Pre-stressed Steel System Post Tensioned Slab Case Study: K- Financial Tower.

Slides:



Advertisements
Similar presentations
D&C PT Contractor’s Role & Responsibilities Chris M. Harris Contracts Manager, Structural Systems & PTIA Technical Committee.
Advertisements

Concrete Fooring & Roofing System
Concrete Construction Part 1
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
Solutions for Prestressed Reinforced Concrete Structures
8621 Georgia Avenue Silver Spring, MD
2.2 STRUCTURAL ELEMENT BEAM
2.2 STRUCTURAL ELEMENT Reinforced Concrete Slabs
Introduction to Prestressing CE 572 Purdue University School of Civil Engineering Julio Ramirez.
Optimising Building Design for Sustainability Using High Performance Concrete Doug Jenkins - Interactive Design Services Daksh Baweja – The University.
SPEED and STRENGTH SPEED and STRENGTH  When speed of construction and strength of slab are your concerns, the KWIK SLAB system is your fast and strong.
Bridge Engineering (6) Superstructure – Concrete Bridges
Commercial Framing C D Prints Unit 13.
Composite Construction
By: “The Slackers” Danny Efland Maria Cuellar Joel Irvine.
4/28/2015 Secant Formula 1 of 62 Real engineers actually laugh at jokes about mathematicians.
Preloaded anchors (WP 1.4 background document presentation) Institute of Steel Structures Aristotle Univ. of Thessaloniki.
Reinforced Concrete Flexural Members
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
Concrete Pre Cast Panel By Peter Spence ID:
UNBONDED PRE- STRESSED CONNECTIONS Prof. John F. Stanton University of Washington, Seattle, Washington, USA The ROSE School, Pavia. June 2009.
Section 3 design of post-tensioned components for flexure Developed by the pTI EDC-130 Education Committee lead author: trey Hamilton, University of.
Arch 330 Fall 2008 FORMWORK AND REINFORCING FOR CONCRETE.
EXAMPLE 9.3 – Part III PCI Bridge Design Manual
Concrete Construction
Introduction to composite construction of buildings
By PARIKH KALPESH. Overview Introduction Structural evaluation of the bridge deck, girders, abutment, and piers Recommended non destructive tests Short.
REPAIR AND STRENGTHENING OF REINFORCED CONCRETE COLUMNS AND BEAMS ICRI – International Concrete Repair Institute Transportation Structures 2010 Fall Convention.
Note: Moment Diagram Convention
Introduction Advantages Dis-advantages Methods of Pre-stressing Mix Design Curing Laboratory Test Visit Report.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
Concrete Construction I Chapter 19. Mehta, Scarborough, and Armpriest : Building Construction: Principles, Materials, and Systems © 2008 Pearson Education,
Chapter 12 Concrete Construction Part 3 1CE 417, King Saud University.
BEAMS AND COLUMNS.
Basic Structural Theory. BASIC STRUCTURAL THEORY TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2 Beams Different member types.
Prestressed concrete is a method for overcoming concrete's
Bridge Design to AS 5100 Sydney May 25th 2005 Using High Strength Concrete with AS 5100 opportunities and restrictions.
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Prestressed Concrete I.  *Unfavorable effects induced from the presence of cracking in reinforced concrete: To expose the reinforcement to corrosion;
Structural Curriculum for Construction Management and Architecture Students 1 Prepared by: Ajay Shanker, Ph.D., P.E. Associate Professor Rinker School.
6- Calculation of shear stress at composite interface: A)Under service load: Strain and stress distributions across composite beam cross- section, under.
Name ________________ Unit 6/P6 – Concrete Construction Expensive Heavy and dense = strong, sound proof and thermally efficient. Cast in situ or pre-cast.
1 TT10 Remedial works What is happening. 2 Compression failure in crown (some cases) Tension/Shear failure in shoulders (typical) Compression Tension.
Economical Design of Concrete Buildings Lawrence Novak.
TEACHING PRESTRESSED CONCRETE DESIGN
Design and Control of Concrete Mixtures CHAPTER 11
Structural Slab Analysis
Introduction Bridge members must be able to carry the loads applied to them. This presentation considers: how loads are applied to members how bridge.
Introduction to composite construction of buildings
Visit for more Learning Resources
Structural Considerations for Bridges
Force, deformation and failure Chapter 31
Cast in Place 2 way Flat slabs Basically joists in both directions
1C2 Conceptual Design of Buildings
RCC UNIT-12 Prestressed Concrete
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Structure II Course Code: ARCH 209 Dr. Aeid A. Abdulrazeg
Structure II Course Code: ARCH 209 Dr. Aeid A. Abdulrazeg
By :Dr. Aeid A. Abdulrazeg
Supervisor: Dr. Mahmoud Dweikat.
2.2 STRUCTURAL ELEMENT Reinforced Concrete Slabs
TWO-WAY SYSTEM WITH UNBONDED TENDONS
Dr S.Sreenath PhD, MSc Engg, MSc (ICM), MBA
ASSESSEMENT AND REHABILITATION OF STRUCTURES
By: Clarence Fragoso and Jonathan Lopez
Chapter 13 Concrete Form Design.
TxDOT Implementation Project Texas Tech University
Presentation transcript:

