Eric M. Wetzel Carollo Engineers, Inc. Bentley Be Inspired Awards November 13, 2012.

Slides:



Advertisements
Similar presentations
Construction Delays & CPM Schedules
Advertisements

B. Progress Schedule Schedule Costs –2002 C&MS … the cost of preparing and updating the schedule is incidental to all contract items. –2005 C&MS.
CPM Scheduling Techniques & Technologies Cayuga I-35E, St. Paul
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
Alternative Project Delivery
06/06/07 – 07/11/07 BIM Building Information Modeling.
© 2009 Bentley Systems, Incorporated Presented by Chuck Lawson, PE Civil Product Engineering Using ProjectWise Navigator in the Civil Environment.
BIM Me Up, Scottie! The Next Generation in Construction Technology.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
Typical phases of a project: 1.Schematic Design 2.Design Development 3.Construction Documents 4.Construction Administration.
Reviewing & Analyzing Schedule
ESTIMATING By Laith Jacob.
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Project Plan Development
Strategies for IT Adoption in the Building Industry © 2002 Prof. C.M. Eastman & Dr. R. Sacks The Precast Concrete Industry A proposal for the adoption.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
1 Configuration Management 101 ITS Professional Capacity Building Program T3 Webinar February 21, 2008.
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
Construction Scheduling and Estimating.  Someone gets an IDEA  The IDEA inspires a PLAN to be created  The PLAN is used to build the SCHEDULE  The.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
Honoraria for Design Build Projects Methodology Assessment Matrix.
S/W Project Management
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
Amin Salari, CCM, PMP, LEED AP – Lundgren Management
© 2010 Chevron A Day in the Life of a Project Manager Presented by Nancy Grossman, Project Manager Presented to Chabot College Engineering Class September.
Presented to: SBAS Technical Interoperability Working Group Date: 21 June 2005 Federal Aviation Administration Certification of the Wide Area Augmentation.
Limited Proceedings Water & Wastewater Reference Manual1.
Presented by: Kristi Shinall, Parsons; Jennifer Hall, P.E., Parsons;
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Cost and Time Control. Project completed on time and on budget –Want to get done early –Lower costs –More profit.
Planning and Scheduling. Project Planning –Selecting Construction Methods and sequence of work –Must complete planning before doing scheduling –Steps.
Object-oriented Analysis and Design Stages in a Software Project Requirements Writing Analysis Design Implementation System Integration and Testing Maintenance.
NWPP Multiple-Award Technical Support Contract (eff. 08/2005) Unit 9 Unit 9 “Modifying the Task Order”
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
Craig Owsiany Architectural Engineering – Construction Management STEM Building Hagerstown Community College Hagerstown, Maryland Science Technology.
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
Improved Project Control Through CPM Scheduling What Owners, PM’s and CM’s Need to Know t H E T I B U R O N T I B U R O N G R O U P, L L C G R O U P, L.
Palomar Medical Center West: Segmented Review Process.
Scheduling CTC-370. Value Engineering Provides alternatives to the proposed design –Save Owner $$ –Must be as good or better than original design –Must.
Regional Carbon Sequestration Partnerships… “Pathways to Sustainable Use of Fossil Energy”
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
Update to Proposition 1E – Early Implementation Project (EIP) Application and Local Share Reclamation Board Sub-Committee Meeting September 11, 2007.
The Contract Management Process Post Award Activities.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
The Premier Test Lab Management Software
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Overview May 24, 2017.
House Bill 2610 – 75,600 Minute School year
CONTRACT DOCUMENTS & CONSTRUCTION
Utilities Department Wedgefield Water November 28, 2017.
Fire Protection Survey Procedure
Quality Management Systems – Requirements
Theory, Tools, and Obstacles
Methodologies For Systems Analysis.
IS&T Project Reviews September 9, 2004.
Material Requirements Planning (MRP)
Your Facility Your Information
Risk Management Practice (Case study: Sydney Opera House)
Controlling Project Cost and Schedule
Internal Control Internal control is the process designed and affected by owners, management, and other personnel. It is implemented to address business.
Second Avenue Subway Project Execution Strategy
Software Development In Agile
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

