Coronado Elementary School Project Status Update 05/13/14.

Slides:



Advertisements
Similar presentations
Twin Cities Army Ammunition Plant 2007 Remedial Actions at TCAAP Site C Excavation/Stabilization/Disposal of Contaminated Soils, Placement of Soil Covers,
Advertisements

Update on FCPS Construction/Renovation Projects April 2009.
Edward Downer Elementary School Playfield Renovation Status Update 10/14/14.
Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District January 31, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Harding Elementary School Exterior Repairs & Select Roofing Replacement 08/12/2014.
With the passage of the May 2009 NLISD Bond Election, campuses made improvements and repairs. New flooring in the elementary schools, updated kitchen.
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
East Hope VFD Butler Station Construction General Contractor: East Hope VFD Framing Contractor: Brent Lockwood & Norm Sommerfeld 2003.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
WCCUSD Bond Program Project Status Report
Edward Downer Elementary School Playfield Renovation Status Update 06/10/14.
Welcome to the CY Middle School virtual tour! Click here for pictures of the main floor. Click here for pictures of the second floor.
Arlington Elementary – Renovation Architect: RossTarrant Architects General Contractor: W/S Construction Substantial Completion Date:August, 2010 Contract.
FRED POWELL POWELL & PARTNERS, ARCHITECTS West Contra Costa Unified School District.
SHEPHERD ELEMENTARY SCHOOL PHASE I SHEPHERD ELEMENTARY SCHOOL PHASE I SITE PLAN.
Joint School District of Beloit Beloit City Council Meeting Monday, February 24, 2014.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
Direction at your fingertips. A compass rose is a design on a map that shows directions. It shows north, south, east, west, northeast, northwest, southeast,
Help me find the cardinal directions
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Olinda Elementary School Campus Replacement Master Planning December 2, 2014.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
LISD Board of Trustees Construction Committee Meeting Tuesday, December 11, 2001.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
John F. Kennedy High School – Science Wing, Richmond, CA Progress Report POWELL & PARTNERS, ARCHITECTS WCCUSD FACILITY SUB-COMMITTEE MEETING March 12,
Torrance Unified School District Bond Measure Y Bond Measure Z Quarterly Construction Update September 30, 2009.
Dr. Michael Duffy, Iowa State University Extension Economist Iowa Land Value Survey 2014.
Dr. Michael Duffy, Iowa State University Extension Economist Iowa Land Value Survey 2012.
Facilities Modernization Program Funded by Measure B Project Report April 19, 2010.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
Direction at your fingertips. A compass rose is a design on a map that shows directions. It shows north, south, east, west, northeast, northwest, southeast,
Planning and Design in Rockford: West State Street Corridor Overview 315 North Main Street · Rockford IL
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. November 5, 2007 Prepared.
Example NAMEROLE Ron LilleyProject Manager ???Project Inspector ????County Planner ????Zoning Inspector HBACivil Engineer ????Architect ????Mechanical.
Master Plan SODERSTROM ARCHITECTS Site Aerial Grade School High School Middle School Athletics Dining.
Iowa Land Value Survey 2005 Dr. Michael Duffy, Extension Economist Darnell Smith, Research Associate.
Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 14, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Projection, Distortion, Map Quadrants & Sandalwood Map Learning Objectives – Student understands map projection & distortion – Student understands map.
Option 1 New Construction (10,000 Square Feet) – Secure Entrance / Administrative Offices – Lobby / Connection to Greeno Building – Weight Room Renovations.
BS0502 Flood Protection Erie Street Valve Chamber Platform TS-2575 Prebid Meeting – Technical Presentation May 8 th, 2013.
OHLONE ELEMENTARY SCHOOL, HERCULES CONSTRUCTION PROGRESS REPORT WCCUSD FACILITY SUB-COMMITTEE MEETING AUG. 14, 2012 POWELL & PARTNERS, ARCHITECTS.
Cambrian School District March 19, 2015
Coffee Chat: LA COSTA MEADOWS Elementary school Construction update
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Inspire Elementary School
21st Century School Buildings Plan
Iowa State University Extension Economist
INDOOR BASEBALL / SOFTBALL FACILITY
Minuteman Vocational Technical Regional High School Progress
Iowa State University Extension Economist
Iowa Land Values Survey
Scheduling Project Assignment 3 Team A.
Iowa Land Value Survey 2009 Dr. Michael Duffy, Extension Economist
Iowa State University Extension Economist
Iowa Land Value Survey 2008 Dr. Michael Duffy, Extension Economist Dr
2007 Bond Issue Capital Improvement Program
Iowa Land Value Survey 2004 Dr. Michael Duffy, Extension Economist
Concrete A structural material made by combining cement, sand, aggregate, and water.
Lockeford Elementary School Kindergarten Construction
Iowa Land Value Survey 2007 Dr. Michael Duffy, Extension Economist Dr
北 N north 西 W west 東 E east south南 S.
Coronado Elementary School Project Status
21st Century School Buildings Plan
Presentation transcript:

Coronado Elementary School Project Status Update 05/13/14

Construction Manager:Cary Talbott (SGI) Project Engineer:Marcus Blackmon (Amanco) Inspector of Record:Kris Gilbert Architect of Record:Sisi Meng (WLC Architects) General Contractor: Lathrop Construction Associates

View: Southeast. Project Architect Rendering. Building A (2 Story Administrative Building). Main Drop-off. l

Project Architect Rendering of Playground (Conceptual)

The Coronado E.S. Reconstruction Project consists of 64,738 square feet of new classroom, administrative, multipurpose, kindergarten and support facilities. The Project also includes extensive site work, a bio-swale, site furnishings, covered walkways, State-of-the-Art Technologies, and a myriad of upgrades that will greatly enhance WCCUSD Student’s learning experience.

 Project Duration:510 (Calendar Days)  Notice To Proceed Date: January 6, 2014  Completion Date:May 31, 2015  Percent Complete: 13%  Base Contract Amount:$26,974,910.00

View: Northeast. Activity: Clear & Grub; Demo. Coronado Elementary School Project View: Northeast. Activity: Clear & Grub: Demo.

View: Southwest. Activity: Mass Grading Coronado Elementary School Project View: Southwest. Activity: Mass Grading.

View: Eat. Activity: Lime Treat Soil for Building Pads only. Coronado Elementary School Project View: Eat. Activity: Lime Treat Soil for Building Pads only.

View: Northeast. Activity: Building Pad A (East) Layout. Coronado Elementary School Project View: Northeast. Activity: Building Pad A (East) Layout.

View : East. Building A. Activity : Excavate Trenches for Footings. Coronado Elementary School Project View: East. Building A. Activity: Excavate Trenches for Footings.

View: East. Building K (Kindergarten). Activity: Footing Placement Coronado Elementary School Project View: East. Building K (Kindergarten). Activity: Footing Placement

View: West. Building A. Activity: Preparation for Slab on Grade by placing vapor barrier and rebar. Coronado Elementary School Project View: West. Building A. Activity: Preparation for Slab on Grade by placing vapor barrier and rebar.

View: South. Building M (multipurpose room). Activity: Slab on Grade. Coronado Elementary School Project View: South. Building M (multipurpose room). Activity: Slab on Grade.

. Coronado Elementary School Project View: North. Building C (classrooms). Activity: Slab on Grade.

View: Southeast. Building M (multipurpose room). Activity: Structural Steel Erection. Coronado Elementary School Project View: Southeast. Building M (multipurpose room). Activity: Structural Steel Erection.