The travel solution for our time 1 High-Speed Rail at Amtrak Frank Vacca, Chief Engineer June 24, 2011.

Slides:



Advertisements
Similar presentations
Introduction to Transportation Systems. PART III: TRAVELER TRANSPORTATION.
Advertisements

2010 Minnesota Comprehensive Statewide Freight and Passenger Rail Plan February 2010 presented by: Minnesota Department of Transportation and Cambridge.
Emerging California Passenger Rail Corridors A Comparative Look at the Future For Enhanced Passenger Rail in Coachella Valley/Banning Pass and the Delmarva.
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
Mid-Atlantic Rail Operations Study -- Benefit Assessment Presented by: Jack Lettiere, Commissioner New Jersey Department of Transportation Presented to:
STATE OF NEW YORK Andrew M. Cuomo Governor New York State DOT Joan McDonald Commissioner Presentation by NYSDOT to the Transportation Border Working Group.
First Statewide Comprehensive Rail Plan for MN Commissioned by 2008 Legislature Compliant with 2008 PRIIA Federal Rules 6 Months to prepare, 10 Months.
America’s Marine Highways Program Propeller Club October 4, 2012 Jim Murphy East Gulf Lower Mississippi System Gateway U.S. Department of Transportation.
OHIO & LAKE ERIE REGIONAL RAIL CLEVELAND HUB STUDY Ohio Rail Development Commission TMACOG Annual Transportation Summit September 29, 2003.
INTERCITY PASSENGER RAIL NORTHEAST UPDATE AASHTO – FEBRUARY 29,
1 Amtrak’s Vision for the Northeast Corridor PRIIA 305 Annual General Meeting – June 14 th, PRIIA305 DMU Approval Meeting Andrew Wood Chief, Next.
1 Amtrak Northeast Corridor Vision for High Speed Rail Proprietary – Not for distribution without Amtrak permission 1 1 How to build High Speed Rail (HSR)
Dan O’Neal, Chairman Washington State Transportation Commission.
Passenger Rail – Plan & Opportunities Engineer Contractor Conference Middleton, WI January 21, 2010.
Workshop on Infrastructures Key research to solve mobility barriers Claude Dumoulin Bouygues Travaux Publics (France) reFINE core team Industrial Technologies.
1 The Northeast Megaregion Robert Yaro President, Regional Plan Association Megaregions + MetroProsperity Sustainable Economics for the Texas Triangle.
Community Transit Solutions for the Suburbs APTA Annual Meeting September 30, 2013.
CE 515 Railroad Engineering Passenger Rail-Intercity and Commuter Rail Source: AREMA Ch. 10, REES Module 5 “Transportation exists to conquer space and.
CSSC Regional Rail Partners, September 18, 2012 Chesapeake Connector : Freight and Passenger Rail Benefits Study.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
1 CEE Areas of Specialization Transportation Construction Geotechnical Structures Environmental Water Resources.
SO YOU WANT MORE PASSENGER RAIL… LOOKING AT THE FUNDING LANDSCAPE ERIC PAPETTI FEDERAL TRANSIT ADMINISTRATION 12/10/2014.
High Speed Passenger Rail for Indiana August 21, 2012.
VIRGINIA RAILWAY EXPRESS SYSTEM PLAN 2040
ASSOCIATION OF AMERICAN RAILROADS Chicago Area Rail Infrastructure 16,000 acres, twice the area of O’Hare 78 yards, including 21 intermodal (rail-truck)
Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.
M IAMI F ORT L AUDERDALE W EST P ALM B EACH O RLANDO Addresses Florida’s demand for express, intercity rail travel. Is designed to serve tourists, business.
SUSTAINABILITY CONCEPTS IN TRANSPORT SECTOR/ OPTIONS AND BENEFITS
“President Obama’s vision for high-speed rail mirrors that of President Eisenhower, the father of the Interstate highway system, which revolutionized.

