International Workshop on Institutional Capacity Development in Transboundary Basins 10 - 12 November 2008, Bonn, Germany Le Duc Trung Acting Secretary.

Slides:



Advertisements
Similar presentations
Mekong River Commission (MRC) Impact Assessment Tools and Processes on Water and related Resources Regional Workshop to Review GEO/IEA Training Manual.
Advertisements

Thailand water management policy: Case of the Mekong River Basin
The Mississippi/Mekong Partnership. The Mekong River looking toward Laos.
1 The 2 nd Green Mekong Forum International Conference on “Green Mekong Initiative” Water Resources Management in Lao PDR By: Mr. Phousavanh Fongkhamdeng.
A STORY IN THREE PARTS JRP Training – 7 June 2012.
“Participatory approaches towards water management: transboundary cooperation in the River Lielupe (Latvia/Lithuania) ” 9 June 2005, St. Petersburg,
Law as a Tool for Cooperation and Sustainable Development of the Mekong River.
International Workshop on Institutional Capacity Development in Transboundary Basins, November 2008, Bonn, Germany Governance and Institutional Arrangements.
Asian region workshop on “capacity development for the clean development mechanism” October 2005, AIT, Bangkok, Thailand VIETNAM DNA INSTITUTIONAL.
1 Module 2 Mekong Resources, Benefits to people, and Planning Issues session 1 : The Mekong and its water resources.
A project implemented by the HTSPE consortium This project is funded by the European Union SUSTAINABLE GROWTH LIFE
Knowledge on HIA IN CAMBODIA Constructing a Caring and Sharing Community Roles of HIA 4-6 October 2012 Bangkok.
1 ADB Support to Transboundary Water Resources Management in Central Asia Hong Wei Country Director Uzbekistan Resident Mission Asian Development Bank.
The United Nations Economic Commission for Europe (UNECE) Convention on the Protection and Use of Transboundary Watercourses and International Lakes A.
Project Implementation Plan and Principal Activities
1 The 14 th Meeting of the ASEAN Working Group on Water Resources Management (AWGWRM) Increasing Long Term Awareness Knowledge and Community Participation.
INTRODUCTINON TO INTEGRATED WATER RESOURCES MANAGEMENT Module 1 Session: What is Integrated Water Resources Management?
Preliminary theory of change for the South China Sea Project Cluster Neeraj Negi Reference Group Meeting Bangkok, Thailand September 27, 2010.
GHANA Developing CSA within the National Agriculture Sector Investment Plan while reinforcing inter-sectoral consistency: progress, bottlenecks and support.
UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes A unique framework for improved management of shared waters.
1 Asian Regional Workshop on “Capacity Development for the Clean Development Mechanism” October 2005 AIT, Bangkok, Thailand Institutional Building:
Joanna Fiedler Enlargement and Neighbouring Countries Unit DG Environment European Commission REReP → RENA Vision of the European Commission PEIP Regional.
Protocol on Water and Health Realistic Targets – Achievable Action Plans 5 th World Water Conference, Istanbul Senior Adviser Carola Bjørklund.
 LHD was set up as a network for Lao CSOs  It was jointly established with local non-official and voluntary members of CSOs.
Kavala Workshop 1-2 June 2006 Legal protection of Transitional Waters [in the Cadses area]: A comparative analysis Dr. Petros Patronos / Dr. Liliana Maslarova.
Strategic Planning MRC first Strategic Plan for Revised in 2000: Current Strategic Plan Vision and Mission remain unchanged Goals updated.
2 International efforts to coordinate Mekong water development started in 1920s – Series of international agreements mainly for navigation and boundary.
The Governments of Cambodia, Lao PDR, Thailand and Viet Nam signed the; “Agreement on the Cooperation for the Sustainable Development of the Mekong River.
CARTAGENA PROTOCOL ON BIOSAFETY NDA- DEAT BILATERAL MEETING 1 August 2003 Presenter : M. Mbengashe.
1 Basin Development Plan BDP : Planning process & tools to identify, categorise & prioritise joint or basin-wide projects and programs VISION : Contribute.
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
