 Modular Installation AMARCO MODULAR. Custom Modular Designer & Manufacturer. AMARCO means a ‘BEAUTIFUL PLACE’. When I decided on the name of the business.

Slides:



Advertisements
Similar presentations
MODULAR BUILD - Introduction a. What is Modular Build? b. Basic Components c Standard Dimensions d. Uses Cost Competitive System.
Advertisements

Enzyme Stabilized Mud (Earthen) Construction using DBV-1
Confidential. ©ARXX Corporation 2010 Insulating Concrete Forms.
Lightweight Forming System and Roofs for Concrete Floors.
The Lucernex Cloud: A software-as-a-service solution delivered via the Cloud What is the Cloud? Cloud Computing is the future of all software applications,
Engineered Wall Panels by: Slide show will advance automatically. At any time, you may use the left arrow to back the slide show up, or the right arrow.
Modular Manufacturing AMARCO MODULAR
Big Pond Tank Mobile, Reusable Construction/Frac-Water Storage.
EXERCISE 2 FOR HIGH SCHOOL.
Economic and sustainable implications of standardised components and modular assembly.
Installation Instructions. Delivery Light fixtures, mounting structures and electrical components ship together Poles ship on a separate truck.
Concrete Pre Cast Panel By Peter Spence ID:
Lesson 18 Edification.
Debbie Staveley. LinkedIn LinkedIn is an interconnected network of experienced professionals from around the world, representing 170 industries and 200.
Cookson & Zinn (PTL) Ltd Tank Base Frame Assembly.
© ABB-EWEC 2006 ATHENS /03/06 EWEC 2006 Athens The Challenges of Offshore Power System Construction Peter Jones Lars Stendius ABB.
Efficient flexibility in room management with SAUTER EY-modulo.
DEPT OF ESTATES AND FACILITIES Engineering Team DEPT OF ESTATES AND FACILITIES Engineering Team Too hot, too cold, just right Presented by: Russell Smith.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
Courses for the Housing Sector City & Guilds Multi-Craft Courses – Flexible Delivery & Duration From 10 up to 30 days Flexible duration on modules – Accredited.
QuickWalls® strong. fast. simple.
What is a Hallmark Modular Home? A Hallmark Modular Home is designed, engineered and built in the controlled environment of a modern factory. It is computer.
A Revolutionary New Panelized Construction System Steel frame panels for each project are built in CHS’s manufacturing facility and delivered to job-site.
Part A - QUALITY AS (3.1): Demonstrate understanding of how internal factors interact within a business that operates in a global context.
Getting a New Coach Started TNL. Duplication If you want to be a successful coach, it’s important that what you train your coaches to do can be easily.
Housing Opportunity Trinidad and Tobago. Global Housing Partners is developing quality affordable housing to answer the housing needs of Trinidad and.
Prefabricated Timber Frame Construction
Hospitality Services Group COOPERATIVE PURCHASING SINCE 1989.
Building With Superior Walls Introducing The Superior Advantage.
Why Invest In You Training? Real Improvement. THE THREE WAY CALL 1. Set schedule call either using Invest In You or conference call. 2. Let upline or.
Building Solutions For The World. Building Solutions For The World What is a Force 10 home? Hurricane - Fire - Termite - Mold - Resistant Housing... Force.
Recruiting Independent Business Owners. Recruiting Use Memory Jogger to make a list of everyone you know Your cell phone, address book and Facebook are.
