Tunnelling Across a River Using Immersed Tube Tunnelling Click through the slide show to see key stages in creating a tunnel across a river using Immersed.

Slides:



Advertisements
Similar presentations
Construction Below the Water Table
Advertisements

Cofferdam.
Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
Cairo Metro Line3 / Medinah Car Park II
Floors construction After the foundations have been completed and the external walls constructed the construction of the floors commences.
FOUNDATIONS. Components Footings Trench Formed Keyway Stepped Fireplace.
NEW TOWN HEIGHTS DLF – KAKKANAD WORK PROGRESS REPORT FOR THE MONTH OF MAY 2011 Click to proceed……..
FIXED MARINE STRUCTURES
Tunnelling Methods.
PILES  there are two categories of piles according to the method of installation: A. Driven Piles 1.t imber, steel, precast concrete, piles formed by.
Groundwater Control Affects design of: –Permanent Works –Temporary Works May affect viability of scheme Safety Issues –May cause instability of excavation.
Foundations and basements
GROUNDWATER CONTROL.
Project details • New headquarters for HKSB
DAMS.
Upper Mississippi River - Illinois Waterway System Feasibility Study Extended Lock Design Concept.
1 Armour Ranch Road Bridge Emergency Repairs SB County Project Number 01STRM R015 Storm Damage caused during March 5 th 2001 storm.
Construction Flowchart
Building Strong! IHNC SURGE BARRIER GIWW MRGO. Building Strong! Trestle Construction About 2000’ of trestle allows precision installation of piles and.
3-Dimensional Views Existing spillway construction.
Organics Waste Processing Facility Construction Progress Update January 17, 2011.
Foundation Fundamentals GSD 6204 Building Technology Harvard Graduate School of Design.
1 Pertemuan 07 GEOTEKNIK Matakuliah: S0182/Studi Kasus Dalam Teknik Sipil Tahun: Juli 2005 Versi: 01/01.
Chapter 18 Foundations.
FOFFF.
John Osborne GS/SE March 2013
Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010 Case Study Session
Sources of water (RAIN)
Other Construction Projects
TVI Resource Development (Phils), Inc. September Gossan Dam Embankment Construction Late July 2005 Placement of Core Zone Material. Placement of.
Guess What’s Behind the Box Next Slide Remove Box Next Slide.
Underground Stations Typical Station Site Plan. Underground Stations Ground Conditions: Key Issues.
Earls Mill Road Retaining Wall Ground Anchors and Strengthening.
CAISSON FOUNDATION.
1. 2 Civil Engineering Practice Introduction Instructor: Dr. Attaullah Shah Lecture # 1 Department of Civil Engineering Swedish College of Engineering.
4.4 SOIL NAILING SOIL NAILING IS A REINFORCEMENT METHOD TO REINFORCE THE GROUND WITH STEEL BARS OR STEEL BARS IN GROUT FILLED HOLES. IT IS MAINLY USED.
 AL SALAM STREET UPGRADING C OST CONTROL V IA I NTELLIGENT P LANNING AND D ESIGN F OR GEOGRAPHICAL C HALLENGES February 2010.
Progress Photos March Construction Progress Park Station Portal Shaft Excavation 16 March 2007 View towards South 16 March 2007 General views of.
GEOTECHNICAL ENGINEERING ECG 503 LECTURE NOTE 10 TOPIC : 3
1 TT10 Remedial works What is happening. 2 Compression failure in crown (some cases) Tension/Shear failure in shoulders (typical) Compression Tension.
UNIVERSAL M. ENTP. www. affordablehousing. ug AFFORDABLE HOUSING & MUCH MORE JAN 01 – JAN 15.
The Leaning Tower of Pisa
FLOORS CONSTRUCTION After the foundations have been completed and the external walls constructed the construction of the floors commences.
Hoover Dam Construction. Geological Context Canyon’s tilted layers of andersite breccias Extrusive igneous rock Minerals - plagioclase, pyroxene & hornblende.
TYPES OF DEEP FOUNDATION
COFFERDAMS.
Construction Fundamentals Chapter 16.  Construction technology is the design and building of structures.  Purposes of structures  Places to  Live.
Foundations of Marine Structures SOIL MECHANICS CIVIL ENGINEERING DEPARTMENT BMCET JOSLIN JOSH GATHA DESAI.
Foundation Failure. Foundation movement may result from a wide range of factors, which can include: Shrinking or swelling of clays caused by changes in.
SUBMERGED FLOATING TUNNELS
CAISSON FOUNDATION.
FOUNDATIONS.
Construction Inspection for FO Activities - Geosynthetics
Concrete Repair presented by: Amirhossein Jodeiri Mapua Institute Of Tecnology.
David Smith, Project Manager GZA GeoEnvironmental, Inc. February 13, 2015 Blynman Canal and Stacy Boulevard Bulkhead Improvement Projects 1.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Leads Institute of Technology & Engineering
Foundation – jay Desai.
Concrete Repair.
Substructure Groundworks - Hazards
Ness Bridge Construction
B.V.Patel Institute of Technology-Diploma studies
Guess What’s Behind the Box
Guess What’s Behind the Box
Organics Waste Processing Facility Construction Progress Update December 15, 2010
Guess What’s Behind the Box
Diaphragm Wall Construction Long sections of the cut and cover use diaphragm walls to support the sides of the open excavation, while work on the.
Pier Foundations Piers Suspended floor Ground beam Next slide.
REVISION 2 Basement 1.
Presentation transcript:

Tunnelling Across a River Using Immersed Tube Tunnelling Click through the slide show to see key stages in creating a tunnel across a river using Immersed Tube Tunnelling © Mott MacDonald Group Limited 2006 Within each slide, click to progress to the next stage of construction

Establish immersed tube tunnel anchor points Submerge immersed tube tunnel Reinstate river bed Construct diaphragm walls Construct cofferdam wallsFill cofferdam walls Drain cofferdam Remove and store quay wall Excavate and ground anchor Install support piles Construct tunnel box structure Reinstate quay wall Prop quay wall Fill behind quay wall Demolish quay wall cofferdam Construct cofferdam walls Fill cofferdam walls Drain cofferdamRemove and store quay wall Excavate and ground anchor Install support piles Construct tunnel box structure Reinstate quay wall Prop quay wall Fill behind quay wall Demolish quay wall cofferdam Dredge across riverInstall stub support piles Fetch immersed tube tunnel Rotate immersed tube tunnel into position Construct closure joint Tunnelling Across a River Using Immersed Tube Tunnelling © Mott MacDonald Group Limited 2006

Bedrock Silt Clay Dredge silt Dredge clay Blast and excavate into bedrock Install stub pilesLower immersed tube tunnel Grout beneath immersed tube tunnel Cast protective concrete slab Allow riverbed to reinstate Fill surroundings with sand and interlocking armour Tunnelling Across a River Using Immersed Tube Tunnelling © Mott MacDonald Group Limited 2006