Pre-stressed Steel System Post Tensioned Slab Case Study: K- Financial Tower

K- FINANCIAL TOWERS

BENEFITS  Less Columns  Less Beams  Thinner slabs  Controlled deflection  Flexibility of Layout & Services  Lighter Structure  Less Foundations  Less Rebars  Less Workmanship  Better Durability  Quicker turn-around of the Formwork  Fast Construction  Cost Saving

PRINCIPLES OF PRESTRESSING

Illustrative example  Illustrative P 2 P cos  For harped profile   P

W Vd Va P P Free-body diagram of tendon Free-body diagram of beam after removal of tendon Force system between tendon and beam P Va W Vd P Illustrative example  Illustrative

BONDED Bond is achieved throughout the length of the tendon by a cementitious matrix called grout PT force along the tendon is a function of the deformation of the concrete  How it is bonded:

K - FINANCIAL TOWERS TYPICAL FLOORS

SLAB MESHING

LATITUDE TENDONS

LONGITUDE TENDONS

Ultimate moment Mx

Ultimate moment My

Service Bottom X stress Plan

Service Bottom Y stress Plan

Service Top X stress Plan

Service Top Y stress Plan

Long term deflection plan

EXECUTION By nominated local installation agent

SUMMARY OF POST-TENSIONING EXECUTION

POST-TENSIONING INSTALLATION FORMWORK SIDE-SHUTTER FIXING OF ANCHORS MARKING OF THE SLAB TENDON INSTALLATION PROFILING & FINISHING

CHECKING BEFORE THE CASTING No. OF ANCHORS AND TENDONS PROFILES GROUT VENTS BURSTING REINFORCEMENT Additional Rebar (Bursting, Punching Shear) PROPPING AND FORMWORK

CASTING PROPER VIBRATION AROUND THE ANCHORS CONCRETE TO BE PLACED WITHOUT DAMAGING THE TENDONS PROPER CURING OF THE CONCRETE AFTER THE CASTING

STRESSING REMOVE THE SIDE-SHUTTER CRUSH CUBE FOR TESTING THE CONCRETE STRENGTH START STRESSING TO 100% IF CONCRETE IS AT 25 MPA IN LESS THAN 3 DAYS DO PARTIAL STRESSING IF REQUIRED TAKE READINGS AFTER

APPROVAL SEND STRESSING RECORDS TO THE P/T CONSULTANT FOR APPROVAL CUT THE TAILS AFTER APPROVAL FILL THE POCKETS PREPARE FOR GROUTING

GROUTING SHUTTER CAN BE REMOVED ADEQUATE PROPPING TO BE PLACED GROUTING OPERATIONS CAN START AT ANY TIME