INSTALLATION OF WEIGH-IN-MOTION SYSTEMS by Rich Quinley April 2003 Rev. July 2004.

Slides:



Advertisements
Similar presentations
Weigh-In Motion (WIM) Detectors
Advertisements

Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
Presented by: Mike Sisson February 23, It is the Law The Americans with Disabilities Act of It is the Right Thing to do Provide Equal Access.
Irradiator Specification Installation Qualification (IQ) + Software validation Operational Qualification (OQ) Performance Qualification (PQ) Demonstrate.
Traffic Monitoring Guide Truck Weight Monitoring Section 5.
Chapter 12 Freeway Driving.
Virginia Department of Education
FAA Eastern Region 34 th Annual Airport Conference March 2, 2011 – Hershey, PA.
Recruitment of the New LTPP SPS-10: Warm Mix Asphalt Experiment Gabe Cimini LTPP NCRSC Project Manager.
“A driver initiated program” Lance Morgan Dave Conklin.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 6 Dowel Bar Retrofit.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Maintenance of Traffic (MOT)
TURNER-FAIRBANK HIGHWAY RESEARCH CENTER NDE Research Ongoing Projects and Response Based Load Rating The Office of Research, Development, and Technology.
Traffic Counter Comparison on 2 Lane Roadways Rubber Tube Temporary Counter Sites Vs Wire Loop Permanent Counter Sites.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Florida Department of Transportation, November 2009
1 Automated Machine Guidance: Electronic Files and Design Data AASHTO Subcommittee on Construction Meeting August 18, 2010 – Burlington, VT Mark Taylor.
Chapter 15 Application of Computer Simulation and Modeling.
1 Channelization and Turn Bays. 2 Island Channelization flush, paved, and delineated with markings – or unpaved and delineated with pavement edge and.
HERO UNIT Training Module Work Zone Traffic Control And Incident Management Operations.
CE 4640: Transportation Design
Lec 25, Ch.7, pp : Intersection types and design principles (Objectives) Become familiar with the typical intersection types (See figures 7-1 thorugh.
Incorporating Safety into the Highway Design Process.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
Asphalt Quality Assurance Program
Safety Audit Components Safety assessment for risk Management.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
CONSTRUCTING A FIVE CABIN LATRINE
SESSION 7 Joint Design This session discusses joint design for jointed plain concrete pavements. Historically this is an item that is often ignored or.
Section 11.1 Identify customer requirements Recommend appropriate network topologies Gather data about existing equipment and software Section 11.2 Demonstrate.
Tower SystemsJanuary AMS Short Course on Instrumentation 1 Installation and Use of Meteorological Tower Systems Melanie A. Wetzel Desert Research.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
 Cross section elements consist of the following:  1.Traffic lanes (carriage ways);  2.Shoulders;  3.Medians;  4.Curbs;  5.Side slopes.
SUMMARY FROM ACI 224.1R-93. When anticipating repair of cracks in concrete, it is important to first identify the location and extent of cracking. The.
Interchange Design Wes Mayberry Transportation Engineering Intern
ASK THE EXPERT Frequently Asked Questions. Q.What Is the Safety Edge?
Rich Quinley California Department of Transportation.
INVENTORY AND HISTORY. Instructional Objectives n Types of inventory and historical data n Different methods of collecting inventory and historical data.
Interacting With Other Users. Most collisions occur when two or more objects try to occupy the same space at the same time. Drivers must identify movement.
LTPP Lessons Learned: Kansas SPS-2 July 17, 2013 Abilene, KS Gabe Cimini Database Manager, LTPP NRSC.
LTPP Lessons Learned: Delaware SPS-2 Wednesday April 9, 2014 SPS-2 Tech Day, Dover, DE Gabe Cimini Project Manager, LTPP North Atlantic Regional Support.
Geometric Design (I). Learning Objectives To understand the considerations and quantifiable aspects of geometric design.
Vehicle Segmentation and Tracking From a Low-Angle Off-Axis Camera Neeraj K. Kanhere Committee members Dr. Stanley Birchfield Dr. Robert Schalkoff Dr.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
Information Processing: Complex Risk Environments Topic 1 -- Characteristics of Expressways Topic 2 (through Lesson 1)-- Entering, Changing Lanes, and.
Jeffrey L. Rapol Qiang Wang Jeffrey L. Rapol, Civil Engineer Federal Aviation Administration Airport Engineering Division, AAS Independence Ave,
SESSION 9 Construction Considerations. Objectives  Describe key aspects of: Prepaving operations Paving operations Postpaving operations  Understand.
Hcm 2010: BASIC CONCEPTS praveen edara, ph.d., p.e., PTOE
Expressway Driving Legacy High School Drivers Education.
By Terry Treutel Ride Quality Consultant Former WisDOT Ride Spec Coordinator.
Safety Audit Planned Project - Preliminary Design zGeneral Project Data yProject layout xRoad function Determine the road function. What kind of traffic.
Maintenance and Temporary Traffic Control
Kistler / David Cornu 12 June 2016 Lineas® Кварцевые датчики для больших и малых скоростей WIM David Cornu Product Manager Road & Traffic.
COMPONENT IDENTIFICATION AND INSTALLATION GUIDELINES FLOODBREAK, AUTOGATE FloodBreak, L.L.C Post Oak Blvd., Suite 5850 Houston, Texas
National Highway Institute 5-1 REV-2, JAN 2006 EQUIPMENT FACTORS AFFECTING INERTIAL PROFILER MEASUREMENTS BLOCK 5.
VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
Interdisciplinary teams Existing or new roadway
Investigation of Road Project
NMi WIM standard Cock Oosterman NMi Certin
Vehicle Segmentation and Tracking in the Presence of Occlusions
Safety Audit Components
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
Design Criteria CTC 440.
HERO UNIT Training Module
Patented Precision 8 August 2014 US Patent 6,775,914
Willamette Valley Company
Chris Sajbel Pecora Corporation
South American Applications of Strain Gauge Based WIM
Presentation transcript:

INSTALLATION OF WEIGH-IN-MOTION SYSTEMS by Rich Quinley April 2003 Rev. July 2004

Objectives  Reasonable cost  Good data  Low maintenance  Long performance life

Considerations  Site selection  Pavement preparation  WIM system equipment  WIM component layout and installation techniques  Power and phone layout and installation techniques  WIM system acceptance testing

Site Selection Criteria  Access to power and phone  Adequate location for controller cabinet  Adequate drainage  Traffic conditions  Roadway geometrics  Roadway grade  Existing pavement profile and structural condition

Site Selection Criteria- Power and Phone Availability Power: AC vs. solar  Conduit installation cost  Reliability Phone: Land line vs. wireless technologies  Conduit installation cost  Equipment installation cost  Data transfer rate  Operation cost  Reliability

Site Selection Criteria- Controller Cabinet Location  Protection from vehicles leaving roadway  Accessible and safe for users  Good visibility of roadway  sensors  approaching vehicles  Short conduit runs to loops and weighpads

Site Selection Criteria- Adequate Drainage  Cabinets and pullboxes on high ground  Ability to drain weighpad channels and maintain drainpipes  “daylight” drainpipe at embankment slope (best), or  tie drainpipe into existing facility, or  run drainpipe into sump (least desirable)

Site Selection Criteria- Traffic Conditions Desirable  All vehicles centered in each lane at “cruising” speeds Avoid  Stop and go traffic  Slow moving traffic  more difficult to calibrate  Lane changing, including two-way passing

Site Selection Criteria- Geometrics and Grade  Tangent section of roadway  Adequate lane widths  Consider proximity of interchanges, intersections, on/off ramps, etc.  Good sight distance  Avoid roadway grade > 1%  more difficult to calibrate  more difficult to monitor calibration  effects weight transfer from steer to drive axle

Site Selection Criteria- Existing Pavement Evaluation Approach roadway  Minimum 500’ with smooth profile  more specific requirements for LTPP SPS (“long wavelength”)  Pavement structurally sound and in stable condition

Site Selection Criteria- Existing Pavement Evaluation Pavement through WIM system  If existing pavement is PCC, determine:  grind only or replace  if replace, extent of replacement  If existing pavement is asphalt, determine:  extent of replacement with PCC

Other Site Selection Recommendations  Observe traffic flow at various times of day for “undesirable” conditions  Observe truck traffic  “cruising” vs “lugging”  staying in lane  Consult with individuals who have knowledge of traffic at site  Verify that there are no plans to widen or perform pavement rehab

Site Selection Criteria- Summary Typically rare to find a section of roadway within a specified route segment that meets all “ideal” criteria for a WIM location, particularly in urban areas

Site Selection Criteria- Summary Site reviewer must consider tradeoffs, based upon the importance of the site, as to the effects that a site’s location will have in terms of:  Data quality  Cost to install  Construction problems  Maintenance of roadway and WIM system

Pavement Preparation Criteria  If existing PCC pavement is structurally sound with smooth profile-  grind 200’ in advance and 75’ following scale location*  If existing PCC pavement is unstable and/or rough, or if existing pavement is AC-  replace pavement and grind* * more specific requirements for LTPP SPS

Pavement Replacement Criteria  Replacement length per agency  400’ minimum per LTPP SPS  150’ - 250’ per Caltrans  Replace existing pavement and first level of base material- minimum 12” depth PCC  Seven sack concrete mix with accelerator  can typically open to traffic 4 hours after application of curing compound

Grind New PCC Slab Criteria  For new concrete slab within existing PCC pavement-  start and end grinding in existing pavement as needed to meet smoothness requirements but not less than 25’ preceding and 25’ following new concrete slab  For new concrete slab within existing AC pavement-  start grind 25’ preceding new concrete slab and end 25’ following new concrete slab  seal ground AC (per agency requirements)

WIM System Equipment  Functional requirements  Performance requirements  Warranty requirements  No “how it must be built” requirements

