MPCA Citizens’ Board Information Item February 25, 2014.

Slides:



Advertisements
Similar presentations
Vapor Study Informational Meeting General Mills/Henkel Corp. Superfund Site Van Cleve Recreation Center November 12, 2013 Minnesota Department of Health.
Advertisements

Vapor Study Informational Meeting General Mills/Henkel Corp. Superfund Site Van Cleve Recreation Center November 12, 2013 Minnesota Department of Health.
Environmental Impairment (Pollution) Insurance
Young-Rainey STAR Centre
Case Study of Subsurface Vapor Intrusion at a Dry Cleaner Site Amy Goldberg Day AEHS Annual East Coast Conference on Soils, Sediments.
COMPARISONS OF SUB-SLAB SOIL GAS MEASUREMENTS TO MODELED EMISSIONS FROM SUBSURFACE CONTAMINATION by John A. Menatti and Robin V. Davis Utah Department.
Sarah Evans (Senior EHO) & Angela Guy (Contaminated Land Officer)
2014 Vapor Intrusion Guidance Amendments Discussion Points Waste Site Cleanup Advisory Committee Meeting May 22, 2014.
Vapor Intrusion. What is Vapor Intrusion? The migration of volatile chemical vapors from the subsurface to overlying buildings.
Office of Science Experience with Surveillance and Maintenance (S&M) of Environmental Remediation David Michlewicz – DOE Office of Science, Office of Safety,
STATE ENVIRONMENTAL JUSTICE LAWS THE RHODE ISLAND EXPERIENCE.
Rhode Island Society of Environmental Professionals in conjunction with the Rhode Island Department of Environmental Management Co-hosted by SAME’s Narragansett.
Second Phase Metropolis Towers Chromium Cleanup Presentation to Residents September 4, 2013.
Claremore Medical Office Building From Landfill to Medical Office Building A Brownfield Success Story THE GREEN SIDE OF BROWNFIELD REMEDIATION.
S53X Environmental Audit – 140 to 204 Western Avenue, Westmeadows VIC Anthony Lane Tullamarine Community Meeting, 12 March 2014.
AHMET UCANOK JOHN E. ELVIS Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon.
Environmental Geotecnics1 Environmental Geotechnics Case Study WWII Mustard Gas Factory at Ergethan in the Former East Germany.
Air Force Plant 4 Superfund Site Evaluation of SVE Combined with ERH for the Remediation of TCE Source Material Jeffrey Ragucci SWS 6262 – Soil Contamination.
Federal Mogul Department for Environmental Protection Kentucky Division of Waste Management February 10, 2015 Presented by Chris Jung To Protect and Enhance.
Environmental Geotechnology Presentation Naval Air Station, Pensacola, Florida.
Clean-up at BP Paulsboro New Jersey (USA) Roxane Fisher and Mark Ferguson.
Contaminated ‘Brownfield’ site in south-eastern Michigan By Zhanyuan Cai And William Chow.
Fate and Transport of Chemicals A Presentation by Terrie Boguski Technical Outreach Services for Communities (TOSC) Great Plains/Rocky Mountain Hazardous.
Vapor Intrusion Guidance Proposed Updates
Connecticut Department of Public Works -- Rebecca Cutler – Environmental Analyst.
NYS Department of Environmental Conservation NYSDEC Public Meeting September 12, 2013 Brooklyn Navy Yard, Building 92 Former Kent Avenue Site 500 Kent.
FSA Groundwater Flow and Solute Transport Model Presentation to Scottsdale Citizens Group March 19, 1999.
Scott Surovchak Rocky Flats Site Manager U.S. Department of Energy (DOE) Office of Legacy Management (LM) Cleanup and Remedy Implementation at the Rocky.
Vapor Intrusion and Environmental Liability Learning From Past Mistakes EDR Insight Webinar, February 12, 2013 Presented by: Joseph Maternowski Hessian.
Background and lessons learned Managers Meeting February 13, 2014.
Landia Superfund Site: Green Remediation and Green Infrastructure Support Sustainable Development Douglas Reid-Green, BASF Corporation.
Site Activities Update Park – Euclid RP Group Community Advisory Board Meeting January 16, 2013.
Fort Ord, Monterey County, California History and Closure of a Landfill on a former Military Installation and Current Superfund Site Derek S. Lieberman,
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site August 20, 2013.
Review of Work Plan for Leaded Gasoline Tank Bottom Disposal Pit Assessment and Interim Stabilization Measures Presented by The Great Plains/Rocky Mountain.
Spectron Superfund Site Proposed Plan Contaminated Shallow Soils U.S. EPA Region III June 26, 2003 Philadelphia, PA Robert J. Sanchez US EPA - Remedial.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Former Point Cook Fire Training Area Contamination Remediation Works Project Community Information Session 26 September 2013.
