Presentation on Coal Market in India 2012 2 th Annual Conference 10.07.2012 P N Shukla Director (Operations and Business Development) DFCCIL, New Delhi.

Slides:



Advertisements
Similar presentations
Introduction to PPP in the EU RCC PPP Conference, Sarajevo, 25 September 2009 Michael Burnett, Director, European PPP Forum, European Institute of Public.
Advertisements

March 2012 Ports and Cities Conference Newcastle Dorte Ekelund, Executive Director Major Cities Unit Department of Infrastructure and Transport
Indian Railways Update 10 th IHHA Conference 2013 New Delhi.
Opportunities for Public-Private Partnerships in Railways 20 th May 2006.
THE OHIO RAIL DEVELOPMENT COMMISSION + THE CSX NATIONAL GATEWAY FHWA Talking Freight Webinar April 17, 2013.
ABN MELBOURNE TO BRISBANE INLAND RAIL SYMPOSIUM Bryan Nye, ARA CEO 22 June 2012.
EICC - EUROCHAMBERS - ICC TRADE AND INVESTMENT PARTNERSHP SUMMIT INDIA 3.0 AND ITS INVESTMENT OPPORTUNITIES Mr Ravi Parthasarathy Chairman Infrastructure.
LOG 470 Contemporary Issues in Logistics
Rail Baltica RETURN TO EUROPE IN NEW QUALITY
 Hartsfield–Jackson is ranked as the world's busiest airport, both in passengers and number of flights.  In 2011 it accommodated 92 million passengers.
NORTHERN RAILWAY AN OVERVIEW 1. NORTHERN RAILWAY ROUTE MAP 2.
Viability Gap Funding By Ashok Chawla Additional Secretary Department of Economic Affairs, Government of India 20 th December, th December, 2006.
Public Private Partnership in Ports By A.K. Mohapatra Secretary Department of Shipping.
1 Presentation on Building Infrastructure : Challenges & Opportunities Sh. Vijay Singh,Secretary Deptt. of Road Transport & Highways Govt. of India Presentation.
1 India - Opportunities in Infrastructure for Foreign Investors Arvind Mayaram Department of Economic Affairs Ministry of Finance Government of India.
U.S. Railroad Industry Federal Railroad Administration U.S. Railroad Industry Federal Railroad Administration.
Emerging Opportunities in Port Sector By A. K. Mohapatra Secretary, Department of Shipping, Ministry of Shipping, Road Transport &Highways.
Presentation by: Permanent Secretary - PMORALG Mr. Jumanne Sagini 3 rd June 2014.
HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.
By Dr. Harjit S. Anand Co-President, The EuroIndia Centre Telephones: / 3806 Mobile:
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
INDIA’S INFRASTRUCTURE – Issues and Prospects PRESENTATION BY SS Kohli Chairman & Managing Director INDIA INFRASTRUCTURE FINANCE COMPANY LTD NEW DELHI.
1 THE INFRASTRUCTURE OPPORTUNITY : A MACRO PERSPECTIVE Rajiv B. Lall Managing Director & CEO Infrastructure Development Finance Company Limited JAPAN MAY.
TRACECA PROJECT REPAIR AND REHABILITATION OF FERRY COMPLEX VARNA.
PREPARATION OF PERSPECTIVE PLAN FOR
Bangalore City Metro Rail for Public Transport and CDM Energy Economy & Environmental Consultants Bangalore INDIA.
Gujarat Ambuja Cements Limited Wednesday, November 1, 2006.
INDIAN RAILWAY VISION CAPACITY CREATION BY More than 30,000 kms of route would be double / multiple lines (compare to around 18,000 kms today).
By Suresh Gupta, Dean/IRICEN. INTRODUCTION Growth in GDP during expected to be 8.1% likely to increase further in coming years. Economic growth.
Talking Freight Promoting Economic Revitalization through Enhanced Freight Transportation Eric G. Madden Deputy Secretary for Aviation and Rail Freight.
