MGT/437 – Project Management © Westbrook Stevens 2001 4/23/2015 How to Collect Data  After data collection has been completed,

Slides:



Advertisements
Similar presentations
Project Management.
Advertisements

Project Management Concepts
Project management Information systems for management1 Project Management.
Facilitated by Joanne Fraser RiverSystems
Monitoring and Controlling the Project
PROJECT RISK MANAGEMENT
Monitoring and Controlling the Project
Copyright 2005 John Wiley & Sons, Inc Monitoring and Controlling the Project Project Management in Practice Second Edition Mantel, Meredith, Shafer,
Project Management Shuffle Directions: take the definitions from the following cards and write a song using the tune from “Cupid Shuffle”
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Monitoring and Information Systems
Systems Analysis and Design 9th Edition
Project Cost Management Estimation Budget Cost Control
Project Management: A Managerial Approach
Introduction to Project Management Avneet Mathur
Chapter 7 Controlling - To Ensure Results
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Reaching Goals and Objectives Goal Setting The Bullfight.
LSU 10/09/2007Project Schedule1 The Project Schedule Project Management Unit #4.
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
Project Management and Scheduling
Copyright 2012 John Wiley & Sons, Inc. Chapter 11 Project Control.
What is Business Analysis Planning & Monitoring?
Reaching Goals: Plans and Controls
S/W Project Management
B0H4M CHAPTER 16.
Management 11e John Schermerhorn Chapter 18 Control Processes and Systems.
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Reaching Goals: Plans and Controls Today’s smart supervisor.
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
11-1 PROJECT CONTROL Project Control Defined Types of Control Systems Need for Balance in Control Systems Control of Creative Efforts Changes and Change.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Managing Project Through Information System.  Monitoring is collecting, recording, and reporting information concerning any and all aspects of project.
Lecture 31 Introduction to System Development Life Cycle - Part 2.
Project Administration Chapter-4. Project Administration Project Administration is the process which involves different kinds of activities of managing.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Project monitoring and Control
Project Management: A Managerial Approach
Chapter 3 Project Management Chapter 3 Project Management Organising, planning and scheduling software projects.
Project Management: A Managerial Approach
Risk Management & Corporate Governance 1. What is Risk?  Risk arises from uncertainty; but all uncertainties do not carry risk.  Possibility of an unfavorable.
 2001 Prentice Hall Business Publishing, Accounting Information Systems, 8/E, Bodnar/Hopwood Systems Implementation, Operation, and Control Chapter.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Controlling projects: The Management Process
Planning in Organizations Why supervisors and managers plan: Knowing what the organization is trying to accomplish helps them set priorities and make decisions.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
MEM 612 Project Management Chapter 7 Monitoring and Controlling the Project.
Copyright 2012 John Wiley & Sons, Inc. Chapter 10 Monitoring and Information Systems.
Copyright 2009 John Wiley & Sons, Inc. Chapter 10 Monitoring and Information Systems.
What is project management?
Ch7: Project Monitoring and Control  To reduce differences between plan and actual in the 3D space of T/C/P.  Best utilization of organization’s primary.
MGT-555 PERFORMANCE AND CAREER MANAGEMENT LECTURE NO
9-1 Irwin/McGraw-Hill ©The McGraw-Hill Companies, Inc., 2000 Organizational Control and Culture Organizational Control and Culture 9 9.
Copyright 2015 John Wiley & Sons, Inc. Chapter 10 Monitoring and Information Systems.
Copyright 2009 John Wiley & Sons, Inc. Chapter 11 Project Control.
PROJECT CONTROL Project Control Defined Types of Control Systems
CONTROLLING Welingkar’s Distance Learning Division CHAPTER-17
Monitoring and Information Systems
TechStambha PMP Certification Training
Monitoring and Information Systems
Monitoring and Information Systems
Project Management: A Managerial Approach 4/e
Chapter 11 Project Control.
Chapter 11 Project Control.
Chapter 11 Project Control.
Presentation transcript:

