Ice. Pure and Simple ™ Welcome to the Ice-O-Matic ® on-line training modules.

Slides:



Advertisements
Similar presentations
Service Section Technical Training.
Advertisements

Refrigeration Basics 101 By: Eric Nelson.
AIR CONDITIONING SYSTEM DIAGNOSIS
TROUBLESHOOTING. 5WSS TROUBLESHOOTING ERROR CODEFAULTY INDICATION E1ROOM SENSOR CONTACT LOOSE E2INDOOR COIL SENSOR CONTACT LOOSE E3WATER OUTLET SENSOR.
Lodging HVAC and Refrigeration
HEAT PUMPS.
Refrigerators.
HEATING AIR © Commonwealth of Australia 2010 | Licensed under AEShareNet Share and Return licence.
100% Outside Air and Dehumidification Management
Ice. Pure and Simple ™ Welcome to the Ice-O-Matic ® on-line training modules.
HVAC Commercial Ref.
Basic Refrigeration Cycle
Left Side Discharge Pressure Regulator
Sealed System Symptoms 2010 Sealed System Symptoms 2010 Sandeep Gupta RTC HA North Videocon Sandeep Gupta RTC HA North Videocon.
Manual Set-Up for Density by Hydrometer Method ASTM D1298, D287, D6822 and IP160 Feb
STEAM TRAPS.
Refrigeration Flow Control
Tennessee Technology Center Center at Pulaski. Superheat & Sub-cooling A Technician’s Guide to HVACR Diagnostics.
REFRIGERATION SYSTEM n Chapter 4 n Classroom Manual n Page 67.
HVACR312 - Refrigeration Metering Devices.
EXPANSION VALVE SYSTEM
C oncerns Ltd ool Energy Efficient Refrigeration Jane Gartshore, Cool Concerns Ltd.
Installation and Initial Start Up by Martin Noska, Service Engineer, Aftersales & Service.
AIR CONDITIONING (COOLING) UNIT 40 TYPICAL OPERATING CONDITIONS
Welcome to the Ice-O-Matic® on-line training modules.
COMMERCIAL REFRIGERATION
The Refrigeration System
Product Introduction.
Trouble Shooting and Performance Testing
Evaporators For Air Conditioning
COMMERCIAL REFRIGERATION
Oil Pressure Problems What to look for.
STEAM HEATING.
Hydronic Mechanical Controls
Hydraulics For The Long Term
Gas Furnace Planned Maintenance
Air-Source Heat Pumps I North Seattle Community College HVAC Program Instructor – Mark T. Weber, M.Ed. Airsource Heat Pump 1.
General Troubleshooting Tips.
The Water Cycle The student knows that the water cycle is influenced by temperature, pressure, and the topography of the land. Today, we are going study.
David Garvin Product Manager EarthDirEX Geothermal Copyright © 2015 Nortek Inc. All rights reserved.
CCNA1 v3 Module 9 v3 A+ Type 2 JEOPARDY K. Martin.
1 Air Conditioning Air System problems. 2 The primary problem that can occur in an air system is the reduction in airflow. Air handling systems do not.
Fluid conditioning. Reservoir Reservoir size The size of a compressed air reservoir depends on the: Delivery volume of the compressor Air consumption.
Why Maintenance Tasks are Important Produced by Joe Marchese.
1-1-Why Maintenance HVAC ? Increases equipment life & reliability Reduces size & scale & number of repairs Lowers maintenance costs through better.
Roof Top Unit Overview (MAGNUM) Visit us at Revision- 12/17/2015.
Manual Density Business Today
Discover the Dosmatic Difference Maintaining your Dosmatic injector for years of service.
Best practice small scale commercial refrigeration, optimisation strategies and simple maintenance Michael Bellstedt, Minus40 Pty Ltd.
Air Dryers The purpose of an air dryer is to remove water vapor from the air. The higher the pressure, the higher the dew point. Dew point is the temperature.
ARÇELİK TİCARİ KLİMA EĞİTİM DÖKÜMANI APPENDIX.
James McIntyre VRF Training Manager V5 Key Components.
R1 Fundamentals of Refrigeration
Student CD for Commercial Refrigeration for A/C Technicians Chapter 12 Ice Machines.
ICE 101 REFRIGERATION BASICS
Scotsman Refrigeration 101
R1 Fundamentals of Refrigeration
By: JAGDEEP SANGWAN Refrigeration Basics 101.
Error codes for split systems
Air Treatment School Refrigerated Dryer Training
Presentation transcript:

Ice. Pure and Simple ™ Welcome to the Ice-O-Matic ® on-line training modules.

