Art Nowak February 2013 STRUCTURE DESIGN MANUAL 1.

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Seminar Specifications
Advertisements

ODOT Structure Project Manager Training
Bridge Design Manual Whats New?. Waters of the United States Placement of fill material below Ordinary High Water Mark (OHWM) requires 401/404 permit.
Session 12 STEPS 3 AND 4. Stage 2 Detail Design Submission should include an updated cost estimate and the following: (Not every item listed will apply.
Caltrans, District 11 LAUREL STREET OVERCROSSING 1/16/2014.
Corrosion Resistant Reinforcing Steels.
July Training Outline Part 1 Cost-per –SF and Detailed Estimate Pay Item Detailed Estimate Segments Bridge Level Data Segment Level Data Supports.
NOTE: REFERENCE PROJECT MANUAL DATED 1/4/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO. REVISIONS Construction.
Prof Awad S. Hanna Concrete Structures Concrete Structures.
MDOT ACTT Workshop Structures I-94 From I-96 to East of Connor Participants Steve Stroh, URS Corp Vijay Chandra, Parson Brinckerhoff Raj Ailaney, FHWA.
Bridge Engineering (6) Superstructure – Concrete Bridges
Concrete Specification and Roadway Standard Revisions Bill Miller, PE Bureau of Construction and Materials Mark Burkhead, PE Bureau.
2013 C&MS Section 500- Structures Changes from 2010 to 2013 Construction and Materials Specifications in Structures Items.
SHRP2 Project R04 Bridge Designs for ABC
New York State Department of Transportation Kendrick Road Bridge Over I-390 Design-Build Project Request for Qualifications Informational Meeting June.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director PIAC HAM ; PID Major Rehab - Design Build Project Letting.
SHRP 2 - R04 ABC Demonstration Bridge Design and Construction AASHTO Committee on Construction San Francisco, CA August 16, 2012.
Chapter 34 Bridge Construction.
Maintenance of Traffic (MOT)
Construction Industry Advancement Program John T. Withers, P.E.,P.P. Supervising Engineer, Highways/Buildings - Design New Jersey Turnpike Authority Working.
3-Dimensional Views Existing spillway construction.
SR-528 (Beach Line)/ SR-3 (Courtenay Blvd) Emergency Bridge Repair January 21, 2011.
2015 Winter School Structures Heidi A. Mertz, P.E. District 8-0 Structure Control Engineer.
Introduction to a pit-less electronic scale “concrete deck” The scale to be shown is a B-Tek Side/Rail full electronic Platform is 70’x11’ on a slab design.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). SKETCH NO. REVISIONS Construction.
EUROCODES - Background and Applications – Moscow 9-10 December 2010 Prof. Ing. Giuseppe Mancini - DISTR - Politecnico di Torino 1 EUROCODE 2 – Design of.
Types of Concrete Foundations. Concrete Piers Foundation This type of foundation is mostly used on buildings with post & beam style construction. It is.
Damage Illustrations. Potential Bridge Damage Bridge Component / DamagePossible Cause Approach Slab or Pavement  Raised, lowered, cracked, or buckled.
EXAMPLE 9.2 – Part IV PCI Bridge Design Manual
Schematic Design of an Accelerated Bridge Construction Project Michael P. Culmo, P.E. Vice President of Transportation and Structures CME Associates, Inc.,
February 2013 TOLLWAY MANUALS AND STANDARDS PRESENTATIONS 1.
Bridge Structure Types and Components. BRIDGE STRUCTURE TYPES AND COMPONENTS TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2.
Fiber-Reinforced Polymer (FRP)
ABC/PBES COSTS by Mary Lou Ralls, P.E., Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer)
By: Chris Kennedy, Phil Lagger , Jon Lockie, Chad Pietkowski and Joe Wcislak Campus Bridge Project.
Superstructure Replacement Substructure Repair Rehabilitation of I-95 Bridges 11 Bridges Along I-95 Corridor
Broadway Street Viaduct Improvement, Pre-Load Testing and Geotech Report Workshop Consultant Presentation Iowa DOT 2 nd April 2007.
Bentley Leap Bridge Components Overview
Introduction to a pit installation
Roads And Bridges Development Corporation of Kerala LTD
LRFD Now! Andy Zickler VDOT Structure and Bridge Division Central Office April 10, 2006
Traffic Barrier Guidelines Section 3.0 Potential Roadside Obstacles Hands-On Workshop III July
PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.
Presented by: Department of Transportation - Toll Bridge Program New Benicia-Martinez Bridge Project.
Introduction to a pit-less lever scale “concrete deck” The scale to be shown is a B-Tek Side/rail Side/lever electromechanical Platform is 60’x11’ on.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/20/14.
I-495 NORTHERN SECTION SHOULDER USE PROJECT State Project No , P101, C501 CITIZEN’S INFORMATION MEETING UPC NOVEMBER 19, 2013.
BASICS OF UK DETAILING. BS Codes : 1) Design code: BS8110 2) Detailing codes: BS8666 BS4449.
WisDOT - Bureau of Structures Brandan Burger.  Anything “structural” – change in loading, structural capacity, pile locations  If in doubt, call us!
Ezzeldin Benghuzzi, P.E UPDATE TRAINING Contact Information: Ezzeldin Benghuzzi, P.E ezzeldin. Contact Information:
Design Standards 1 Marshall Douberley 2012 UPDATE TRAINING Contact Information: Marshall Douberley Earl.
Bridge Deck Overlay Projects 101 Presentation by Central Office Bridge Rehabilitation Group.
Stenton Avenue Masonry Arch Rehabilitation Approaches to Historic Bridge Rehabilitation Case Study #1 Michael J. Cuddy, P.E. Principal Kara Russell Cultural.
 Final Inspection Reminders  and  Recurring Corrective Work Items.
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
Seismic Design Impact to
Construction Examples in Japan High Capacity Micropile
Chapter 5: Substructure
ODOT’s Seismic Policy One Year Later
Grade Separation Inspection and Rating.
By T.G.N.C.VAMSI KRISHNA. 171FB M.tech – Civil.
ABCD What’s New In Bridges
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Concrete Structures DR. Nabil Dmaidi.
THE UPGRADE OF 33.7 KM OF NATIONAL ROUTE N2, BETWEEN MTUNZINI TOLL PLAZA (SECTION 28, KM 42.7) AND EMPANGENI T-JUNCTION (SECTION 29, KM 13.0) CONTRACT.
Concrete A structural material made by combining cement, sand, aggregate, and water.
What’s new in Bridges ABCD March 2019
Narrows Bridge - Perth Concrete Repair Works
Protective surface finishes
Presentation transcript:

Art Nowak February 2013 STRUCTURE DESIGN MANUAL 1

2

Article 1.1 LRFD and LFD Bridge and Structure Design 3

Article 1.1 LRFD and LFD Bridge and Structure Design IL 120 Design Truck 4

5

Article 10.3 Abutment Types 6 New integral abutment bridges. IDOT ABD Memorandum 12.3, Dated July 25, 2012.

Abutment Type for Bridge Replacement 7 Integral Abutment With MSE Wall

8 Preferred Abutment Type For Bridge Replacement & Widening Semi-Integral Abutment

Article Integral and Semi-Integral Abutments 9

Article 19.5 Approach Slab and Pile Bent Pay Items 10 1/8” Neoprene Sheet

SECTION 19.0 APPROACH SLABS (PAVEMENT) 30’ Main Approach Slab Pay Items Bridge Approach Slab: SQ YD Protective Coat: SQ YD Bridge Deck Grooving: SQ YD Concrete Barrier: CU YD Reinforcing Bars: LB 11

SECTION 19.0 APPROACH SLABS (PAVEMENT) 70’ Transition Approach Slab Pay Item Transition Approach Slab: SQ YD Protective Coat: SQ YD Reinforcing Bars: LB 12

Article 11.3 Pier Types 13 New Crash Wall Design IDOT ABD Memo, 12.1 Dated April 16, 2012.

Structure Design Manual- PPC Beams 14 All Bridge Designers (BD) Memorandum 10.3, Dated 6/15/2010. All Bridge Designers (ABD) Memorandum 12.2, Dated 4/16/2012.

Constructability & Construction - Slipforming of Bridge Parapet Walls 15 All Bridge Designers (ABD) Memorandum 12.4, Dated 8/17/2012.

Structure Design Manual Article 15.5 Barriers and Raised Medians 16 All Form Material Shall Be Removed From Open joint

Structure Design Manual 17 All Form Material Shall Be Removed From Open joint

Article 24.4 Bridge Mounted Sign Structures 18

Article 10.6 Bridge Seats 19

Snow Storage Area 20

Questions ? 21