Outcomes from the Regional Workshop on Forest and Climate Change: Phnom Penh, Cambodia May 2009 REDD Consultation Support to ASEAN Senior Officers.
1 E u r o p e a n C o m m i s s i o nDirectorate General Environment EU Water Initiative The EU Water Inititative The EECCA component.
2 HISTORY OF MEKONG COOPERATION IRBP Course PP 2.4.
Overview of Legal and Institutional Framework Overview of Legal and Institutional Framework MRC Orientation for New Staff, 24 October 2002.
The partnership principle and the European Code of Conduct on Partnership.
HIV/AIDS Prevention in the Infrastructure Sector 14 March 2008 Sector Strategy Development Department, Japan Bank for International Cooperation (JBIC)
Cartagena Protocol on Biosafety Cartagena Protocol on Biosafety And India’s Obligations By Desh Deepak Verma Joint Secretary, Ministry of Environment and.
Promoting Decent Work for All 1 Strategic Partnerships for Realizing Decent Work in Asia: ILO-ASEAN Cooperation August 23, 2007 Kee Beom Kim ILO Jakarta.
Saghit Ibatullin - Chairman of the EC IFAS "Strengthening regional cooperation on water: role of the Executive Committee of the International Fund for.
2 HISTORY OF MEKONG COOPERATION IRBP Course PP 6.1.
The Mekong River Commission Presented by Mr. Detsada Soukhaseum, Mekong River Commission Secretariat, 16 November 2015.
River Basin Management in Southern Africa Barbara Schreiner.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
1 Mekong Resources, Benefits to people, and Planning Issues session 1 : The Mekong and its water resources.
The Mekong River Commission: Challenges, Mission, and Strategies.
Flood Task Force Report to the 4th Meeting of the Parties 20 to 22 November 2006 Bonn.
Regional Action Plan for Sustainable Transport of Dangerous Goods along the Mekong River Final Regional Workshop, October 2014 Bangkok, Thailand.
6 June 2007 Dias 1 Peter Furu DBL – Centre for Health Research and Development, Charlottenlund, Denmark WHO Collaborating Centre for Health and Environment.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
Mekong River – Negotiations Kamran Soomro Shabeena Faraz Zareen Fiza Qureshi.
6Standards for the planning, design and construction of ports and terminals OBJECTIVE: To ensure that Ports and Terminals are planned, designed and constructed.
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
Mekong River Basin Transboundary Waters Management: Innovative Tools for Collaborative Decision-making World Water Forum March 21, 2009.
The Mekong River Commission: Challenges, Mission, and Strategies.
Mekong Water Utilization Project (WUP) GEF IW C4 August 1, 2007.
REPUBLIC OF ALBANIA PUBLIC PROCUREMENT AGENCY Eighth Regional Public Procurement Forum May, 22-25, 2012 Tirana
1 Legal Frameworks for Public and Stakeholder Engagement by Carl Bruch Asia Regional Workshop on Stakeholder Engagement in International Waters Management.
Western Balkans Climate Resilience Workshop, Vienna, 11 – 12 May 2016.
Mekong River Commission, Tools to Implement the 1995 Agreement - Dr Choomjet Karnjanakesorn, WUP Team Leader 28-Apr-17 Mekong River Commission (MRC) Water.
GOVERNMENT OF CAMBODIA GOVERNMENT OF LAO GOVERNMENT OF THAILAND GOVERNMENT OF VIETNAM COUNCIL (Members at Ministerial and Cabinet level) *Chairman and.
WHEN RATIFICATION SPEAKS LOUDER THAN AID: Why Australia ratifying the UN Watercourses Convention can ‘aid’ water governance and resource management in.
Roles and Functions of Basin & sub-basin organizations
Cooperative Environmental Audit on Mekong River Basin Management
Cambodia National Work Plan
Encouraging RAI in the Region
Integrated Water Resources Management Nam Ngum River Basin – Pilot Project Lao PDR Nam Ngum River Basin Committee Secretariat & Department of Water Resources.
The role of the ECCP (1) The involvement of all relevant stakeholders – public authorities, economic and social partners and civil society bodies – at.
Transboundary cooperation in the Dniester River basin
Presentation transcript:

International Workshop on Institutional Capacity Development in Transboundary Basins November 2008, Bonn, Germany Le Duc Trung Acting Secretary General Viet Nam National Mekong Committee

