Experimental Permits for Reusable Suborbital Rockets Guidelines Randy Repcheck May 25, 2005 Federal Aviation Administration.

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
Presented to: By: Date: Federal Aviation Administration Safety Management System (SMS) at Airports : Principles APEC TPT-WG AEG-SAF Jim White, Deputy Director.
Gregory S. Winton, Esq. The Aviation Law Firm
RLV Working Group Presentation to the COMSTAC Michael S. Kelly 26 May 2005.
Ron DeJuliis, Commissioner of Labor and Industry Rob McGeeney, Program Manager Larry Kreseski, Chief inspector Department of Labor, Licensing, and Regulation.
Federal Aviation Administration On-Orbit Debris Mitigation Methods for Upper Stages COMSTAC: Space Transportation Operations Working Group and Risk Management.
Functional Check Flights Presented by Wally Istchenko Chief Flight Test Transport Canada Functional Check Flight Symposium February 8-9, 2011 Vancouver,
Federal Aviation Administration Commercial Space Transportation Human Space Flight Occupant Safety Telecon Telecon 7 – Medical Guidance for Crew & Spaceflight.
Contractor Management and ISO 14001:2004
Georgia Airports Association Spring Workshop February 25, 2015 Georgia Department of Transportation FAA Policy and Procedures Concerning the Use of Airport.
Presented to: HAI FIRC By: Hooper Harris, Manager, AFS-250 Date:February 2006 Federal Aviation Administration Operational Control Operations Specification.
1 Successful Compliance Reviews for Industry - First-hand perspective from a Safety Investigator Keith Kerns Member of CVSA International Safety Team Safety.
Outline Overview of AST Statutory Authority Regulations
Federal Aviation Regulations
OH&S Management System
By: P. Brinkman, Senior Technical Advisor, FAA Date: August 15, 2011 Federal Aviation Administration Federal Aviation Administration Federal Aviation Administration.
13. Airworthiness of Aircraft-1 Certificate of Type Approval Certificate of Type Approval A Certificate of Type Approval approves the basic design and.
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
Effects of Minimal Regulations on Commercial Human Spaceflight and Public Risk Acceptance Results of Nov 2011 Public Opinion Poll Presented to COMSTAC.
■ This Training Module is designed to educate Management on FMCSA Compliance Review (CR).
Ship Recycling Facility Management System IMO Guideline A.962
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Presented to: 2012 Pacific Aviation Director’s Workshop, Guam By: Juan S.A. Reyes, A.C.E., ACSI Date: March 13-15, 2012 Federal Aviation Administration.
Presented to: By: Date: Federal Aviation Administration Office of Commercial Space Transportation Orbital Debris 10 June, 2015 Symposium for the Small.
Fatigue Management Rule Russell Smith Nuclear Energy Institute (NEI)
Federal Aviation Administration Advisory Circular 150/5370-2F Operational Safety on Airports During Construction Presented to: Eastern Region 35 th Annual.
Michelle Groy Johnson Quality Improvement Officer Research Integrity Office Tough Love: Understanding the Purpose and Processes of Quality Assurance.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Federal Aviation Administration By: Sherman Council Date: 15 August 2011 Office of Commercial Space Transportation Experimental Permit Program.
University of Miami Office of Research Compliance Assessment Lynn E. Smith, JD, CIM, CIP Johanna Stamates, RN, BA, CCRC With assistance from Elizabeth.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Federal Aviation Administration Commercial Space Transportation Human Space Flight Occupant Safety Telecon Telecon 5 – Aborts and Abort Systems. December.
1 ADVANCED SPACEPORT TECHNOLOGY WORKING GROUP May 15, 2001 Stewart W. Jackson Commercial Space Transportation Federal Aviation Administration FAA/AST LICENSING.
Hazards Identification and Risk Assessment
SVDM ConOps 18 May 2010 Federal Aviation Administration 0 0 Space Vehicle Debris Threat Management ConOps Presentation to COMSTAC Space Transportation.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Industry Comments to Commercial Space Transportation Reusable Launch Vehicle Operations & Maintenance Guidelines Presented to the COMSTAC RLV Working Group.
Federal Aviation Administration Commercial Space Transportation Human Space Flight Occupant Safety Telecon Telecon #3 – Types of Requirements and Guidance.
Presented to: By: Date: Federal Aviation Administration Noise 101: Federal Noise Laws and Regulations Town of Payson M.L. Chittick, Scottsdale FSDO January.
Unmanned Aircraft Systems. What is a UAS? What is a DRONE?
Streamlining NEPA for Reusable Launch Vehicles Federal Aviation Administration Associate Administrator for Commercial Space Transportation October 2004.
Federal Aviation Administration 1 FAA AST Overview Presentation Federal Aviation Administration Overview of the Federal Aviation Administration.
SPACE Act of 2015 Dr. Sarah J. Nilsson, Esq. A 3 ir Conference January 2016.
1 Permit Implementation Regulations Defines the phrase “significant change in the design or operation of a solid waste facility that is not authorized.
FAA sUAS ARC Support Documentation © ASTM International. All Rights Reserved. The Unmanned Aircraft System Initiative F38 on Unmanned Aircraft Systems.
Reusable Launch Vehicle Working Group Commercial Space Transportation Advisory Committee Presented to COMSTAC Meeting George Whitesides, RLVWG Chairman.
Presented to: By: Date: Federal Aviation Administration Office of Commercial Space Transportation Human Spaceflight Guidelines Update COMSTAC, Systems.
Guide to the Identification of Safety-Critical Hardware Items for RLV Developers COMSTAC RLV Working Group Meeting Washington D.C. 25 May 2005.
Federal Aviation Administration Federal Aviation Administration The Regulatory Role of the Federal Aviation Administration in Space Transportation With.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Oil Spill Response Plans A History Lesson PHMSA Review and Approval.
Federal Aviation Administration 1 FAA AST Presentation at ESIL-1 October 26, 2011 List of Recent Papers 2011 Overview of the FAA Center of Excellence for.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
Flight Review By Mark Roberson. The Flight Review is required by Federal Aviation Regulations for all pilots who intend to act as pilot in command of.
UAS Operations in the Golden Triangle Mike Hainsey Executive Director Golden Triangle Regional Airport.
OHSAS Occupational health and safety management system.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
1 The WTO Agreement on Technical Barriers to Trade Basic Concepts and Member Obligations.
SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule.
OH&S Management System
Commercial Space Transportation
OH&S Management System
AIRLINE TRANSPORTATION AERO 4100 / 5100
RST processes Session 5 Presentation 2.
Oleh : Ir. Sjaifuddin Thahir, MSc.
TRTR Briefing September 2013
System Safety Regulation
CR-GR-HSE-302 Management of change
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Experimental Permits for Reusable Suborbital Rockets Guidelines Randy Repcheck May 25, 2005 Federal Aviation Administration