WIM Site Layout, Plans, and Installation Details Intent  Simplify construction  Maintain structural integrity of roadway  Simplify maintenance of power and phone facilities  Simplify replacement of roadway components

Bid document layout plan

Bid document details

Vendor specific configuration

Construction and Installation  Pavement replacement (If required)  Pavement grinding  Component layout  Sawcutting for in-pavement components  Pavement “cutouts” for scale frames  In-pavement component installation  Off-roadway component installation

Construction and Installation- Concrete Pavement  Determine limits of pavement replacement  Agency’s specifications for concrete mix and placement requirements  Weakened plane joints - CRITICAL!  Determine weakened plane joint layout to accommodate WIM vendor’s component layout requirements

Construction and Installation- Sawcut Weakened Plane Joints  Cut ASAP following PCC pour  no raveling or spalling  Joint spacings per agency’s specs  recommend avoid >16’  Skew per agency’s specs  install perpendicular for panels containing scales and loops for best fit  Depth per agency’s specs  cut 1/2 PCC slab depth both sides of scale location

Construction and Installation- Pavement Grinding  Determine limits of pavement grinding  Grinding machine requirements  diamond cutting blades  minimum grind width 3’ per pass  residue pickup vacuum  Check ground pavement for conformance to smoothness requirements

Construction and Installation- In-Pavement Component Layout  Determine bending plate and loop locations considering:  WIM vendor’s specifications  weakened plane joints (new joints vs. existing joints)  Establish perpendicular control  12’ x 16’ x 20’ triangle  Mark all sawcuts for loops, home runs, and scale frames on pavement

Construction and Installation- Sawcutting for In-Pavement Components  Proper depths  Proper slot widths for loops and home runs  Additional cuts for loop and homerun conduits across joints

Construction and Installation- Concrete Removal for Scale Frames  Jackhammer or rockwheel  Take care not to spall edges  Control depth!!!  Overcutting:  weakens pavement  increases epoxy quantity  increases difficulty of frame installation

Construction and Installation- In-Pavement Component Install  WIM vendor’s specifications  Vendor’s representative on-site  Epoxy at proper temperature  Frame pit clean and dry  Anchor holes clean  All conduits sealed  Loop slots clean and dry  Before set weighpads:  conduits and drains clear  pullrope in place for install adjacent lane

In-Pavement Component Install- Comments on photos The steps displayed in these photos are general in nature and by no means cover all of the required steps and details for installation. Installation must conform to the WIM manufacturer’s requirements and should be supervised by the manufacturer’s representative.

Construction and Installation- Off Roadway Component Install  Power and phone facilities in accordance with:  plans  agency’s specifications  utility company’s requirements  electrical codes  Prepare as-built plans

WIM System Acceptance Testing  System component operation  Functional requirements  Accuracy requirements  weight  speed/axle spacing  Continuous operation testing  length of test period per agency requirements

WIM System Acceptance Testing- System Components On-site observations-  All loops, weighpads, and piezos (if utilized) sending signals  Controller electronics converting signals to specified data elements  “Real-time” WIM vehicles match observed  Determine extent of system errors vs. errors caused by “undesirable traffic conditions DOCUMENT! DOCUMENT! DOCUMENT!

WIM System Acceptance Testing- System Calibration  Initial system calibration is typically the responsibility of the installation contractor and/or the WIM vendor and is not, in itself, part of the agency’s “acceptance testing”  It is recommended that the agency observe the calibration process and copy all documentation for comparison to agency’s accuracy validation findings

WIM System Acceptance Testing- Accuracy  Agency uses test trucks to validate accuracy of weights, speed, and axle spacings  Truck types, static weighing and loaded weights, speed patterns, etc., in accordance with agency’s guidelines  Accuracies to be met in accordance with agency’s statistical requirements  tolerances typically from ASTM standard E1318

LTPP SPS requirements

CalTrans requirements

WIM System Acceptance Testing- Continuous Operation  All data for test period downloaded, processed, and analyzed  Determine that all system components are working well on continuous basis  Determine that all required hardware and software software meet performance requirements  communications  on-site  office

SYSTEM ACCEPTANCE Upon successful completion of the continuous operation testing, the system is accepted, the warranty period begins, and data collection commences HOWEVER

WIM System Monitoring The proper installation of a high quality WIM system is a major investment. Although such a system has the capability to produce research quality truck size and weight data, quality data will not be realized in the absence of proper operation, monitoring, and maintenance.

WIM System Monitoring  Routine downloading and storage of data  Processing, validation, and tracking of data  Monitoring and tracking calibration  on-site testing  traffic stream analyses  System troubleshooting checks  System maintenance  Data dissemination and archiving The agency should have procedures for:

Objectives- Revisited Although proper installation procedures are critical in order to attain all of these objectives, good data is attainable only with proper post-installation operation, monitoring, and maintenance procedures. 4 Reasonable cost 4 Good data 4 Low maintenance 4 Long performance life

QUESTIONS ? CONTACT: Rich Quinley