International Workshop on Institutional Capacity Development in Transboundary Basins November 2008, Bonn, Germany Mekong Basin & Cooperation Mekong River Basin covers Chiana, Myanmar, Lao, Thailand, Cambodian and Viet Nam Mekong River Basin covers Chiana, Myanmar, Lao, Thailand, Cambodian and Viet Nam The river ranked 12 th in length & 8 th in flow The river ranked 12 th in length & 8 th in flow Viet Nam contributes 8% in area and 11% in flow Viet Nam contributes 8% in area and 11% in flow Mekong cooperation was started in 1957 focusing on planning of water resource development Mekong cooperation was started in 1957 focusing on planning of water resource development After a brief break (2 years), IMC was formed After a brief break (2 years), IMC was formed With the Cambodia came back, the Agreement on the Cooperation for the Sustainable Development of the Mekong River Basin was signed in 1995 With the Cambodia came back, the Agreement on the Cooperation for the Sustainable Development of the Mekong River Basin was signed in 1995 Mekong River Commission was established to cooperate in all fields of sustainable development, utilisation, management and conservation of the water and related resources of the Mekong River Basin Mekong River Commission was established to cooperate in all fields of sustainable development, utilisation, management and conservation of the water and related resources of the Mekong River Basin

International Workshop on Institutional Capacity Development in Transboundary Basins November 2008, Bonn, Germany MRC Institutional Set-up Members are Governments of Cambodia, Lao PDR, Thailand Members are Governments of Cambodia, Lao PDR, Thailand and Viet Nam China and Myanmar, are dialogue partners to the MRC China and Myanmar, are dialogue partners to the MRC MRC consists of three permanent bodies: MRC consists of three permanent bodies: The Council with member of ministerial level The Joint Committee with member at no less than Department Director General level ;and The Secretariat located in Vientiane, Lao PDR, and headed by a CEO to provide technical and administrative services to the JC and the Council The MRC is funded by contributions from the four member countries and from aid donors. The MRC is funded by contributions from the four member countries and from aid donors. Donor Consultative Group meeting are organized annually to ensure effective consultation with donor community Donor Consultative Group meeting are organized annually to ensure effective consultation with donor community

International Workshop on Institutional Capacity Development in Transboundary Basins November 2008, Bonn, Germany Institutional Arrangements Governed by the 1995 Mekong Agreement, a number of legislative documents have been prepared, widely known as the set of Water Utilization Rules: Procedures for Data and Information Exchange and Sharing (approved 2001); Procedures for Data and Information Exchange and Sharing (approved 2001); Procedures for Notification, Prior Consultation and Agreement (approved 2003); Procedures for Notification, Prior Consultation and Agreement (approved 2003); Procedures for Water Use Monitoring (approved 2003); Procedures for Water Use Monitoring (approved 2003); Procedures for Maintenence of Flows on the Mainstream (approved 2006); Procedures for Maintenence of Flows on the Mainstream (approved 2006); Procedures for Water Quality (pending for approval); Procedures for Water Quality (pending for approval); Guidelines for Transboundary Environmental Impact Assessment (under preparation) Guidelines for Transboundary Environmental Impact Assessment (under preparation) And other Techncial Guidelines to implement approved docs And other Techncial Guidelines to implement approved docs Establishment of permanent or ad-hoc bodies (sub-committees, working groups, task forces …) And set-up of bilateral channels

International Workshop on Institutional Capacity Development in Transboundary Basins November 2008, Bonn, Germany Ialy Hydropower Dam incident Sesan river is a main tributary of the Mekong river system Sesan river is a main tributary of the Mekong river system Ialy is a key hydropower project in the cascade Viet Nam planned to build in the sub-basin, 70 km from border with Cambodia Ialy is a key hydropower project in the cascade Viet Nam planned to build in the sub-basin, 70 km from border with Cambodia Feb/2000 a careless release from Ialy dam caused serious lost and damages to Cambodian people downstream Feb/2000 a careless release from Ialy dam caused serious lost and damages to Cambodian people downstream The regional cooepration has come to its first alert and real challenge The regional cooepration has come to its first alert and real challenge The response was quick in bilateral channel of all levels, with assistance from MRCS The response was quick in bilateral channel of all levels, with assistance from MRCS Mitigation measures were taken Mitigation measures were taken Immediate measures relating to the dam operation were agreed Immediate measures relating to the dam operation were agreed