Federal Aviation Administration 2 Experimental Permit Guidelines May 20, Outline The Commercial Space Launch Amendments Act of 2004 AST’s Approach to Developing the Guidelines Experimental Permit Basics How to Obtain an Experimental Permit Post-Permit Operations

Federal Aviation Administration 3 Experimental Permit Guidelines May 20, The Commercial Space Launch Amendments Act of 2004 On December 23, 2004, President Bush signed into law the CSLAA, which: –Promotes development of emerging human space flight industry, and –Makes FAA responsible for regulating private human space flight. Among other things, the CSLAA establishes an experimental permit regime for reusable suborbital rockets flown for: –Research and development. –Showing compliance with requirements for a license. –Crew training prior to obtaining a license.

Federal Aviation Administration 4 Experimental Permit Guidelines May 20, The Commercial Space Launch Amendments Act of 2004 (cont.) Experimental permit differs from a license as follows: –120 day determination. –No comp or hire. –No indemnification. –Not transferable. –Should authorize an unlimited number of launches and reentries. Legislative history indicates that an experimental permit –Should be easier to obtain than a license, and –To the extent practical, should be modeled after an Experimental Airworthiness Certificate.

Federal Aviation Administration 5 Experimental Permit Guidelines May 20, The Commercial Space Launch Amendments Act of 2004 (cont.) Within 12 months after the date of enactment of the CSLAA, the Secretary shall publish proposed regulations. Within 18 months after the date of enactment of the CSLAA, the Secretary shall issue final regulations. As soon as practicable after the date of enactment of the CSLAA, the Secretary is to issue guidelines or advisory circulars to guide the implementation of the CSLAA until regulations are issued.

Federal Aviation Administration 6 Experimental Permit Guidelines May 20, AST’s Approach to Developing the Guidelines Current AST licensing uses a three-prong public safety strategy for licensing: –System safety process. An operator should use a logical, disciplined approach to identifying hazards and mitigating and eliminating risks. –Quantitative risk analysis. Analyses that quantify the residual risk to the public through a calculation of individual and collective risk. Risks limited to set criteria. –Operating requirements. AST streamlined each prong recognizing the unique needs of experimental flight test.

