Federal department of environment, transport, energy and communications ETEC Federal Office for the Environment FOEN Risk Assessment on Pipelines: the.

Slides:



Advertisements
Similar presentations
ENTITIES FOR A UN SYSTEM EVALUATION FRAMEWORK 17th MEETING OF SENIOR FELLOWSHIP OFFICERS OF THE UNITED NATIONS SYSTEM AND HOST COUNTRY AGENCIES BY DAVIDE.
Advertisements

Workshop on the prevention of accidents of gas transmission pipelines The Hague, 8-9 March 2006 Sergiusz Ludwiczak.
EGIG: European Gas Pipeline Incident data Group
The State of Natural Gas Pipelines in Fort Worth.
Determining the Significant Aspects
Risk and RACI: Defining Clear Roles
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Damage Prevention PHMSA Update Annmarie Robertson PHMSA/Office.
CODE OF PRACTICE AND COMMODITIES STANDARDS, PRESENTED AT NIGERIA AFLATOXIN WORKSHOP BY STANDARDS ORGANISATION OF NIGERIA.
Chp12- Footings.
EDUCATION Directive 2002/14/EC of 11 March 2002 establishing a general framework for informing and consulting employees in the European Community.
Comparison between American and European Pressure Vessel Rules
Fundamentals of IRB Review. Regulatory Role of the IRB Authority to approve, require modifications in (to secure approval), or disapprove all research.
1 Land use planning and policies in the Netherlands March 8 th 2006, Carla Speel.
Workshop UN ECE Gerald Laheij | March 8 th 2006 Risk assessment on pipelines The Dutch approach.
Ohio’s One-Stop Utility Resource Gas Pipeline Safety Pipelines - State and Local Issues Pete Chace GPS Program Manager (614)
Session 2.3: IASC OPERATIONAL GUIDELINES ON THE PROTECTION OF PERSONS IN SITUATIONS OF NATURAL DISASTERS Human Rights and Protection in Natural Disasters.
Pipeline Qra Seminar Title slide Title slide.
PPRT PREVENTION DES RISQUES ET LUTTE CONTRE LES POLLUTIONS Safe Communities & a Sustainable Hazaedous Industry : Present and Future Discussion.
ISO General Awareness Training
The Australian/New Zealand Standard on Risk Management
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT RISK ACCEPTANCE CRITERION 2.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
Evaluation of Safety Distances Related to Unconfined Hydrogen Explosions Sergey Dorofeev FM Global 1 st ICHS, Pisa, Italy, September 8-10, 2005.
SÄTEILYTURVAKESKUS STRÅLSÄKERHETSCENTRALEN RADIATION AND NUCLEAR SAFETY AUTHORITY Protection of the environment from ionising radiation - views of a regulator.
Protection Against Occupational Exposure
The German Approach on Safety of Natural Gas Distribution Pipelines WORKSHOP ON THE PREVENTION OF ACCIDENTS OF GAS TRANSMISSION PIPELINES (The Hague, 8.
Codex Guidelines for the Application of HACCP
Copyright © Cengage Learning. All rights reserved. 8 Tests of Hypotheses Based on a Single Sample.
1 INTERREG IIIB “ATLANTIC AREA” Main points of community regulation 438/2001 financial management and control systems EUROPEAN COMMISSION SPAIN.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
INTRODUCTION TO LAND-USE ISSUES. Land-use planning Seveso II provisions (Art. 12) in case of: New establishments Modifications to existing ones Developments.
Judicial Appointments Commission performance in improving judicial diversity regarding women and BAME candidates: evidence pack June 2013.
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
SITUATION ANALYSIS. CONTENT Why do we do a situation analysis? What needs to be achieved? Steps in development of the Situation analysis Defining provisional.
Risk and Human Health. Environmental Risk Analysis Comparing the risk of a situation to its benefits Allows people to evaluate and deal with consequences.
Technical Assistance Grants to Communities Pipeline Safety Trust Conference New Orleans November 20, 2008 Steve Fischer PHMSA/Office of Pipeline Safety.
Crude Oil and Ethanol by Rail: Reducing Risk and Improving Emergency Response.
Energy Exploration & Development On National Forest System Lands Barry Burkhardt
Federal Department of Economic Affairs DEA / Federal Department of Home Affairs DHA Federal Food Chain Unit FFCU How to cope with “risk based” audit programs.
1 PED: equivalent overall level of safety PED Annex 1, clause 7: The following provision apply as a general rule. However, where they are not applied,
Federal Department of the Environment, Transport, Energy and Communications DETEC Federal Office for the Environment FOEN Economics and Environmental Monitoring.
International Conference on Hydrogen Safety 2011 – San Francisco, 12 Sept 2011 Risk informed separation distances for hydrogen refuelling stations Frederic.
Recommendations for Developing Effective Risk Management Policies for Contaminated Site Cleanup An Overview of Risk Management Concepts and How Risk Management.
SEA in the Czech Republic Prague, 24 September 2008.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
International Security Management Standards. BS ISO/IEC 17799:2005 BS ISO/IEC 27001:2005 First edition – ISO/IEC 17799:2000 Second edition ISO/IEC 17799:2005.
The Risk Management Process
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
ASSOC. PROF. DR. DOVILE GAILIUTE MYKOLAS ROMERIS UNIVERSITY 2015 POSITIVE OBLIGATIONS ON HOUSING RIGHTS.
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
1 Integrating Biodiversity Conservation Into Impact Assessment: The Experience of Uganda BERINA UWIMBABAZI.
Swedish Risk Management System Internal management and control Aiming to Transport Administration with reasonable certainty to.
Pilot Project on implementation of SEA for regional planning in Ukraine Prof. Dr. Michael Schmidt Dmitry Palekhov Brandenburg University of Technology.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
RISK MANAGEMENT FOR COMMUNITY EVENTS. Today’s Session Risk Management – why is it important? Risk Management and Risk Assessment concepts Steps in the.
DARSHANA RAGHU MANAGEMENT. Risk Management Risk management is the identification, assessment, and prioritization of risks followed by coordinated and.
European Environmental Liability Safety of offshore oil & gas activities Harko Kremers, sr specialist insurance techniques.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
F8: Audit and Assurance. 2 Designed to give you knowledge and application of: Section A: Audit Framework and Regulation Section B: Internal audit Section.
Workshop on conformity assessment procedures and certification of medical devices INT MARKT Kyiv, November 2011 Conformity assessment of medical.
Public Participation in Biofuels Voluntary
Industrial Area Planning Procedure
Cities and PIPA Why Should We Participate? What Do We Need?
Evaluating Non-Leak Threats
Nick Bonvoisin Secretary to the Convention on the
Risk informed separation distances for hydrogen refuelling stations
Risk informed separation distances for hydrogen refuelling stations
Tests of Significance Section 10.2.
CR-GR-HSE-414 HSE Requirements for Pipeline Operations
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