MGT/437 – Project Management © Westbrook Stevens /23/2015 How to Collect Data  After data collection has been completed, reports on progress should be generated. Include:  project status reports,  time/cost reports, and  variance reports  Causes and effects should be identified and trends noted  Plans, charts and tables should be updated on a timely basis Chapter 10-9

MGT/437 – Project Management © Westbrook Stevens /23/2015 Information Flow for the Planning - Monitoring - Controlling Cycle Chapter 10-4

MGT/437 – Project Management © Westbrook Stevens /23/2015 Information Needs and the Reporting Process  Must contain data relevant to the control of specific tasks  that are being carried out according to a specific schedule  The frequency of reporting should be great enough to allow control  to be exerted during or before the period in which the task is scheduled for completion  The timing of reports should generally correspond to the timing of project milestones Chapter 10-16

MGT/437 – Project Management © Westbrook Stevens /23/2015 Information Needs and the Reporting Process  The nature of the monitoring system should be consistent with the logic of the planning, budgeting, and scheduling systems  The primary objective is to ensure achievement of the project plan through control  The scheduling and resource usage columns of the project action plan will serve as the key to the design of project reports Chapter 10-17

MGT/437 – Project Management © Westbrook Stevens /23/2015 Information Needs and the Reporting Process  Benefits of detailed, timely reports delivered to the proper people:  Mutual understanding of the goals of the project  Awareness of the progress of parallel activities  More realistic planning for the needs of all groups  Understanding the relationships of individual tasks to one another and the overall project  Early warning signals of potential problems and delays  Faster management action in response to unacceptable or inappropriate work  Higher visibility to top management Chapter 10-18

MGT/437 – Project Management © Westbrook Stevens /23/2015 Report Types  For the purposes of project management, we can consider three distinct types of reports:  Routine  those issued on a regular basis  Exception  Special analysis Chapter 10-19

MGT/437 – Project Management © Westbrook Stevens /23/2015 Report Types, Exception Reports 1. Directly oriented to project management decision making  and should be distributed to the team members who will have a prime responsibility for decisions 2. Used when a decision is made on an exception basis  and it is desirable to inform other managers as well as to document the decision Chapter 10-20

MGT/437 – Project Management © Westbrook Stevens /23/2015 Report Types -- Special Analysis Reports  Used to disseminate the results of special studies conducted as a part of the project  Used in response to special problems that arise during the project  Cover matters that may be of interest to other project managers, or make use of analytic methods that might be helpful on other projects Chapter 10-21

MGT/437 – Project Management © Westbrook Stevens /23/2015 Common Reporting Problems 1. There is usually too much detail, both in the reports themselves and the input being solicited from workers 2. Poor interface between the project information system and the parent firm’s information system 3. Poor correspondence between the planning and the monitoring systems Chapter 10-24

MGT/437 – Project Management © Westbrook Stevens /23/2015 Milestone Reporting  Serve to keep all parties up to date on what has been accomplished  If accomplishments are inadequate or late, these reports serve as starting points for remedial planning Chapter 10-34

MGT/437 – Project Management © Westbrook Stevens /23/2015 Project Control  Control is the last element in the implementation cycle of planning- monitoring-controlling  Control is focused on three elements of a project  Performance  Cost  Time Chapter 11-1

MGT/437 – Project Management © Westbrook Stevens /23/2015 Controlling Performance  Unexpected technical problems arise  Insufficient resources are available when needed  Insurmountable technical difficulties are present  Quality or reliability problems occur  Client requires changes in specifications  Interfunctional complications arise  Technological breakthroughs affect the project Chapter 11-2

MGT/437 – Project Management © Westbrook Stevens /23/2015 Controlling Cost  Technical difficulties require more resources  The scope of the work increase  Initial bids were too low  Reporting was poor or untimely  Budgeting was inadequate  Corrective control was not exercised in time  Input price changes occurred Chapter 11-3