Eric M. Wetzel Carollo Engineers, Inc. Bentley Be Inspired Awards November 13, 2012

PAR 1085 South Secondary Improvements Project What is 4D? Building the 4D Model 4D Visualization The Benefits Summary Questions South Secondary Improvements Project Outline

South Secondary Improvements Project Metro Wastewater Reclamation District Robert W. Hite Treatment Facility (The District)

$136 million w/ potential $1.8 million bonus for early completion Meets new wastewater discharge criteria and adds capacity Very tight schedule to meet permit compliance South Secondary Improvements Project

Carollo Engineers’ Role Design Engineer & Owner’s Representative during construction Review Contractor’s construction schedule to verify compliance with the Contract Responsible for 3D and 4D models

What is 4D? South Secondary Improvements Project

What is 4D? 4D is a tool that links a 3D CAD model with a construction schedule The resulting 4D model allows visualization of the planned construction sequence 3D Model + Schedule = 4D Visualization

Building the 4D Model South Secondary Improvements Project

3D Model Software Used  Bentley Microstation V8 XM  Bentley Architecture V8 XM  Bentley Structural V8 XM  PlantSpace Design Series V8 XM  InRoads XM  ProjectWise V8i  ProjectWise InterPlot  Navigator V8i 65 Total Models  Anything above 2” pipe was modeled 99 Reference Files Completed during the design phase Finalist – Be Inspired Awards 2011

3D Model Elements To achieve a 4D visualization, the 3D model must be designed into constructible elements  Construction Joints  Pipe Joints 3D model must match the depth of the construction schedule

Construction Schedule Software: Primavera P6 v7.0 Extremely detailed consisting of 12,143 activities Structural Drawings vs. Construction Schedule

Linking the Model and Schedule Import accepted Primavera P6 Schedule into Bentley Navigator V8i Link activities in Schedule to Item Sets in the Model  Drop and Drag After Linking is complete:  Close Navigator V8i and Open linked model in Microstation  Use Animation Producer in Microstation to create image frames  Set time frame (May ‘11 – June ‘13)  Set frame duration (daily, weekly, etc.)  Import frames to Camtasia for.AVI development

Visualizing the Visualization While watching the 4D visualization Every start activity will turn the item set within the model green Every finish activity will turn it to the model color. Yellow in this example  Example: Concrete – Rebar, Form, Pour, Cure

4D Model – South West Blower Building PAR 1085 South Secondary Improvements Project

The Benefits How does this help? South Secondary Improvements Project

4D Benefits Tool for Risk Mitigation 4D analysis validated Contractor’s realistic ability to obtain full bonus ($1.8 million) Detailed review and identification of issues in the schedule

Example 1: Concrete Pour Sequence Compliance Schedule Bust: Wall and Slab are poured concurrently. A single bust = Potentially 14 calendar days. Schedule Bust: Wall is being poured prior to Slab

Example 2: Missing Activities/Links or Inappropriate Logic  “A” – Schedule did not reflect updated CJs.  “B” – Threshold of two facilities. Not accounted for in schedule A A B B Missing Activities/Links Upon completion of linking the schedule to the model, linked items can be turned off to show only model items not linked to an activity

Example 3: Visual Assessment of Actual vs. Planned 10/2/2012

4D Benefits – Cont. An updated 3D model for Owner’s use Public Outreach Identification of non- conformance with Contract Ability to look-ahead and plan for future Work activities

Summary South Secondary Improvements Project

Summary 4D tool mitigated significant risk associated with a complex and accelerated schedule Minimize logic loops, missing activities, non-conformance, etc, to account & save significant time in the schedule.  Estimated at 60 working days to date A tool to engage stakeholders without a tangible connection to the project An updated 3D model that can be used for facility maintenance or modifications Versatile Bentley software was utilized in all facets of 3D and 4D development  No hardware or software costs incurred to produce 4D

Questions? Eric M. Wetzel, LEED-AP BD+C Project Controls Carollo Engineers, Inc. 390 Interlocken Crescent, Broomfield, CO (303)