Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Calice ECAL Prototype Status Silicon sensors : Production Reception.

Slides:



Advertisements
Similar presentations
SiW ECAL R&D in CALICE Nigel Watson Birmingham University For the CALICE Collab. Motivation CALICE Testbeam Calibration Response/Resolution MAPS Option.
Advertisements

CALICE meeting, Montreal, 10 th May 2006Václav Vrba, Institute of Physics, AS CR ECAL Si sensors status and plans May 2006 V.Vrba.
J-C Brient LLR Progress report on the ECAL prototype 2 - New informations on the cost of the W-Si ECAL 3 - A proposal for a new design of the.
CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
Portland, October 20, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba* Institute of Physics, AS CR, Prague *for CALICE collaboration Silicon.
J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
Vanel Jean-Charles LLR / IN2P3 NIKHEF 1-4 April 2003 NIKHEF 1-4 April 2003 Technical status of the W-Si project CALICE : CAlorimeter for the LInear Collider.
4 November 2002Paul Dauncey - CALICE News1 News from CALICE Paul Dauncey Imperial College London.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
RAL, 25-Jan-2005Nigel Watson / CCLRC-RAL PPD CALICE Calorimetry for LC  Physics motivation  Calorimetry  Design Considerations  CALICE  Status  Future.
30 th June 2004Daniel Bowerman1 Dan Bowerman Imperial College LCUK Meeting - Lancaster 30 th June 2004 Calice Status For the CALICE-UK groups: Birmingham,
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.
CALICE SiW Electromagnetic Calorimeter Testbeam performance and results Roman Pöschl LAL Orsay IEEE – NSS&MCI '08 Dresden/Germany - October The.
10 th November 2004Daniel Bowerman1 Dan Bowerman Imperial College Calice Meeting - UCL 10 th November 2004 Electronics Status For the Imperial, Manchester,
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
Report from CALICE meeting CERN 9/23-23/2002 Andy White Web Site for meeting: agenda_CALICE_23090.html.
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
ECAL silicon- tungsten status
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
1 SiLC sensors for the LP-TPC Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
ECAL EUDET MODULE progress & perspective EUDET annual meeting, oct, 18 st, Munich.
SiW ECAL Technological Prototype Test beam results Thibault Frisson (LAL, Orsay) on behalf of the CALICE collaboration.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
ECFA Sep 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Cristina Lo Bianco - LLR Cosmics test for the W-Si prototype (CALICE) Why the test in cosmics? The cosmics test-bench DAQ for the cosmics test-bench All.
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
24 Mar 2009Paul Dauncey1 CALICE-UK: The Final Curtain Paul Dauncey, Imperial College London.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey.
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
Front-End electronics for Future Linear Collider W-Si calorimeter physics prototype B. Bouquet, J. Fleury, C. de La Taille, G. Martin-Chassard LAL Orsay.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
DESY, 8 Dec 2005J. Cvach, prekick-off JRA3 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
FKPPL, Febuary , Rémi Cornat 1 FKPPL technical activities CALICE Si-W ECAL Rémi CORNAT
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
Marc Anduze first drawings of Ecal eudet module COPIED FROM : Marc Anduze PICTURES FROM : CALICE/EUDET electronic meeting – CERN – 12 July 07.
Understanding of SKIROC performance T. Frisson (LAL) On behalf of the SiW ECAL team Special thanks to the electronic and DAQ experts: Stéphane Callier,
Performance of the PHENIX NCC Prototype Michael Merkin Skobeltyn Institute of Nuclear Physics Moscow State University.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EUDET Extended SC SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
EUDET Annual Meeting SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
CALICE SiW Electromagnetic Calorimeter Testbeam performance and results Roman Pöschl LAL Orsay ACFA/GDE Wordshop – TILC '08 Sendai Japan - Mar
JRA3 Institute of Physics ASCR Prague
CALICE SiW Electromagnetic Calorimeter
CALICE Silicon ECal Sensors Status and prospects
FCAL R&D towards a prototype of very compact calorimeter
ECAL EUDET MODULE Summary talk
CALICE(-UK) Status Paul Dauncey 28 Apr 2004 Paul Dauncey.
(My personal) CALICE Report
10/month is the present production rate 2 FTE + sporadic contributions
New Design for Beam Test Structure
ScECAL+AHCAL+TCMT Combined Beam FNAL
prototype PCB for on detector chip integration
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
UK ECAL Hardware Status
GEM-based Digital Hadron Calorimetry for SiD
Michele Faucci Giannelli
CALICE(-UK) Status Paul Dauncey 7 Oct 2004 Paul Dauncey.
Presentation transcript:

Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Calice ECAL Prototype Status Silicon sensors : Production Reception (test) Number of wafer PCB and Slab production PCB + Chip Gluing Si Sensors Slab assembly Cosmic test bench Beam Test (DESY) Structure Mechanical support Schedule

Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Detector slab Structure 1 Structure 2 Structure 3 ACTIVE ZONE (18×18 cm 2 ) 62 mm Silicon wafers with 6×6 pads (10×10 mm 2 ) 62 mm Metal inserts (interface)  3 structures W-CFi ( 1,2,3 x1.4mm)  15 « detector slabs »  Dimension 200x360x360 mm  9720 channels in the proto. 200mm 360mm The ECAL prototype 360mm

Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status tungsten 8.5 mm Carbone Fiber Detector slab Front End electronics zone Silicon wafer Shielding PCB SCSI connector Carbon Fiber Tungsten The ECAL prototype

Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Silicon Wafers for the prototype 270 Number of active Wafer needed for the physic prototype : 270. Number of active Wafer needed for the physic prototype :  150 will be produce by Institute of Nuclear Physics - Moscow State University (M. Merkin, A. Savin, A. Voronin) First test production : February 2003 Delivered : 145 matrices. Some problem : Leakage or depletion !  150 will be produce by Institute of Physics, Academy of Sciences of the Czech Republic – Prague (V. Vrba, P. Sicho ) First test production : March 2004 “Big” Problem with leakage current (aging) ! Today : 30 matrices.  150 will be produce by Institute of Nuclear Physics - Moscow State University (M. Merkin, A. Savin, A. Voronin) First test production : February 2003 Delivered : 145 matrices. Some problem : Leakage or depletion !  150 will be produce by Institute of Physics, Academy of Sciences of the Czech Republic – Prague (V. Vrba, P. Sicho ) First test production : March 2004 “Big” Problem with leakage current (aging) ! Today : 30 matrices. Silicon Sensors : Production we must check all wafers before gluing

Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Silicon Sensors : Reception (Test) I(V)  Leakage & Breakdown I(t)  aging 36 pixels must be polarized Soon C(V)… Conductive Foam

Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Silicon Sensors : I(V) Good Wafer Bad Wafer

Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Silicon Sensors : I(time) Good Wafer Bad Wafer

Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Silicon Sensors : New Prague Production Visit at EP : Petr Sicho (Institute of Physics, Academy of Sciences of the Czech Republic) Pavel Freundlich & Stanislav Kapsia (from ON semiconductor) New chemical treatment of surface … … Need to be confirmed in term of aging

Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Silicon Sensors : Production

Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Production : PCB + Chip TypeNeededProductOKTo be repaired PCB-C (Full) % 5 PCB-Right (Half) % 6 PCB-Left (Half) % 4 Mainly due to assembly

Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Production : PCB + Chip + Wafer : Slab Full PCB : 9 + (1) Half PCB Right : 1 + (1) Half PCB Left : 1 + (0) Full Slab : 3 Half Slab : 0

Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Example Run Number : 198 Date : 22/11/2004 Number of Events : Number of Events on wafers : Duration : 116 hours (~4,8 days) Cosmic test bench

Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Cosmic test bench : histo

Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Cosmic test bench : base line

Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Cosmic test bench : rms noise

Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Cosmic test bench : fit …

Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Structure & Mechanical support Sept : Structure 1 & 2 OK Feb : Structure 3

Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Ecole Polytechnique December 10 : 4 Slab (structure 1) 4 Slab (structure 1) UK DAQ test with cosmic  one week UK DAQ test with cosmic  one week December 14 : 5 Slab (structure 1) End of December and beginning January : Slab production for structure 2 DESY Mid January 2005 : Mecanical support Mecanical support Structure 1 with 5 Slabs Structure 1 with 5 Slabs Structure 2 with 3 or 4 Slabs Structure 2 with 3 or 4 Slabs February and march : Completion of the full prototype Completion of the full prototype Schedule September 2005 : MTBF- Fermilab (electrons/pions/protons up to ~80 GeV) test beam with HCAL …