Ice. Pure and Simple ™ Diagnosing Slow Production This module will cover the possible causes of slow production issues on the ICE Series™ Undercounter, 22” and 30” wide modular units. This module defines slow production as making less than 90% of rated capacity.

Ice. Pure and Simple ™ Ambient Operating Temperature at Condenser Minimum: 50° F (10° C) Maximum: 110° F (43° C) Minimum : -20° F (-29° C) Maximum : 120° F (49° C) Need 6 inches Minimum on inlet and outlet of Self Contained Units Installation Self-Contained Remote One of the causes of low production is improper installation location. IOM Cubers are not to be installed outside or in a location that can exceed designed limits.

Ice. Pure and Simple ™ Incoming Water Supply Minimum: 20 PSIG Maximum: 60 PSIG Minimum : 40° F (4.5° C) Maximum : 100° F (38° C) Installation Water Pressure Water Temperature Excessive water temperature can also cause a unit to produce ice slower than designed. It is a myth that hot water freezes faster than cold.

Ice. Pure and Simple ™ 30” Modular Units The major cause of under production is lack of maintenance. A dirty system will cause less than expected ice production. Always verify the cleanliness of the ice maker prior to making adjustments. An indication of a dirty Evaporator is a normal freeze time, but an extended defrost. Mineral accumulation on the plate can make it difficult for the Harvest Assist Assembly to clear the slab from the plate.

Ice. Pure and Simple ™ To verify actual production, use this simple formula. Time a cycle from drop to drop. Catch and weigh an ice slab, then do the math as shown above. This example uses ICE0400 Air Cooled units in two different install locations. The one on the left is in a 70 degree room and being fed 50 degree water, the one on the right is in a 90 degree room and being fed 70 degree water. Production charts can be found on each units spec sheets. Which unit is under producing? ICE0400HA4 – 70/50 20 Minute cycle time 1440 minutes in a day 1440 divided by 20 = 72 cycles/day Batch weight of 5.5# 72 times 5.5 = 396 # per day. ICE0400HA4 – 90/70 23 Minute cycle time 1440 minutes in a day 1440 divided by 23 = 62.6 cycles/day Batch weight of 5.5# 62.6 times 5.5 = 344 # per day divided by Cycle Time times Batch Weight = Production

Ice. Pure and Simple ™ The unit on the left is rated for approximately 500 pounds of production while the one on the right is rated for 368 pounds in their given locations. It is the one on the left that is under producing. This unit would need to be checked for cleanliness first, then diagnosed for possible issues. It is imperative that the units be cleaned AT LEAST every six months for proper operation. ICE0400HA4 – 70/50 20 Minute cycle time 1440 minutes in a day 1440 divided by 20 = 72 cycles/day Batch weight of 5.5# 72 times 5.5 = 396 # per day. ICE0400HA4 – 90/70 23 Minute cycle time 1440 minutes in a day 1440 divided by 23 = 62.6 cycles/day Batch weight of 5.5# 62.6 times 5.5 = 344 # per day.

Ice. Pure and Simple ™ Water Leaking from Purge Valve Another possible cause of slow production is a leaking Purge Valve. During the freeze cycle, no water should be leaving the unit through the valve. Any water leaking out will be replaced by the float, keeping the water temperature in the trough up and therefore extending the freeze cycle. A visual sign of this would be little to no ice on the top rows of the Evaporator. A leaking Purge Valve should be replaced.

Ice. Pure and Simple ™ Compressor inefficiency can also cause prolonged production times. The more inefficient the Compressor becomes, the more likely it is to lead to a freeze-up. Compressor RLA should be within 10% of the rating on the data tag 5 minutes into the freeze cycle.

Ice. Pure and Simple ™ Miss-feeding Thermostatic Expansion Valves can also cause slow production if they do not meter down properly.

Ice. Pure and Simple ™ Should the Hot Gas Valve be slightly leaking by, this too could cause extended cycle times by keeping the suction pressure elevated, slowing production. There should always be a marked temperature difference between the inlet and outlet of the Hot Gas Valve.

Ice. Pure and Simple ™ Diagnosing Slow Production Quiz