International Workshop on Institutional Capacity Development in Transboundary Basins November 2008, Bonn, Germany Institutional Arrangements Appropriate dam operation and flow regulation on the Sesan river; Appropriate dam operation and flow regulation on the Sesan river; Maintenance of an effective notification mechanism on the flow regulation Maintenance of an effective notification mechanism on the flow regulation Jointly conduction required transboundary environment impact assessment studies; Jointly conduction required transboundary environment impact assessment studies; Strengthening the trust and cooperation spirit between the two sides in water resources management of the sub-basin Strengthening the trust and cooperation spirit between the two sides in water resources management of the sub-basin Notifications of new projects in the Central Highlands to the MRC Notifications of new projects in the Central Highlands to the MRC Exchange of related EIA studies of those projects Exchange of related EIA studies of those projects Maintenance of all level of contacts of bilateral channel Maintenance of all level of contacts of bilateral channel Prime Minister’s Instruction on transboundary impact concerns Prime Minister’s Instruction on transboundary impact concerns Re-regulatory reservoir downstream Ialy and suggesting joint ventures for hydropower development on Cambodia side Re-regulatory reservoir downstream Ialy and suggesting joint ventures for hydropower development on Cambodia side Target of increase awareness, trust and cooperation spirit between the two sides in water resources management of the sub-basin Target of increase awareness, trust and cooperation spirit between the two sides in water resources management of the sub-basin

International Workshop on Institutional Capacity Development in Transboundary Basins November 2008, Bonn, Germany Needed Capacities MRC (complete set of rules/procedures/techncial guideleines relating to transboundary impacts) MRC (complete set of rules/procedures/techncial guideleines relating to transboundary impacts) Regional sub-committee for transboundary impacts assessment Regional sub-committee for transboundary impacts assessment Adequate and timely information to Joint Commission and annual border cooperation meetings at Government level Adequate and timely information to Joint Commission and annual border cooperation meetings at Government level Frequent meetings at working level (Joing Working Group on Sesan Flow Regulation) Frequent meetings at working level (Joing Working Group on Sesan Flow Regulation) Ad-hoc joint team, group (investagation, modeling etc…) and workshops, consultations, meetings etc… Ad-hoc joint team, group (investagation, modeling etc…) and workshops, consultations, meetings etc… Techncial cooepration: Joint monitoring, studies and shared database/analytical tools Techncial cooepration: Joint monitoring, studies and shared database/analytical tools Awareness increase efforts, dissemination to the root level Awareness increase efforts, dissemination to the root level

International Workshop on Institutional Capacity Development in Transboundary Basins November 2008, Bonn, Germany Lessons Learnt Awareness and trust for border people and local authorities Awareness and trust for border people and local authorities Awareness and commitment of involved line agencies Awareness and commitment of involved line agencies Combination of regional mechanism and bilateral channels with proper public involvement Combination of regional mechanism and bilateral channels with proper public involvement Commitments and cooperation spirit affirmed at top level Commitments and cooperation spirit affirmed at top level Improved monitoring and analytical tools Improved monitoring and analytical tools Data and information sharing and exchange, and notification requirements Data and information sharing and exchange, and notification requirements Mitigation plan Mitigation plan Sub-basin water resources management planning according to IWRM principles Sub-basin water resources management planning according to IWRM principles Joint investment for mutual benefit Joint investment for mutual benefit …

International Workshop on Institutional Capacity Development in Transboundary Basins November 2008, Bonn, Germany ApplicabilityApplicability Basin-wide set-up (rules/procedures) Basin-wide set-up (rules/procedures) Bilateral channel (Guidelines and relevant agreements) Bilateral channel (Guidelines and relevant agreements) Regulation for system operation Regulation for system operation Techncial support (monitoring and tools) Techncial support (monitoring and tools) Capacity (technical and legal) Capacity (technical and legal) Awareness increase and trust building Awareness increase and trust building

10