foundations Four Basic Types Footings Piers Pilings Slabs
Building Construction I Sofia Sebastian 1
Component or parts of a building
Step 1 – Prediction of Vibration at Pile Bases
Steps To Prepare Site For Site Work Construction Calhoun GA.
BUILDING CONSTRUCTION Foundation
Presentation transcript:

Click to continue…

Railroad Track wetland Image Date: December 2003

Stormwater Pond Railroad Cars Sylvia Forest Court ± 200 ft. Sylvia Forest Court Image Date: December 2003 Building line

Site Preparation: Last Quarter 2002 Construction: June 2003 Closing date: September 2003 Chronology of Construction Sylvia Forest Court Ocala, Florida

The home owner reported feeling railway vibrations from the first day of occupancy Within 30 days hairline cracks started to appear, gradually increasing in size Settlement Distress

Settlement Distress Cracking in slab under carpet

Settlement Distress Cracking in slab under vinyl flooring

Settlement Distress Cracking in interior wall beneath window

Settlement Distress Cracking above lintel

Settlement Distress Cracking in ceiling

Settlement Distress Cracking in masonry (repaired)

Note: Contours are in Inches ±200 ft.railroad track ± 200 ft. to railroad track Sylvia Forest Court Ocala, Florida

Improperly compacted fill (see subsequent photos) Consolidation of the underlying clay Buried organic soils Vibration from adjacent freight train Some loss of soil under the slab due to erosion/ground water seepage Sinkhole activity Initial Suspects

Unsuitable fill pad preparation such as shown here may have contributed to settlement distress. Poor site conditions after Plumbing installation

Soft saturated unstable subgrade “apparently ready” for concrete pour

A’ A B’ B

Soil Cross Sections Around Building Pad Fill

There was no buried muck. Buried organic layers undergo time dependent settlement. This area is not within an active sinkhole zone. The fill material appears to be of suitable texture and is compacted, except that a 1-ft thick loose zone is observed at the base of the fill. There is no evidence of seepage related soil loss below the slab because the eroded soils would have been observed at some downgradient location. Preliminary Evaluation Ruling out Potential Suspected Causes

-The change in site grade was not significant. About 1 ft of fill was placed above existing grade. -Plastic clays are too deep (> 5 ft) and generally outside the high stress zones. -These clays are generally very overconsolidated, and the magnitude of settlement is expected to be small. Overconsolidated clays are clays which have experienced higher stresses in the past. Preliminary Evaluation Ruling out Potential Suspected Causes (continued) Settlement does not appear to be related to consolidation of clays

Vibrations from passing freight trains are being conducted through a layer of “fat” clay near the ground surface. This clay layer occurs at shallow depth beneath the railroad track, and extends beneath the building footprint where distress has occurred. The clay layer acts as a “shaking table” which further compacts the loose sandy soils above the clay. Final Evaluation

This clay layer is incompressible during short term loading, and acts as a conduit for the transmission of vibrations from the freight train. As a result, vibrations are felt at a greater distance than would normally be expected. ± 200 ft House Train Clay Layer Sand Layer

Site preparation resulted in loose soil zones in natural ground and/or fill materialSite preparation resulted in loose soil zones in natural ground and/or fill material No settlement distress was observed during construction. Loose soil zones may not have resulted in significant settlement, except that…No settlement distress was observed during construction. Loose soil zones may not have resulted in significant settlement, except that… Vibration from passing trains, conducted through the incompressible clays, resulted in further compaction of loose sandy materials after construction.Vibration from passing trains, conducted through the incompressible clays, resulted in further compaction of loose sandy materials after construction. Combination of Adverse Factors

Raising foundations to original elevations using one of the following methods: Chemical grouting Chemical grouting Compaction grouting Compaction grouting Pin piles and jacking Pin piles and jacking Mitigating Building Settlement Distress

± 200 ft House Train Construction of a seismic barrier to reflect and/or attenuate wave energy, using: Sheet piling Sheet piling Soil cement curtain Soil cement curtain Chemical grout Chemical grout Clay Layer Sand Layer Seismic Barrier

Technical Guidelines for Assessing Potential Impact of Railroad Vibrations On Settlement Distress of Residential Structures 1.Offset Distance is less than 250 ft. Distress was encountered within 200 ft. of railroad track, so a threshold distance less than 250 ft. will require additional investigation. 2.Fill pads with greater than 18” of sandy soils. This type of soil can settle by repeated vibration. 3.Material beneath the fill is continuous solid clay (or other relatively incompressible materials such as rock, hardpan, etc.) which can transmit vibration. 4.The solid clay is found close to the surface beneath the railroad track (less than 36”) such that the vibration can be transmitted to the clay. Additional borings and engineering analysis should be performed if the following conditions are present.

Building distress due to improper site preparation, which may not develop under static loading conditions, is more likely to occur when vibrations are present. Site Preparation is Critical Proper site preparation is always important. In an environment that may be subjected to vibrational stresses, site preparation becomes more critical.