Monitored Natural Attenuation and Risk-Based Corrective Action at Underground Storage Tanks Sites Mike Trombetta Department of Environmental Quality Environmental.
SITE STATUS UPDATE TOP STOP PETROLEUM RELEASE SITE GUNNISION, UTAH Morgan Atkinson – Division of Environmental Response and Remediation, Project Manager.
OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION February 18, 2012.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
Triangle Park Removal Action Area within the Portland Harbor Superfund Site (Portland, Oregon) Jennifer MacDonald Assistant Regional Counsel Office of.
1 Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site LTS&M Planning LTS&M Conference Grand Junction, CO November 16, 2010 Donald Metzler U.S.
State and Tribal Government Working Group November 12, 2008 FERNALD NATURAL RESOURCE DAMAGES SETTLEMENT.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site February 19, 2013.
1 Venezuela. AECOM VENEZUELA AECOM Venezuela was established since the year 1992, registered under the local environmental authority, traditionally providing.
Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing.
Progress in EM’s Footprint Reduction for the Oakland Projects Office Projects Rich Schassburger November 16, 2010.
Feasibility Study Workplan Park – Euclid RP Group Community Advisory Board Meeting May 23, 2013.
By Alex Walton Josh Bush Alex Walton, Josh Bush1.
ESAC Meeting December 1, pm LOS REALES LANDFILL UPDATE Entrance Facility Rodeo Wash Erosion Control Structure Scale House Drainage and other Stormwater.
Department of Toxic Substances Control (DTSC) Draft Feasibility Study/Remedial Action Plan Draft Feasibility Study/Remedial Action Plan Schlage Lock and.
PORT OF TACOMA. Request authorization to award Professional Services Agreement (PSA) No with Geomatrix; and PSA No with Hart Crowser for.
Vapor Study Informational Meeting General Mills/Henkel Corp. Superfund Site Van Cleve Recreation Center November 12, 2013 Minnesota Department of Health.
The City of Rochester New York Environmental Institutional Control System Prepared By: Mark Gregor City of Rochester, New York Division of Environmental.
The Indoor Inhalation Exposure Route Heather Nifong Illinois EPA May 5, 2008.
Identifying Risks due to Historical Dry Cleaners.
Welcome to the World of AUL Avoiding the voidance of your CNS.
N. C. Department of Environment and Natural Resources Division of Waste Management Stony Hill Road Contamination Wake County.
Proposed Plan for No Further Action
Presentation on Livermore Lab Site 300 Superfund Cleanup Peter Strauss, Environmental Scientist, PM Strauss & Assoc. Community-Wide Meeting on
East Hennepin Avenue Site
Chemical Metals Industries, Inc. (CMI)
Using the HAPSITE® as a Vapor Intrusion Investigation Tool
At facilities with subsurface contamination, what other chemicals may your workers be breathing? Matt Raithel.
RINGWOOD MINES/LANDFILL SITE PUBLIC MEETING December 6, 2016
TO LITIGATE, OR NOT TO LITIGATE
Chemical Metals Industries, Inc. (CMI)
Presentation transcript:

MPCA Citizens’ Board Information Item February 25, 2014

Chemical Disposal Former General Mills Facility 2010 East Hennepin Avenue Minneapolis

Generalized Groundwater Contamination Water Table

Generalized Vapor Intrusion Dissolved contamination in groundwater

Groundwater Contamination

Soil Gas Investigation

Public Involvement Two Public Meetings November 12, 2013 Five Community Group Meetings “Office hours” sessions MPCA Project website distribution list for interested parties Widely covered in local media

Sub-slab Sampling

Building Mitigation

Current Status as of 2/19/14

Current Status Sub-slab Sampling 236 properties sampled Sub-slab Sampling Results 126 properties over 20 ug/m3 Mitigation Systems 56 installed and verification testing complete 30 installation process begun

Additional Remedial Actions

Questions & Discussion

Soil and Groundwater Cleanup 1981“absorption pit” removed addressing the soil contamination Response Order by Consent between MPCA and General Mills 1985 Extraction and Treatment of Contaminated Groundwater began Groundwater system turned off. TCE concentrations below the cleanup concentrations established in the Consent Order

November 6, 2013 Mailing to Residents