Federal Aviation Administration 7 Experimental Permit Guidelines May 20, Experimental Permit Basics Scope: –Hazardous pre-flight operations, –Flight, and –Post-flight safing. One permit can authorize multiple vehicles of a particular design. The FAA will identify the type of design changes that may be made without invalidating the permit. Duration - one year. Renewable.

Federal Aviation Administration 8 Experimental Permit Guidelines May 20, How to Obtain an Experimental Permit To obtain an experimental permit, an applicant should provide the following: –Program description. –Flight test plan. –Operational safety documentation. Should also provide information for FAA to comply with NEPA. If flight crew or space flight participant will be on board, should show compliance with crew and space flight participant guidelines. Should make vehicle available for inspection prior to permit issuance.

Federal Aviation Administration 9 Experimental Permit Guidelines May 20, Program Description Describe the purpose for which the reusable suborbital rocket is to be used. Provide dimensioned three-view drawings or photographs. Provide gross lift-off weight and thrust profile. Provide a general description of all systems. Describe each payload or payload class planned to be flown. Describe any foreign ownership.

Federal Aviation Administration 10 Experimental Permit Guidelines May 20, Flight Test Plan Flight Tests An experimental permit applicant should describe the flight test program, including: –Estimated number of flights. –Key flight safety events (events that have an increased likelihood of causing failure compared to other portions of flight, such as ignition, staging, envelope expansion, and reentry). –Maximum altitude.

Federal Aviation Administration 11 Experimental Permit Guidelines May 20, Flight Test Plan Operating Area An applicant should identify and describe one or more operating areas where it plans to perform its flights. An operating area is acceptable to the FAA if: –No densely populated areas are present in or adjacent to the operating area. –The operating area contains the planned trajectories, accounting for expected dispersions. –The operating area contains enough sparsely populated or unpopulated area to perform key flight-safety events. –The operating area does not contain significant automobile, railway, waterborne vessel traffic, or large concentrations of the public.

Federal Aviation Administration 12 Experimental Permit Guidelines May 20, Flight Test Plan Operating Area (cont’d) Operating areas are subject to FAA approval. FAA may prohibit certain areas from being within an operating area, or classify certain areas as exclusion areas (areas where the vehicle cannot fly), if necessary.

Federal Aviation Administration 13 Experimental Permit Guidelines May 20, Operational Safety Documentation Hazard Analysis An applicant should perform an analysis that identifies and characterizes the hazards and assesses the risks to the public, as follows: 1.Identify and describe hazards. 2.Determine the qualitative risk (severity and likelihood) and risk acceptability for each hazard using FAA-defined criteria. 3.Identify and describe risk elimination and mitigation measures for each hazard. 4.Provide validation and verification evidence for risk elimination and mitigation measures.

Federal Aviation Administration 14 Experimental Permit Guidelines May 20, Operational Safety Documentation Operating Area Containment An applicant should identify methods or systems used to contain its vehicle’s Instantaneous Impact Point (IIP) within the operating area and outside any exclusion area. This description should include: –Proof of physical limitations on the ability of the vehicle to leave the operating area, or –Abort procedures and safety measures resulting from a system safety process, for example: Dedicated flight safety system. Real time IIP display with abort criteria.

Federal Aviation Administration 15 Experimental Permit Guidelines May 20, Operational Safety Documentation Key Flight-Safety Events An applicant should identify methods or systems used to conduct key flight-safety events over sparsely populated areas. Key flight safety events include: –Ignition of the primary rocket engines. –Any staging event. –Any envelope expansion portion of flight. –Need verification evidence such as: –Test data, –Demonstration data, –Analysis approach and results, and/or –Inspection results.

Federal Aviation Administration 16 Experimental Permit Guidelines May 20, Operational Safety Documentation Agreements A permittee should complete the following agreements, if applicable: –FAA Air Traffic Control – Operating area, Notices to Airmen, airspace closure, and other measures. –U.S. Coast Guard – Notices to Mariners and other measures. –Launch site, federal or commercial. –Any other parties that are necessary to support a permitted flight.

Federal Aviation Administration 17 Experimental Permit Guidelines May 20, Post-Permit Operations Once a permit is issued, a permittee should follow a number of public safety measures: –Pre-flight and Post-flight Operations –Hazard Analysis –Operating Area Containment –Key Flight-Safety Events Limitations –Landing and Impact Locations –Conjunction on Launch Assessment –Flight Rules –Tracking and Communications –Anomaly Reporting –Mishap Reporting, Responding, Investigation –Crew Rest

Federal Aviation Administration 18 Experimental Permit Guidelines May 20, Post-Permit Operations Pre-flight and Post-flight Operations A permittee should establish a safety clear zone that will contain the adverse effects of each operation involving a hazard. A permittee should verify that the public is outside of a safety clear zone before and during a hazardous operation.