Opportunities for High Speed and Intercity Passenger Rail Development Midwest Projects Northeast Corridor (NEC) current & next generation Mike Franke,
1 HSIPR Caucus Briefing February 2012 Stephen Gardner Amtrak VP, NEC Infrastructure and Investment Development.
The Northeast Megaregion in a National Infrastructure Plan
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
Corridor Electrification Environmental Process SVLG Transportation Committee January 9, 2013.
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
High-Speed Intercity Passenger Rail Program March 14, 2011 Federal Railroad Administration.
Trains are better for our environment than other modes of travel.
Freight Issues in the Report of the National Surface Transportation Policy and Revenue Study Commission Transportation for Tomorrow.
May 25, 2010 Wisconsin High Speed Intercity Passenger Rail From vision to reality MADISON COMMUNITY MEETING John Oimoen, High Speed Passenger Rail Program.
Talking Freight Promoting Economic Revitalization through Enhanced Freight Transportation Eric G. Madden Deputy Secretary for Aviation and Rail Freight.
The Crescent Corridor Intermodal Freight Project Improving Lives and Livelihoods IN & AROUND DC Washington, DC December 16,
The Future of Freight and High Speed Rail in Today’s Economy SASHTO Annual Conference – Biloxi, MS Shayne Gill Program Manager Aviation, Passenger Rail.
Authorization of a New Federal Transportation Program AASHTO Executive Director John Horsley Subcommittee on Design Albuquerque, New Mexico July 15, 2008.
Imagine the Possibilities… Vision from the 2002 Rail Plan.
NCDOT Rail Division Managing Multi-modal Projects within a Corridor Freight in the Southeast February 10, 2011.
1 Northeast Corridor - Overview Regional Plan Association Spring 2010.
Los Angeles County Metropolitan Transportation Authority Overview of Metro’s Transportation Program Pam O’Connor Metro Chair July 25, 2007.
CSXT Intermodal SCORT September 2010 CSXT Intermodal SCORT September 2010.
1 Les Passa CSX VP – Strategic Planning. 2 Transportation marketplace supports long term rail growth Global market opportunities are increasing CSX’s.
Nate Asplund Director – Public Private Partnerships September 20, 2009 SCORT 2009 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII.
Amtrak: America’s Railroad Todd Stennis, Director Government Affairs, South.
Impact of the California High Speed Rail System Lee Ann Eager, Chief Operating Officer Economic Development Corporation serving Fresno County.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
Amtrak Gov’t Affairs October 19, 2007 Amtrak Key Facts Summary November 12, 2007.
CHAPTER 17 RAIL PASSENGER SERVICES IN U.S..
Summary and Wrap-up Discussion 8 July 2015
What Part Does Transportation and Land Use Play in Tackling Climate Change & Greenhouse Gas Emissions? Gordon Garry Director of Research and Analysis,
City of Joliet - Sustainability City of Joliet Sustainability Initiatives American Planning Association National Conference April 16, 2013.
Objective Transportation Assets Strategic Intermodal/International Points Next Steps & Discussion Critical Issues for Ohio.
Intercity Passenger Rail: Legislative Policy Recommendations Astrid Glynn Chair ASC Intercity Passenger Rail Legislative Team AASHTO Standing Committee.
Transportation System Engineering 1 , 61360
Beyond the Crossroads James Stem National Legislative Director United Transportation Union May 27, 2009.
Virginia Rail Program Update Virginia-North Carolina High Speed Rail Compact Commission Meeting March 21, 2016 Jennifer Mitchell Agency Director.
Transportation Today Policy, Freight, Intercity Travel
ASSOCIATION OF AMERICAN RAILROADS. ASSOCIATION OF AMERICAN RAILROADS.
Chicago to Council Bluffs-Omaha
Presentation transcript:

The travel solution for our time 1 High-Speed Rail at Amtrak Frank Vacca, Chief Engineer June 24, 2011

The travel solution for our time 2 Rail Resurgence Record ridership Record revenues 19 months of month over month improvement Fuel costs climbing Favorable transportation and energy policies HSR excitement

The travel solution for our time 3 HSR Opportunities in America Florida – Project Cancelled California – 220 mph – 800 mile network – $3.5B in HSIPR grants – ($45B investment) Midwest (Midwest Regional Rail Initiative) – $1.1B grant - St. Louis-Chicago line (110 mph) Northeast Corridor (NEC) Operating Today – Next Gen-HSR plan – Stair-step approach

The travel solution for our time 4 2 nd largest mega-region in the world Economic and political capital of the Americas Population density =/> Europe and 12 times US average 457 route miles 12 states, DC 8 commuter operators Class 1 and regional freight Amtrak high speed, regional, long-distance 8 airports 12 ports 50 million people (Northeast megaregion) Northeast Corridor – Regional Overview

The travel solution for our time 5 NEC Master Plan NEC Commission sponsored: NEC Master Plan ($52 Billion) - Goals – Corridor to state-of-good repair – 2030 planning horizon – Maximize capacity and travel times in corridor – Continued shared-use railway operation (freight, commuter, regular and high-speed) Existing Master Plan (2030) 2:42 2:15 3:35 3:08 NYC - DC NYC - BOS Travel Times

The travel solution for our time 6 Northeast Corridor Amtrak Ridership Growth Under Master Plan +35% +33% +10% +8% Capacity- Constrained Growth By 2030 Under NEC Master Plan – Capacity exceeded – Limited ability to: ◦ Increase service ◦ Lower travel times ◦ Attract New Riders NEC intercity travel demand will double by 2050 Other NEC modes have limited growth potential Corridor needs new capacity to compete in worldwide economy