MGT/437 – Project Management © Westbrook Stevens /23/2015 Controlling Time  Technical difficulties took longer than planned to resolve  Initial time estimates were optimistic  Task sequencing was incorrect  Required inputs of material, personnel, or equipment were unavailable when needed  Necessary preceding tasks were incomplete  Customer generated change orders required rework  Governmental regulations were altered Chapter 11-4

MGT/437 – Project Management © Westbrook Stevens /23/2015 Purposes of Control  The project manager must guard the  physical assets of the organization,  its human resources, and  its financial resources Chapter 11-5

MGT/437 – Project Management © Westbrook Stevens /23/2015 Physical Asset Control  Concerned with asset maintenance, whether preventive or corrective  Preventative Maintenance  Physical inventory Chapter 11-6

MGT/437 – Project Management © Westbrook Stevens /23/2015 Three Types of Control Processes  Two basic types of control mechanisms  Go/no-go control  Post control  Cybernetic control is a third,  but less common control mechanism rarely directly applicable to projects. Chapter 11-11

MGT/437 – Project Management © Westbrook Stevens /23/2015 Go/No-go Controls  Testing to see if some specific precondition has been met  Most of the control falls into this category  Can be used on almost every aspect of a project  Operate only when and if the controller uses them Chapter 11-12

MGT/437 – Project Management © Westbrook Stevens /23/2015 Information Requirements for Go/no-go  The project proposal, plans specifications, schedules and budgets contain all the information needed to apply go/no-go controls to the project  Milestones are the key events that serve as a focus for ongoing control activity  These milestones are the project’s deliverables  In the form of in-process output or final output Chapter 11-13

MGT/437 – Project Management © Westbrook Stevens /23/2015 Postcontrol  Applied after the fact  Directed toward improving the chances for future projects to meet their goals  Applied through a relatively formal document  The project objectives  Milestones, checkpoints, and budgets  The final report on project  Recommendations for performance and process improvement Chapter 11-14

MGT/437 – Project Management © Westbrook Stevens /23/2015 Characteristics of a Control System  Should be flexible  Should be cost effective  Must be truly useful  Must satisfy the real needs of the project  Must operate in a timely manner  Sensors and monitors should be sufficiently accurate and precise to control the project  within the limits that are functional for the client and parent organization Chapter 11-15

MGT/437 – Project Management © Westbrook Stevens /23/2015 Characteristics of a Control System  Should be as simple as possible  Should be easy to maintain  Should be capable of being extended or otherwise altered  Should be fully documented when installed  the documentation should include a complete training program in system operation Chapter 11-16

MGT/437 – Project Management © Westbrook Stevens /23/2015 Control Systems  The control of performance, cost, and time usually require different input data:  Performance - engineering change notices, test results, quality checks, rework tickets, scrap rates  Cost - budgets to actual cash flows, purchase orders, absenteeism, income reports, labor hour charges, accounting variance reports  Schedule - benchmark reports, status reports, PERT/CPM networks, earned value graphs, Gantt charts, WBS, and action plans Chapter 11-17

MGT/437 – Project Management © Westbrook Stevens /23/2015 Control Tools Trend projection Chapter 11-19

MGT/437 – Project Management © Westbrook Stevens /23/2015 Critical Ratio Control Charts  Two parts:  The ratio of actual progress to scheduled progress  The ratio of budgeted cost to actual cost  Measure of the general health of the project  By combining two ratios, it weighs them equally, allowing a “bad” ratio to be offset by a “good” ratio Chapter 11-20

MGT/437 – Project Management © Westbrook Stevens /23/2015 Critical Ratio Chapter Task Number Critcal Ratio Actual Cost Budgeted Cost Scheduled Progress Actual Progress 1(2 / 3) X(6 / 4) = 1.0 2(2 / 3) X(6 / 6) =.67 3(3 / 3) X(4 / 6) =.67 4(3 / 2) X(6 / 6) = 1.5 5(3 / 3) X(6 / 4) = 1.5