Federal department of environment, transport, energy and communications ETEC Federal Office for the Environment FOEN Risk Assessment on Pipelines: the Swiss Approach 8 March 2006 Risk Prevention Division

2 Risk Assessment on Pipelines, the Swiss Approach Layout of the presentation (focus is on new pipelines) The legal context The stakeholders Step 1 of assessment: max. possible damage Step 2 of assessment: FN-curves calculation Risk criteria Experience so far A look at the future

3 Risk Assessment on Pipelines, the Swiss Approach The legal context: Ordinance relating to Pipelines, LPE OrP applies to hydrocarbon pipelines (pressure > 5 bar) OrP requires state-of-the-art safety technology (“safety in the pipe”) Control entrusted to the Federal Pipeline Inspectorate For new pipelines: procedure in two steps for the risk assessment Protection against catastrophes is a requirement of the Law on the Protection of the Environment (LPE)

4 Risk Assessment on Pipelines, the Swiss Approach The stakeholders „ Owner“ of the gas pipeline, who bears the responsibility for the safety of the pipeline Federal Office for Energy (SFOE) lead authority, decides after consultation, concerning risk and other aspects, with: Federal Office for the Environment (FOEN) Federal Pipeline Inspectorate Cantonal authorities Third Parties Public

5 Risk Assessment on Pipelines, the Swiss Approach First step of the risk assessment Owner has to carry out in a summary report an assessment of the maximum damage that may be caused to the public or the environment Assessment rough, conservative Carried out according to a standardised methodology, jointly developed by the main stakeholders Summary report is part of the environmental impact assessment and as such available to third parties and the public

6 Risk Assessment on Pipelines, the Swiss Approach Estimation of the maximum possible damage to the public (worst case) Scenario assumed: Full bore rupture of a pipeline, followed by a "fireball" Number of fatalities is considered Parameters: pressure, pipeline diameter → maximum lethality distance (MLD), number of persons usually within MLD Sheltering effects of houses, etc., usually neglected

7 Risk Assessment on Pipelines, the Swiss Approach Profile: fatalities (worst case) Drawn up over the entire length of the project Simplifications lead to conservative results On this basis, the authority evaluates whether a serious damage to the public (10 fatalities or more) is possible

8 Risk Assessment on Pipelines, the Swiss Approach Second step of the procedure For those sections of the pipeline for which the maximum damage exceeds a given level, the authorities require a risk study Requires a quantification of the risk to the public, to be displayed as a cumulative frequency distribution Quantification carried out according to a standardised methodology, jointly developed by the main stakeholders Risk criteria are used for final decision

9 Risk Assessment on Pipelines, the Swiss Approach Scenarios considered

10 Risk Assessment on Pipelines, the Swiss Approach Parameters used in the risk study Pipeline operating pressure and diameter Wall thickness Steel grade Depth of cover Presence or not of concrete slab covering Number of persons outdoors or in buildings that do not provide adequate protection from heat radiation Number of persons in buildings that do provide adequate protection from heat radiation

11 Risk Assessment on Pipelines, the Swiss Approach Calculation of the FN-curve A pipeline length of 300 m is used as a reference length for the risk study The consequences and the probability of the different scenarios are calculated every 10 m. The results of these calculations are then summed up in the FN-curve

12 Risk Assessment on Pipelines, the Swiss Approach FN-Curves compared to risk criteria

13 Risk Assessment on Pipelines, the Swiss Approach Main additional safety measures Optimisation of pipeline route Greater wall thickness Better steel grade Greater depth of cover Addition of concrete slab covering All these measures are subject to a number of constraints

14 Risk Assessment on Pipelines, the Swiss Approach Experience so far The procedure described in this presentation has been applied on several hundred kilometres of new gas pipelines in Switzerland over the last years The use of a common basis for risk assessment has led in most cases to a fair approval process and to a comparatively high acceptance of new natural gas pipeline projects Risk is only one aspect among others

15 Risk Assessment on Pipelines, the Swiss Approach A question for the future Population density along existing, and possibly old, pipelines significantly increased in the past and will increase also in the future The risk is increasing accordingly Safety measures for existing pipelines are particularly costly Question for the future: How are we going to handle fairly these cases Land Use Planning ? Safety measures on the pipe ? Safety measures for development along he existing pipelines ?

16 Risk Assessment on Pipelines, the Swiss Approach Principles to be taken into account The safety of the public cannot be compromised A solution can be arrived at only by involving all stakeholders in an adequate manner All the possibilities mentioned in the previous slide should play a role There is no need to rush for an all- encompassing solution now Adequate priorities and deadlines will have to be set