Federal Aviation Administration 19 Experimental Permit Guidelines May 20, Post-Permit Operations Hazard Analysis A permittee should assure conformance with the risk elimination and mitigation measures derived from its hazard analysis. A permittee should ensure the continued validity of its hazard analysis, including updating the hazards and risks as experience is gained.

Federal Aviation Administration 20 Experimental Permit Guidelines May 20, Post-Permit Operations Operating Area Containment A permittee should stay within the operating area and outside any exclusion areas.

Federal Aviation Administration 21 Experimental Permit Guidelines May 20, Post-Permit Operations Key Flight-Safety Events Limitations A permittee should conduct any key flight-safety event so that the reusable suborbital rocket’s instantaneous impact point, accounting for expected dispersions, is over a sparsely populated or unpopulated area. A permittee should conduct each reusable suborbital rocket flight so that the reentry impact point does not loiter over a populated area.

Federal Aviation Administration 22 Experimental Permit Guidelines May 20, Post-Permit Operations Landing and Impact Locations A permittee should use a location for nominal landing, any contingency abort landing, or any reusable suborbital rocket component impact or landing that: –Can be reached by the reusable suborbital rocket or component, –Is of sufficient size to contain impacts, including debris dispersion upon impact, and –At the time of landing or impact, does not contain any members of the public.

Federal Aviation Administration 23 Experimental Permit Guidelines May 20, Post-Permit Operations Collision Avoidance Analysis For a permitted flight reaching an altitude greater than 150 kilometers, a permittee should obtain a collision avoidance analysis from United States Strategic Command. The collision avoidance analysis may establish periods of time during which a permittee should not initiate flight, in order to ensure that a permitted vehicle or any stages do not pass close to a habitable orbital object.

Federal Aviation Administration 24 Experimental Permit Guidelines May 20, Post-Permit Operations Tracking and Communications A permittee should: –Enable Air Traffic Control (ATC) to know the real-time position and velocity while the rocket is operating in the National Airspace System. –Provide position and velocity data for post-flight use. –Be in communication with ATC during all phases of flight. –Record communications affecting the safety of the flight.

Federal Aviation Administration 25 Experimental Permit Guidelines May 20, Post-Permit Operations Flight Rules A permittee should implement flight rules prior to initiating flight and during nominal and non-nominal flight to: –Contain IIP within the operating area and outside exclusion areas. –Contain key flight-safety events over sparsely populated areas. –Comply with any agreement. –Comply with any COLA closures. –Comply with tracking and communications needs. –Other measures derived from its hazard analysis.

Federal Aviation Administration 26 Experimental Permit Guidelines May 20, Post-Permit Operations Flight Rules (cont.) A permittee should abort the flight if the vehicle is in a state such that the continued operation of the vehicle would endanger the public. A permittee should not operate a vehicle in a careless or reckless manner so as to endanger members of the public. FAA may incorporate portions of part 91 for airplane-like portions of flight.

Federal Aviation Administration 27 Experimental Permit Guidelines May 20, Post-Permit Operations Anomaly Reporting A permittee should record anomalies and implement corrective actions for those anomalies. A permittee should report to the FAA any anomaly of systems necessary for IIP containment, systems for preventing key flight- safety events over populated areas, or those systems designed to mitigate risk as defined in the hazard analysis process.

Federal Aviation Administration 28 Experimental Permit Guidelines May 20, Post-Permit Operations Mishap Reporting, Responding, Investigating A permittee should report, respond to, and investigate mishaps. –Notify FAA immediately if accident or incident, and submit a preliminary report within 5 days of the event. –Contain and minimize consequences, preserve evidence, and cooperate with FAA and NTSB investigators. –Investigate the cause and report results to FAA.

Federal Aviation Administration 29 Experimental Permit Guidelines May 20, Post-Permit Operations Crew Rest A permittee should ensure that vehicle safety operations personnel adhere to the following work and rest standards: –A maximum 12-hour work shift with at least 8 hours of rest after 12 hours of work during permitted activities. –A maximum of 60 hours worked in the 7 days preceding initiation of a permitted activity. –A maximum of 14 consecutive work days. –A minimum 48-hour rest period after 5 consecutive days of 12- hour shifts.

Federal Aviation Administration 30 Experimental Permit Guidelines May 20, Questions?