NEW STRATEGY FOR TRANSPORT GOVERNANCE IN MONTREAL March EMTA Meeting, Madrid.
1 Transportation Infrastructure Programs Past, Present & Future Transportation Association of Canada Fall Conference September 2011 Edmonton, Alberta.
February 2014 Bus Rapid Transit for Chennai. Chennai city bus service GOOD PATRONAGE  50 lakh daily passenger trips  3650 buses  Maximum flow of.
TRANSPORT MANAGEMENT RENUKA MEHRA LECTURER B.B.A.III GCCBA-42.
A TURN AROUND STORY LEADING CHANGE ANDTRANSFORMATION INDIAN RAILWAYS Presentation for Japan-India PPP Seminar, New Delhi (organized by NCAER) 14 th February,
Earning Enhancing Schemes Sanjay Upreti PAM. Rolling Stock Assets Locomotives Diesel Electric Steam Total Wagons Coaches
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
Greening Freight & Transportation Corridors Commission for Environmental Cooperation Mapping the road to a sustainable future.
STANDARD MOVING & FIXED DIMENSIONS FOR DEDICATED FREIGHT CORRIDOR.
Indian Road Construction. ROAD TRANSPORT SCENARIO Economic Growth : 5 - 6% Road Transport Sector Demand Grows at 10 – 12% Need for Road & Transport Infrastructure.
Oct Project Fund- An Instrument to Finance Infrastructure Projects Two Case Studies.
DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES
Public Transportation Planning: Rapid transit solutions for adequate mass movement Mobility.
16 th JRM FINANCIAL MANAGEMENT Thematic Session 21 st July 2012.
1 ENERGY SECURITY CHALLENGES AHEAD A Railway’s Perspective By R.S Grover, Advisor Electrical Rail Vikas Nigam Ltd.,New Delhi.
India : Perspective On Infrastructure Investments Vinayak Chatterjee Tokyo May, 2007 by.
KENYA RAILWAYS DEVELOPMENT AND INVESTMENT INITIATIVES:
INDIAN RAILWAYS  I. Rly. Vision for Next 10 Years  Opportunities for International Partners A Presentation by – Mr. Arbind Kumar Director (Projects)
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
ADB – Transport Sector Operations in India New Delhi, 26 October 2012 India- Spain Multilateral Partnership Meeting.
The Transportation Logistics Company Indiana Logistics Summit Infrastructure Needs and Opportunities September 26, 2007.
Road Infrastructure.. ► Current Status ► Gaps ► Challenges ► Govt. Initiatives ► Investment Required.
Title: Road vs. Rail… A shift towards rail Date: 16 Nov 2015.
CONTAINERS INDIA 2014 Challenges in transporting containers to Hinterland Sanjay Swarup GGM, CONCOR 20 th August 2014, Hotel Lalit, Mumbai.
Opportunities for Spanish Engagement Few Ongoing and Upcoming WB funded Transport Projects October 26, 2012.
Role and Importance of Containers in Multimodal Transport
ROLE OF RAILWAYS IN DEVELOPMENT OF INTER-MODAL HUBS
Stage 2 Light Rail Transit Program “In the ground ready”
Challenges and solutions for transport in Norway
West of England Joint Transport Study
National Academy of Indian Railways
GHG Mitigation in Rail Sector
Vice President: Lin Zhonghong Economic & Planning Research Institute
LOGISTICS INDUSTRY IN INDIA.
12thJune, 2016 Science City, Kolkata.
VR in brief Annual net turnover EUR 1,139.9 million Personnel 14,400
Quantifying the economic benefits of changing the Gauteng to Durban railway corridor from narrow to standard gauge Christian Demmerez de Charmoy Prof.
LOGISTICS INDUSTRY IN INDIA.
Presentation transcript:

Presentation on Coal Market in India th Annual Conference P N Shukla Director (Operations and Business Development) DFCCIL, New Delhi 1

DFCC PROJECT AN OVERVIEW

 Transport Sector : Present Scenario  Indian Railways :  Overview  Areas of Concern  Possible Solutions  Dedicated Freight Corridor  Overview  Traffic Projections  Funding Arrangements  Opportunities  DMIC – An Added Feature  Impact on Urbanization  Social & Environmental Issues on DFC  Carbon Footprints of Dedicated Freight Corridor Scope of Presentation

Transport Sector – Present Scenario ONE OF THE LARGEST IN THE WORLD SERVES A LAND MASS OF 3.3 MILLION M 2 AND POPULATION OF OVER ONE BILLION ENORMOUS GROWTH OF TRANSPORT SECTOR IN THE LAST 50 YEARS – VOLUME OF RAILWAY FREIGHT INCREASED TEN FOLDS. – LENGTH OF SURFACED ROADS INCREASED NINE FOLDS – TONNAGE HANDLED BY INDIA’S MAJOR/MINOR PORTS INCREASED SIXTEEN FOLDS – AIR FREIGHT TONNAGE INCREASED 30 FOLDS Source:- India Vision 2020

“Clogged Rail Lines Slow India’s Development” New York Times June 15, 2010 “Clogged Rail Lines Slow India’s Development” New York Times June 15, 2010 Distance Travel Time (Freight) Singapore – Mumbai Port 2400 Nautical Miles 4 – 5 days Mumbai Port - Delhi870 Miles More than 1 Weeks

Indian Railways – An Overview

AN INCREASE OF MT OVER 50 YEARS

Indian Railways – An Overview

Railways Vision 2020 Enhance gross revenue from 1.2% to 3% of GDP by 2020 Annual growth of 10% for next ten years Network expansion by 25,000 Kms. by 2020 Segregation of passenger and freight lines on high- density network routes Maximum speed of passenger trains to be raised from 110 / 130 Kmph at present to 160 / 200 Kmph on segregated routes by 2020 Increase the speed of freight trains from 75 to 100 Kmph Gauge conversion programme to be completed Electrification of 33,000 Kms. of routes Making railway operations free of accidents

COMMODITY (MT) (UP+DN) Container COAL Foodgrains Fertilizers Cement Salt I&S POL Misc Empties0.00 RORO TOTAL Traffic Projections On DFC Route On Eastern Corridor Source: Business Plan of DFC

CAPACITY BUILDING IN THE RAILWAYS ONLY TWO POSSIBILITIES _ _ _ _ _ UPGRADING THE EXISTING NETWORK. CREATION OF A NEW DEDICATED FREIGHT CORRIDOR.

GOLDEN QUADRILATERAL & ITS DIAGONALS ARE BUSIEST ROUTES OF IR High Density Corridor (Golden Quadrilateral + Diagonals) 16% of route Km carries 52% of passenger & 58 % of freight DELHI MUMBAI KOLKATTA CHENNAI

13 CONCEPT PLAN OF DEDICATED FREIGHT CORRIDOR NETWORK MUMBAI DELHI CHENNAI KOLKATA LUDHIANA VIJAYAWADA Sanctioned projects Unsanctioned projects VASCO DELHI LUDHIANA MUMBAI DELHI

Dankuni Ludhiana

Feeder Routes – Eastern Corridor

Rewari J N PORT

Feeder Routes of Western Corridor

State-wise Kms. (approx.)StateKms. West-Bengal221 Jharkhand319 Bihar93 Gujarat588 Haryana274 Maharashtra166 Punjab102 Rajasthan553 U.P.1002 Total3318

CORRIDOR Route Length (Km) Basic Const. Cost (Cr.) Eastern Corridor- Dadri – Khurja - Sonnagar – Dankuni (D/L) 1422 Kms Khurja - Ludhiana (S/L) 413 Kms Western Corridor- from JNPT (Near Mumbai) to Dadri via Palanpur – Ajmer – Phulera – Ringus – Rewari Total * Cost at 2009 prices * Length & Cost of Corridors

Completion Cost as Per Business Plan Eastern CorridorRs Crs Western CorridorRs Crs TOTALRs Crs  The additional costs are on account of inflation and soft costs such as Insurance, Taxes, Contingency and Interest during construction.  The Project Completion is 31/3/2017.

FUNDING ARRANGEMENT  Eastern Corridor : Mughalsarai – Khurja 732 Kms (D/L) World Bank Khurja – Ludhiana 413 Kms (S/L)World Bank Sonnagar-Mughalsarai 122 Kms (D/L)GOI Sonnagar-Dankuni 534 Kms (D/L)On PPP Mode  Western Corridor : Rewari – Vadodara 920 Kms (D/L) JICA (Ph.I) Dadri-Rewari & 605 Kms (D/L) JICA (Ph.II) Vadodara - JNPT

Importance of DFCC Dedicated Freight Corridor enlisted as one of the iconic/ Flagship project of India. The Progress of DFCC is being monitored by:  Cabinet Committee on Infrastructure (CCI) chaired by PM, High Power Committee under the Chairmanship of Principal Secy. to PM, Standing High Power Committee of Railway Board, Committee of Additional member & Advisor of Railway Board  Considering its importance of the Project MOR has been asked to submit monthly progress report to Planning Commission.

Traffic Growth with DFC on Busy Sectors of EDFC & WDFC (Number of Trains per day both ways) Eastern Corridor Sonnagar - Mughalsarai Mughalsarai – Allahabad - Khurja Western Corridor Palanpur - Rewari JNPT - Palanpur Traffic nearly doubles after 15 years

DFCCIL & ITS MANDATE

BRIEF PROFILE OF THE COMPANY DFCCIL registered as Schedule ‘A’ Company under the Companies Act 1956 on 30th Oct, % Ownership of GOI-to begin with. Authorized Capital 4000 Crores. Paid Up Capital 1165 Crores. Debt : Equity 2: 1 100% Equity of Ministry of Railways.