KAREN PHELPS Spontaneous Sponsoring. Your Home Presentations “A Valuable Source for Recruits”
SHREE J.M.SABVA INSTITUTE OF ENGINEERING &TECHNOLOGY, BOTAD 1.BELADIYA VISHAL R. 2.PARMAR PRAKASH K. 3.DESAI PARAS V. 4.PARMAR VISHAL D. 5.GOHEL KAMLESH.
Construction Technology Ken Brewer. Objectives Identify Construction Technology Understand Construction Technology Evaluate The Impacts Of Construction.
Trade Skills Print Reading and Ductwork. 2 Drawings are a useful tool in manufacturing and construction because most people find it difficult to.
Elsa By Joy Adamson Mrs. Tweedie Elsa The true story of a lioness who was brought up from cubhood by Joy Adamson and her husband, a senior game.
Welcome to Safe-T-first We can train you to be a safer, more confident driver, and help you qualify for discount rates with our associated sponsors the.
Mounting System for new modules Module AIT-PL-6. Mounting way The mounting system for new frameless modules AIT PL-6 was designed and is produced by Spanish.
Forming and Managing Challenge Groups Team Next Level.
Performance Support Your essential toolkit for a highly productive knowledge worker.
Inventions that changed America and the rise of factories.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
5 Steps to Clear Communication. David Lupberger
Lecture 15 - Timber Wall Framing Example
QuickWalls® strong. fast. simple. *Light Weight *Insulated
Reading / Writing 4 Listening / Speaking. 30 professions! How many can you write?
Interview with Employee/ Entrepreneur Assignment Dylan Bragg Nov. 2, 2015 Interview with Jack Parsons Co-owner K&P Contracting.
QuickWalls® strong. fast. simple. *Light Weight *Insulated
GCSE Textiles Exam The Basics…
Things You Should Know Before Buying An Apartment/Flat in Chennai.
Energy Seminar A prefabricated, non-disruptive approach to whole house energy retrofit. Stock assessment, appropriate properties and implementation. John.
About Sentinel Inspections in Indiana Proudly Serving Monroe County & Central Indiana The Best Choice for Home Inspection Services Sentinel Inspections.
Level 1 Diploma in Plumbing Studies © 2013 City and Guilds of London Institute. All rights reserved. 1 of 23 PowerPoint presentation Preparation techniques.
FRANCHISE INFORMATION. How Sassi Gifts works You will have a set agreed area – selling into residential and care sectors plus corporate sales and home.
Introduction TopRung LLC is one of the leading construction building repair and building maintenance service company in Seattle.
JohnPaulAguiar.com BLOGGING | SOCIAL MEDIA | MARKETING | INSPIRATION.
GAME:IT The Engineering Design Cycle. GAME:IT THE DESIGN CYCLE  The basic steps of design are the same if you are building a bridge, house, skyscraper.
Solar collectors Jiangsu Micoe Solar Energy Co.,Ltd.
 I was a mid level employee for the last 9 years. The only hurdle between me and my promotion was to pass the Cisco CCNA Routing and Switching.
North Shore Homes North Shore Homes is a proud builder group in Sydney that offers affordable services and creative construction designs to people of Sydney.
Ryan Thurston | Duncan McLennan
Prefabricated Timber Frame Construction
HIAB TRANSPORT HIRE SERVICES BY DELTA TRANSPORT
SAFCOL Industrialization conference
Data centre transformation
Brute Wall Building System™
Renewable Heat for Care Homes 21st May 2015
Inventions and factories By matthew hodgson
TRENTON Casing Filler Presentation
Presentation transcript:

 Modular Installation AMARCO MODULAR

Custom Modular Designer & Manufacturer. AMARCO means a ‘BEAUTIFUL PLACE’. When I decided on the name of the business I asked myself the question of “What I wanted to provide people when designing or manufacturing a modular building”. The answer came quickly and easily because I know what I want when I thought about a place to spend time in. Whether it be a mining danger or a house, I just wanted to be comfortable and safe, yes it must be a “Beautiful Place” to be in. We as inventors in a home or a project are always looking for faster, better and cheaper ways of living our lives. Within a short period of time we have landed on the moon in 1969 and the color TV was introduced only a short time later. From then on technology is travelling faster than we could ever imagine, IPhones, twitter and facebook are now the common words used throughout our lives.

Custom Modular Designer & Manufacturer. When I looked at the building industry I recall working the two Italian bricklayers laying bricks with their trowels and I realized that the one industry in the world, which is one of the most important areas of our lives was moving very slowly in regards technological development. It was that thought and memory that inspired me to invest my time and money into finding a faster, smarter, safer and cheaper way to build a house. I have finally developed a system and a product that answers all the questions I posed to myself, which are now solutions for builders and owners. The answer is Modular Building. THENNOW

We can now build a 4x2 single story house within 2 weeks rather than 6-8 months, that is incredible and if I hadn’t done it myself with my own hands I wouldn’t believe it. Not only do we enable a fast install time of a house we have increased the quality and strength incredibly. Additionally from an environmental factor we have decreased the environmental impact dramatically not only in the building of the house, by introducing fantastic insulation technology. You can now cool or heat a house at a margin of the cost because our houses are so well insulated. If you check to use our modular building products to build your next building project whether it be your own new home or a development or a hotel or a mining camp you can be guaranteed you will 100% save a great deal of time, money and stress without sacrificing quality. Custom Modular Designer & Manufacturer.

Amarco Modular are able to deliver a brilliant modular building because we have over 85+ years of combined experience in building, manufacturing, construction and management of modular buildings. More importantly all members of our team really love what they do. Our team comprises of tradespeople, technical people, artistic people who really do care about delivering a house, a unit, a hotel, a camp or a simple granny flat that will pass the test of time and is a true representation of them. Their signatures are on every building that is produced and we are all proud of that fact. Additionally to support our Australian ideology and integrity we have a partner factory who shares our values in all of what we produce together. They have 35 years of modular manufacturing experience producing amazing products. Together using our focus on quality control to Australian standards and our personal commitment to assuring only the best product is supplied to our customers. We are able to deliver a strong, reliable, high quality and artistically designed building every time. “THAT IS HOW WE DO IT” How we do it

We invite you to take a look at our Installation Processes BEFORE AFTER SIX WEEKS OF BUILDING

Installation Timeline Process To ensure a smooth and efficient installation process AMARCO has a set process and timeline for the installation of our Modular Buildings. This process can be altered and modified to suit all applications because the basic process is always the same. To manage and monitor these efficiencies we have fully experienced and trained installers and supervisors for Modular Installations.

Installation Process Installation of Footings There are 11 separate stations of production You will need to have your footings put down as per your engineering designs using either concrete footings, slab or the new technology, screw in pillions. Approximately 1 day of works. 1

You need to lay your bearers on top of the footings in preparation for the modules to be craned onto. Approximately 1 day of works Installation Process Installation of Bearers 2

You will need to have your modules transported to site using a flatbed truck. Once they arrive on site you will need to have a crane on site to lift your modules onto your footings or slab that you have already prepared Installation Process Transport of Units to Site 3

Once units are located into position Installation Process Welding and Sealing Units Together 4

Approximately 3 days of works Installation Process Install Roof Trusses and Roof Sheeting 5

Connection and commissioning of electrical system.  With our newly innovated plug in system the installation process is dramatically decreased. Approximately 2 days of works Installation Process Electrical Installation 6

Installation Process Electrical Installation (Plug and Play Components) 6

Installation and connection of plumbing system. All plumbing services pre- plumbed before getting to site.  Connecting waste droppers  Digging trenches  Connecting hot and cold water  And then commission Approximately 2 days of works. Installation Process Plumbing 7

Tiling of the units where the units join. Approximately 2 days of works  Simply fill the rows of tiles left out when tiling works were completed during manufacturing factory in the factory. Installation Process Tiling 8

Installation of gyprocking where we leave only one sheet out where units join, which reduces time on site.  Simply insert one sheet, flush and paint  days on site. Installation Process Gyprock Installation 9

Installation of external cladding where units join. We leave small sections out when manufacturing so that only small areas where units join need to be filled. Again meaning only a day or 1.5 days sealing the external cladding. Installation Process External Cladding 10

Connection of decking and verandas to modules. Approximately 4 days of works. Installation Process Decking, Steps and Veranda Installation 11

The Modular Home…..