RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Slides:



Advertisements
Similar presentations
PREPARATION AND SCRUTINY OF DETAILED PROJECT REPORTS AS PER NEW TEMPLATE Prof. B.P. Chandrasekhar Technical Advisor to APSRRDA GoAP.
Advertisements

Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
ODOT Structure Project Manager Training
When Accuracy Matters WELCOME DOLPHIN CONSTRUCTION CO. (An ISO 9001:2008 Certified Co.)
Executive Summary Introduction In 1988, by virtue of State Statute , the Nebraska State Legislature first assigned the Nebraska Department.
BOX PUSHING TECHNOLOGY
Engineering College Civil Engineering Department Jenin – Tubas Highway Design Transportation Engineering Graduation Project Supervisor : Dr. Khaled Al-Sahili.
GeoPak Ver Update New Criteria Enhancements since last year. Using Backslope Override and the Backslope Constraint Line(BCL)
PIPE CULVERT By CH. VENKATARAMAIAH.
Town of Southbury Department of Public Works 2014.
Role of Geospatial Technologies in Roads and Highways 08 th February, th February, 2012 Atul Kumar Chief General Manager, NHAI Atul Kumar Chief.
W. J. M. K. PERERA (RU/E/2007/119) Department of Civil and Environmental Engineering.
Optimum Design in Rural Roads Introduction. Optimum Design in Rural Roads ….1 Introduction to topic: What is intended to be discussed? Optimum and/or.
 Narrow roadway, with no shoulders  Poor pavement condition  AADT 405/150 – Low Traffic Volume  Ideal candidate for P.I.P.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
1 PAVEMENT DATA ITEMS. 2 Climate_Shapes (4 LTPP zones) Soil_Shapes Metadata Estimates Section level data HPMS Pavement Data Summary level data.
E20 TALLINN - NARVA RECONSTRUCTION MAARDU - VALGEJÕE.
Introduction Objectives Analysis Design BOQ Recommendation.
LIST OF STAFF S.N o. Name of Employee Designati on Work Load Name of Work Sanction Cost (in Lacs) Work Executed up to date Remainin g work 1.Sh. A.B.
Bridge 2153 Final Report Premier Engineering Rose-Hulman Institute of Technology.
3R Standards Resurfacing, Restoration, & Rehabilitation Ch. 7 1.
E4014 Construction Surveying Route Location Surveys Reconnaissance Survey Investigation Survey Working Survey Construction Survey.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
Spreadsheet Session Purpose: To illustrate the process involved in recording municipal tangible capital assets Outline: Setting up municipal equipment.
Las Delicias Water Project: Piping System Design EWB-MAP Compiled by: Richard Cairncross Date 1/12/2011.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
I-69 Team 3. Introduction History of project Proposed Route Challenges.
1D Steady State Hydraulic Modelling Bratton Stream Case Study.
Overview of the RSACRP project Road Safety Audit and Crash Reduction Workshop Bandung, 27 & 28 May, 2011 Gerard Neilson VicRoads International Projects.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Development of Project on BOT (Annuity) Model
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
E4014 Construction Surveying Road Construction Plans.
Civil Engineering Department Design of Nablus Tulkarm Highway Prepared by Ahmed Mohammed Mustafa Anas Zeyad Belbeasi Under the Supervision of Dr. Khaled.
Chapter C Cross Section (ANSWERS )
Sec. 7.4: Lengths of Curves. HOW CAN WE FIND THE EXACT LENGTH OF THE CURVE??
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
INFORMATION SYSTEM FOR RURAL ROAD NETWORK PLANNING – A CASE STUDY
Development of Project on Public Private Partnership (Annuity Model)
Project Constraints Maximum Expected Traffic Load: 2 twenty-ton, 2-axle trucks per week Channel Size: app. 6 ft wide x 5.5 ft deep Available Reinforcement.
Indian Road Construction. ROAD TRANSPORT SCENARIO Economic Growth : 5 - 6% Road Transport Sector Demand Grows at 10 – 12% Need for Road & Transport Infrastructure.
Evaluation and Redesign of Rojeeb Street. Objectives ▪ Evaluation of existing conditions of Rojeeb Street. ▪ Estimation of future conditions of Rojeeb.
Plan Scales (see DOT 1B-3) 22”x34” paper for final designs (preliminary usually ½ size, 11”x17”) 1. Plan view: a) Rural a) 1:1000 plan scale (or 1”=100’)
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
UPGRADATION PLANNING OF RURAL ROADS IN G.I.S. ENVIRONMENT UNDER PMGSY.
Essex County Transportation Services Department Essex County Highways 2016 Construction Program Peter Bziuk P. Eng. Manager Design and Construction Services.
NAME OF PROJECT: Construction and Maintenance of Bridges along National Roads-Rehabilitation/Major Repair of Permanent Bridges, Mandaue-Mactan Bridge.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
Prince Mohamed Bin Fahd University College of Engineering Department of Civil Engineering   Senior Design Project (ASSE III) Spring 2014 Management.
Detailed planning for fish farm construction Once the site has been selected, then initiation of planning begins. There are two main related components.
Investigation of Road Project By S.N. Nanaware
Rehabilitation Project
Village – Jawad, Near – Pipaheda Chunginaka Over Bridge, Rajsamand, NH-8 (Rajasthan, India) /
COMPLETED ASSIGNMENTS
Feasibility Study to Evaluate Brick Aggregates and Foam Bitumen treated RAP for Pavement Design and Construction of NH-44 in Tripura.
District 3 Complete Streets Projects
Investigation of Road Project
Highway Geometric Design Combination of Vertical and Horizontal Alignment.
Starter Calculate the area of the following shapes 6m 120mm 110mm 4m
Road-Stream Interface:
Course Contents Culverts Bridges Buildings 20 November 2018.
THE UPGRADE OF 33.7 KM OF NATIONAL ROUTE N2, BETWEEN MTUNZINI TOLL PLAZA (SECTION 28, KM 42.7) AND EMPANGENI T-JUNCTION (SECTION 29, KM 13.0) CONTRACT.
FBE05 – Mathematics and Statistics
West Hills Road Projects Update
Highway Engineering Civil Engineering Department
Walker Street Reconstruction Project 25% Design Public Hearing
Presentation transcript:

RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL (SH67) – DESURI – GOMTI (SH16) ROAD DEVELOPMENT ON ANNUAITY MODEL

Here comes your footer Page 2 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Here comes your footer Page 3 NECESSITY  Improved connectivity  Development of the surroundings  A boost to tourist Golden Triangle of Rajasthan – Jodhpur to Udaipur  Shorter connection for Jodhpur with Udaipur PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Here comes your footer Page 4 LENGTH (Km)  Total Length of main Link is Km  Details of Proposed Bypasses Given below, S.NoVillage Name Length of Bypass (m) 1Sonai Maji2225 2Bussi1875 3Devli2875 4Kharda970 5Nadol4800 6Desuri4800 Total (Km) PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Here comes your footer Page 5 SCOPE  Preparation of Detailed Project Report -Site reconnaissance -Road Inventory -Pavement Condition -Soil Investigation -Topographical Survey -Improvement Proposal -Finalization of Bypass Alignment -Detailed Design of Geometrics, Pavement & Structures -Detailed design of Road Appurtenances -Preparation of BOQ -Calculation of Annuity PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Here comes your footer Page 6 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) EXISTING WIDTH ROAD SECTIONS LENGTH (KM) EXISTING WIDTHREMARK RAMASYA-DESURI (Km 0/0 - Km 64/100) M CARRIAGEWAY WITH GRAVEL SHOULDER Widen upto 2-Lane with Paved Shoulder DESURI-GOMTI (Km 64/100 - Km 91/450) M CARRIAGEWAY WITH GRAVEL SHOULDER Widen upto 2-Lane with Paved Shoulder PRESENT STATUS

Here comes your footer Page 7 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) SNVillage NameProposed Chainage (Km) StartEnd 1Hemawas Sonai Maji Gurnarkar Sodawas Tawali Busi Somesar Dudhariya Devli Kharda Nadol Narlai Dessuri Gomti VILLAGES ENROUTE PRESENT STATUS

Here comes your footer Page 8 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) CEMENT CONCRETE ROAD SN Chainage Length Type of Widening Widening Side Remarks FromTo ConcentricBothCC Road ConcentricBothCC Road ConcentricBothCC Road ConcentricBothCC Road ConcentricBothCC Road ConcentricBothCC Road PRESENT STATUS