Mandate for DFC as per Cabinet Decision DFC project to be implemented through SPV. SPV entrusted with planning, construction, maintenance and operation of DFC infrastructure. SPV to be independent in decision making and should be able to function with market focus and business orientation during Construction maintenance & operation. SPV to have status of railway administration under Indian Railways Act, The relationship with Railways and DFCC to be governed by Concession Agreement. All contracts would be based on Design & Build lump sum with time bound completion.

MILESTONE ACHIEVED April 2005 MR announced in the Parliament the need and planning for the project. August 2005 PM announced development of DFC in his I-Day Speech. August 2006 CCEA approved formation of a SPV (DFCCIL) for execution of the project. October 2006 DFCCIL incorporated as a Company. February 2007 CCEA approved the PETS reports by RITES at a cost of crores. February 2008MR’s commitment in Parliament to start work on Both Corridors during March 2010JICA Loan Agreement signed for Western Corridor. March 2011World Bank loan for Phase-I Eastern Corridor finalized May 2011WB sanctioned loan for Khurja – Kanpur March 2012Kanpur-Khurja bids opened. Contract likely to be awarded by Sept

28 Basic Design Features Height Width m 7.1 m 3200 mm 3660 mm 700 m 700/ 1500 m 4,000 Ton 15,000 Ton 5.1m Western CorridorEastern Corridor Moving Dimensions Container Stack Train Length Train Load Indian Railway DFC Routes Western CorridorEastern Corridor

29 Heavier Axle Loads Axle Load Track Loading density 22.9 t / 25 t 32.5t/25 t 8.67 t/m 12 t/m 75 Kmph 100 Kmph Basic Design Features (Contd) Indian Railway DFC Routes Maximum Speed Grade Upto 1 in 1001 in 200

Operating Aspects of DFCC DFCC to manage train operation on DFC. DFCC to have stations and control centres. There will be Junction points at every kms for interchange of traffic between DFC and IR. The rolling stock to be provided by IR. Maintenance facilities for rolling stock to be provided by IR. 896 Level Crossings on Eastern and Western Corridors to be replaced with ROBs/ROB’s 30

31 Timelines for DFC Construction Eastern Corridor Commissioning of Eastern Corridor 31 December 2016 Western Corridor Phase – I Commissioning of Rewari – Vadodara 31 st December 2016 Phase – II Full Commissioning of J.N. Port - Dadri 31 st March 2017

Future of Coal Transportation by DFC  Induction of 25T axle load wagon.  Change in CC of trains from 4000 T to 6500 T.  Introduction of bottom discharge wagons.  Time guarantee for train movement.  Reduction in transit time to half.  Economy & Reliability in coal movement.  Unit cost of transport in DFC to come down by 40 %.  Power & Coal companies may have freedom of special wagons.  Transit Guraantee Agreement with Power & Coal companies for coal movement.

Carbon Footprints of Dedicated Freight Corridor x- 6 x Eastern Corridor (1975 Billion Tonne-Km) Western Corridor (3241 Billion Tonne-Km) Cumulative GHG emissions over 30 years Source: Report on ‘Green House Gas Emission Reduction Analysis for DFC’ by Ernst & Young

FUTURE 4 CORRIDORS MR announced study of other four corridors in her Budget Speech in February  East – West Corridor (Kolkata–Mumbai) 2000 Kms.  North-South Corridor (Delhi-Chennai) 2173 Kms.  East Coast Corridor (Kharagpur-Vijayawada) 1100 Kms.  Southern Corridor (Chennai-Goa) 890 Kms. DFCCIL has assigned this study to RITES which will take about 2 years.

DELHI – MUMBAI INDUSTRIAL CORRIDOR (DMIC) – AN ADDED ADVANTAGE FOR DFC Focus is on ensuring high impact developments within 150km distance on either side of alignment of DFC Area under Project Influence is 14% and population is 17% of the Country Total Population in the Project Influence Area : 178Mn Total Workers in the Project Influence Area: 70.56Mn As per Census-2001 DFC Alignment End Terminal Haryana Dadri J.N.Port Rajasthan Maharashtra Gujarat Madhya Pradesh Haryana Uttar Pradesh