MGT/437 – Project Management © Westbrook Stevens /23/2015 Critical Ratio Control Chart Chapter 11-22

MGT/437 – Project Management © Westbrook Stevens /23/2015 Benchmarking  A recent addition to the arsenal of of project control tools is benchmarking  Benchmarking makes comparisons to “best in class” practices across organizations  Some successful organizations have been benchmarked on their best practices and key success factors for projects being conducted in functional organizations Chapter 11-23

MGT/437 – Project Management © Westbrook Stevens /23/2015 Best Practices and Keys to Success  There were four major areas found to help projects in functional organizations:  Promoting the benefits of project management  Personnel pay for project management skills and high risk projects through bonuses, stock options, and other incentives  Methodology  Results of project management Chapter 11-24

MGT/437 – Project Management © Westbrook Stevens /23/2015 Control as a Function of Management  The purpose of controlling is always the same: to bring the actual schedule, budget, and deliverables of the project into reasonably close congruence with the planned schedule, budget, and deliverables  The job of the project manager is to set controls that will encourage those behaviors that are deemed desirable and discourage those that are not Chapter 11-25

MGT/437 – Project Management © Westbrook Stevens /23/2015 Cybernetic Controls  Human response to steering controls tends to be positive  Steering controls are usually viewed as helpful rather than a source of unwelcome pressure  Response to steering controls also depends on the acceptance that the goals of the control system are appropriate Chapter 11-26

MGT/437 – Project Management © Westbrook Stevens /23/2015 Go/No-go Controls  Response to go/no-go controls tends to be neutral or negative  “Barely good enough” results are just as acceptable as “perfect” results  The system makes it difficult for the worker to take pride in high quality work because the system does not recognize gradations of quality  The fact that this kind of control emphasizes “good enough” performance is no excuse for the nonchalant application of careless standards Chapter 11-27

MGT/437 – Project Management © Westbrook Stevens /23/2015 Postcontrols  Postcontrols are seen as much the same as a report card  They may serve as the basis for reward or punishment, but they are received too late to change current performance  Because postcontrols are placed on the process of conducting a project, they may be applied to such areas as: communication, cooperation, quality of project management, and the nature of interaction with the client Chapter 11-28

MGT/437 – Project Management © Westbrook Stevens /23/2015 Balance in a Control System  General features of a balanced control system:  Built with cognizance of the fact that investment in control is subject to sharply diminishing returns  Recognizes that as control increases past some point, innovative activity is more and more damped, and then finally shut off completely  Directed toward the correction of error rather than toward punishment  Exerts control only to the degree required to achieve its objectives  Utilizes the lowest degree of hassle consistent with accomplishing its goals Chapter 11-29

MGT/437 – Project Management © Westbrook Stevens /23/2015 Control of Creative Activities  The more creativity involved, the greater the degree of uncertainty surrounding outcomes  Too much control tends to inhibit creativity  Control is not necessarily the enemy of creativity, nor does creative activity imply complete uncertainty of  There are three general approaches to control creative projects:  Progress review  Personnel reassignment  Control of input resources Chapter 11-30

MGT/437 – Project Management © Westbrook Stevens /23/2015 Progress Review  The progress review focuses on the process of reaching outcomes rather than on the outcomes per se  The process is controllable even if the precise results are not  Control should be instituted at each project milestone  The object of control is to ensure that the research design is sound and is being carried out as planned or amended Chapter 11-31

MGT/437 – Project Management © Westbrook Stevens /23/2015 Personnel Reassignment  This type of control is straightforward - individuals who are productive are kept  Those who are not, are moved to other jobs or to other organizations  While it is not difficult to identify those who fall in the top and bottom quartiles, it is usually quite hard to make clear distinctions between the people in the middle quartiles Chapter 11-32