East Hope VFD Butler Station Construction General Contractor: East Hope VFD Framing Contractor: Brent Lockwood & Norm Sommerfeld 2003.

Slides:



Advertisements
Similar presentations
Confidential. ©ARXX Corporation 2010 Insulating Concrete Forms.
Advertisements

House Construction (Foundation Plans)
Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
AFFORDABLE “BREATHING WALL” Building Envelope Design For conventional North American wood frame and panelized (SIP’s) construction “Breath of Life” building.
Structural System Overview
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
Coronado Elementary School Project Status Update 05/13/14.
Update on FCPS Construction/Renovation Projects August 2009.
Glenn Murcutt SRT 251 Construction and Structures Warehouse and Office complex scenario Stacy Ambelas
U.S. Customs and Border Protection Infrastructure Update Transportation Border Working Group October 27, 2010.
The Medical Office Building Brendon Burley Structural Option April 11, 2005 Advisor: Dr. Thomas Boothby.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Bryan Station Middle – Renovation Architect: Clotfelter-Samokar Architects General Contractor: Preston Construction Group Substantial Completion Date:August,
SITE & GRADING PLANS CHAPTER 6. PART II CHAPTER 9 FOUNDATION PLANS.
Footings, Foundations, and Concrete
March 13, 2007 DRILL Architecture Styles and Vocabulary QUIZ tomorrow
2001 Winter Presentation. Site Location Site View.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
ASSIGNMENT Begin on page 197 “The Foundation”.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Concrete One of the major building materials, (along with wood, steel, stone and brick), that can be used to make large and small elements, from parking.
RESIDENTIAL CONSTRUCTION UNIT Grade 10 Construction Technology TCJ200.
Light Wood Frame Construction
Wood Construction CTC-375.
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
Framing the House. Platform Framing Platform framing.
Khulanathi “grow with us” Children’s home Khulanathi “ Grow with us”
OVERVIEW OF INSTALLING A DOUBLE TRUSS CAISHEN CONTAINER ARCH SHELTER
Competency: Draw Foundation Plans Objective: Identify terminology related to foundation plans.
ASSIGNMENT 1.Begin on page 177 “The Foundation”. 2.Complete “Footing and Foundation”, “Floor and Wall Frame”, “Roof Frame” 3.Label each part of the diagram.
F ACILITIES, P LANNING, AND C ONSTRUCTION December 14, 2015 – Monthly Construction Report.
Photo Tour of Building an Earthship 11 Sep 1999 – 2 Nov 2011 Section 1.2 by Ron and Joy Oliver.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
UNIVERSAL M. ENTP. www. affordablehousing. ug AFFORDABLE HOUSING & MUCH MORE JAN 01 – JAN 15.
AFFORDABLE HOUSING & MUCH MORE
© 2012 Autodesk Autodesk Structural Curriculum 2013 Unit 3: Modeling for Building Structures Building Information Modeling.
BUILDING CONSTRUCTION
JLC CONSTRUCTION FIELD GUIDE The most comprehensive and trusted reference guide to best practices for the construction market ANY TIME. ANY PLACE. ANY.
Entrance/Exit onto West Grand Avenue 1 st Church of the Nazarene is the completed building at the top of the picture.
Floor Systems and Foundation Support
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Leads Institute of Technology & Engineering
Foundation – jay Desai.
Major Steps In Building a SFR
APPLICATIONS OF TECHNOLOGY
Progress Charts.
Objective 6.02 part 1: Recognize components of construction
INDOOR BASEBALL / SOFTBALL FACILITY
Construction 101 Start to Finish
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Competency: Draw Foundation Plans
Minuteman Vocational Technical Regional High School Progress
Framing the House                                                                                                                   
Foundations Four Basic Types Footings Piers Pilings Slabs
אביבה אלקלעי, ראש היחידה לכניסה להוראה, המכללה האקדמית אחווה
מהו הסטאז'? המכללה האקדמית תלפיות.
Minuteman Vocational Technical Regional High School Progress
Construction Engineering Change Order - 2 Prof. Ralph V. Locurcio, PE
Construction Engineering Change Order - 2 Prof. Ralph V. Locurcio, PE
Concrete A structural material made by combining cement, sand, aggregate, and water.
Structural Drawings and Specifications
Fire Station Field Trips
In-Class Scheduling Exercise

Royal Palms Royal Palms Fire Station #25 And Prototype Concept
Structural Designs and Specifications
Presentation transcript:

East Hope VFD Butler Station Construction General Contractor: East Hope VFD Framing Contractor: Brent Lockwood & Norm Sommerfeld 2003

Conceptual Plan Architect : Fran Schuck Rendering: Ed Butler

Fire Station Lot 05/31/03

Clearing 06/07/03 Work Donated by Leonard Butler Jr.

Excavation 08/04/03 Bellomy Construction

Pouring Footings 08/22/03 Brent Lockwood, Norm Sommerfeld & Volunteers

Constructing Forms 08/18/03 Brent Lockwood, Norm Sommerfeld & Volunteers

Foundation Forms 08/24/03 Brent Lockwood, Norm Sommerfeld & Volunteers

Bedding Sand 09/01/03 East Hope VFD

Placing Rebar 09/04/03 East Hope VFD & Samowen VFD

Pouring Slab 09/05/03 Craig Comstock, Todd Woods & Volunteers

Wall Raising 09/10/03 Brent Lockwood, Norm Sommerfeld & Volunteers

Sheathing 09/16/03 Brent Lockwood & Norm Sommerfeld

Placing Beam 09/16/03 Brent Lockwood & Norm Sommerfeld

Trusses 09/26/03 Brent Lockwood, Norm Sommerfeld & Bob Cordes

Digging Power Line 10/01/03 Work Donated By Bruce Stutzke

Fire Station 11/08/04

Dedication 06/04

Butler Family 07/18/04

Volunteers 05/18/05

The End