Here comes your footer Page 9 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) EXISTING CRUST SNSH Chainag e Pit No. Side PavementShoulder PMC PMC Old BMWBMGSB Soil R R L L L L PRESENT STATUS

Here comes your footer Page 10 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) STRUCTURES S No.TypeLengthNos.Proposed 1CausewayUp to 10m10Replaced 2Causeway10 to 20m5Replaced 3Causeway20 to 30m9Replaced 4CausewayMore than 30m9Replaced S No. TypeLengthNos.Proposed 1Pipe Culvert m Dia384 Retain and 34 Reconstruction 2Slab Culvert0.5m to 2.0m7426 Retain and 48 Reconstruction Causeway Culverts PRESENT STATUS

Here comes your footer Page 11 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) S No Chainage (Km) Existing Structure ConditionsRemarks Type Total Length (m) Width (m) Slab6.0 GoodRetain Slab6.07.5GoodRetain Slab GoodRetain Slab PoorReplace Slab PoorReplace Slab FairRetain Slab8.07.5PoorReplace Slab GoodRetain Slab PoorReplace Slab PoorReplace Arch Bridge PoorReplace Minor Bridges PRESENT STATUS

Here comes your footer Page 12 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) Major Bridges Sno. Chainage (Km) Existing Structure Conditi ons Remarks Type Total Length (m) Width (m) Slab FairRetain Major Bridge at Chainage Minor Bridge at Chainage PRESENT STATUS

Here comes your footer Page 13 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) Ch. DeflectionMSABM (Overlay)WMMDBM/BC Proposed (Overlay)DBMBCPCC (<120)PCC (>120) Th.(mm)5040DBMWMM New CrustCBR (Assumed)MSADesign Yr. 7%20 New Crust Thicknesses GSB WMMDBMBC ESTIMATED OVERLAY PROPOSED DEVELOPEMENT

Here comes your footer Page 14 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) LIST OF REPLACED BRIDGES S. no. Existing Chainage (Km) Proposed Chainage (Km) Proposed Structure TypeSpan (m) Total Length (m) Width (m) Box Bridge Box Bridge Box Bridge Box Bridge Box Bridge Box Bridge PROPOSED DEVELOPEMENT

Here comes your footer Page 15 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) S.NoVillage Name Chainage Length of Bypass Remarks FromTo 1Sonai Maji Left 2Bussi Right 3Devli Right 4Kharda Left-Right 5Nadol Left 6Desuri Left PROPOSED BYPASS PROPOSED DEVELOPEMENT

Here comes your footer Page 16 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) Project Cost – 174 Cr. (Mainline 121 Cr. + Bypasses 29 Cr. + Str. 24 Cr.) Construction Period – 2 Years Concession Period – 20 Years Annuity -

Here comes your footer Page 17 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Here comes your footer Page 18 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) RAILWAY CROSSING & ROB A Broad Gauge Railway Track Crosses the Project Corridor at Chainage Km near Somesar Village. No ROB has been Proposed along this Road.

Here comes your footer PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Here comes your footer Page 20 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) DATE OF SUBMISSION OF DPR

Here comes your footer LIKELY DATE OF START OF WORK Page 21 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Here comes your footer TAKE OFF STARTING AT RAMASIYA, KM TAKING OFF FROM NH14, KM Page 22 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Here comes your footer CANAL CROSSINGREALIGNMENT PROPOSED ON RIGHT Page 23 SHARP CURVE PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Here comes your footer FIRST VILLAGE ON THE ALIGNMENT- HEMAWAS EARTHEN BUND ON LEFTHABITATIONON RIGHT SIDE ONLY Page 24 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Here comes your footer BYPASS CANDIDATE – SONAI MAJI CONJETION INSIDEEARTHEN BUND ON RIGHT Page 25 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Here comes your footer BYPASS CANDIDATE –VILLAGE SODAWAS VILLAGE SODAWASJUST FIT FOR 10M Page 26 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Here comes your footer BYPASS CANDIDATE – VILLAGE BUSSI VILLAGE BUSSI – BYPASS CANDIDATEVILLAGE BUSSI – FROM INSIDE Page 27 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Here comes your footer DANGEROUS CURVE Starting chainage at End chainage at Page 28 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Here comes your footer INDEX MAP Page 29 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Here comes your footer Page 30 THANK YOU PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)