The travel solution for our time 7 Amtrak Next Gen HSR Vision World-Class High-Speed Network – Dedicated 2-track alignment – 220 mph equipment – 40% - 60% travel-time reductions in key markets – Boston–Washington DC: from 6:30 to 3:20 NYC - DC NYC - BOS Existing Master Plan (2030) 2:42 2:15 3:35 3:08 1:36 1:24 Next-Gen HSR Plan

The travel solution for our time 8 Amtrak Next Gen HSR Vision Rolling Stock – Similar to Acela but 8 vs. 6 cars – 400-passenger capacity – Speeds up to 350 kph – EMU-style distributed power, bi-level consists also possible Infrastructure – Dedicated 2-track system – Minimum 4 tracks at stations (turns & passing moves) – Heavy use of tunnels & structures to meet alignment requirements, minimize impacts

The travel solution for our time 9 Potential Alignments: NY to BOS Challenges Boston to New York alignment poses difficult challenges Capacity limits on New Haven Line Curvature, capacity and environmental concerns on Shore Line (New Haven to MA state line) Analyzed Alignment Diverges north of New Rochelle to serve CT and RI Converges with NEC alignment at Rt. 128 station in MA “Analyzed Alignment’ used for costing and analysis purposes, subject to further analysis in next phase

The travel solution for our time 10 Challenges Utilize existing NEC corridor where possible Providing service to built-up CBD areas in key cities Analyzed Alignment Substantially parallels NEC New stations in Baltimore and Philadelphia more centrally located “Analyzed Alignment’ used for costing and analysis purposes, subject to further analysis in next phase Potential Alignments: DC to NY

The travel solution for our time 11 $117 Billion (in $2010) – Equivalent of $4.7 Billion annually over 25 years of construction – $275 million/mile for infrastructure, stations, facilities – 55 train $51 million each Capital Investment Costs Phasing of Construction – Four phases over the 2015 to 2040 period – Phases 1-3 (2015–2030): New York to Washington – Phase 4 (2024–2040): New York to Boston

The travel solution for our time 12 40% Increase in Acela CapacityAcela II Fleet Doubles Capacity 160 mph Service South of NYC NEC Gateway: Newark to NYC Next Gen HSR MOS: NYC to PHL Next Gen HSR South to Wash D.C. Next Gen HSR North to HartfordNext Gen HSR to Boston NEC Stair-Steps to Next-Gen HSR Vision Fast-Track HSR Program Full Next-Gen HSR Network

The travel solution for our time 13 Initial “Fast-Track” (2022) – “ Gateway” Project from NJ into Moynihan Station – Next-Gen HSR segment Newark to Frankford Junction – Master Plan improvements Philadelphia to Washington, DC “Fast-Track” Segment

The travel solution for our time 14 Gateway Project

The travel solution for our time 15 NEC Gateway: Penn Station & Network Expansion

The travel solution for our time 16 NEC Stair-Step Approach Additional ACELA cars 40% capacity increase Purchase of ACELA II’s

The travel solution for our time 17 Other NEC Approved Projects Maryland Bridge replacement Harold Interlocking – Amtrak bypass track Kingston, RI - passing track construction B&P Tunnel replacement

The travel solution for our time 18 Safer Fast, safe and secure rail travel Fewer highway accidents Greener Reduces energy use, emissions Supports dense, smart urban development patterns Strengthens existing commuter and transit systems and riders Healthier Comfortable, convenient travel supports affordable, livable & sustainable communities Minimize land area needed to meet future travel demand HSR Advantages

The travel solution for our time 19 NEC HSR System Capacity – Up to 50 million annual passengers – Up to 8,000 passengers/hr. in each direction – 2040 service plan = ~25% of capacity Highway Equivalent – 8,000 travelers/hr. = 5,300 cars – Requires 3 highway lanes in each direction Difference – Speed – Direct downtown-to-downtown connection – Less energy and emissions HSR Advantages

The travel solution for our time 20 HSR Factors Market Competition Trip Time – Top speed vs Average speed Service Frequency Incremental vs Greenfield Funding

The travel solution for our time 21 Amtrak HSR Factors Market – One of the most populated corridors in the World Competition – Airlines –Presently have 70% NY to DC and 55% NY to Bos Trip Time –Very sensitive – NY to DC 2hrs / NY to Bos 3hrs –High top speed necessary to meet trip time Frequency –Critical Incremental/Greenfield –Mixed Funding –Varies

The travel solution for our time 22 How Does Speed Influence Cost Up to 110 mph –Wood ties –Cab signal systems/PTC –Grade crossing acceptable –Diesel acceptable 111 to 186 mph –Concrete ties –Catenary –No grade crossings –ROW fencing –No movable bridges -/fixed high level bridges 187 to 220+ mph –Slab Track? –Intrusion systems –Noise mitigation * Higher the speeds the tighter maintenance tolerances leading to higher maintenance costs HSR Funding

The travel solution for our time 23 Thank You