BLM Bureau of Land Management Oil and Gas Permitting Process Expediting Oil and Gas Development in Western States Kent Hoffman.

Slides:



Advertisements
Similar presentations
© Chevron 2005 Chevron Piceance Basin Natural Gas Development Program Northwest Colorado Oil & Gas Forum Presented by: Michael DeBerry June 5, 2008.
Advertisements

Onshore Oil & Gas Order #1 BLM/Forest Service Final Rule.
1 | US DOE Geothermal Programeere.energy.gov Public Service of Colorado Ponnequin Wind Farm Geothermal Technologies Program Categorical Exclusions Doug.
Oil and Gas for Managers ( ) Pete Culp Assistant Director Minerals, Realty & Resource Protection May 1999.
Hazard Mitigation Assistance and the Mineral Rights Policy Gene Gruber FEMA Region III Director, Mitigation Division.
BLM - Utah Oil & Gas Program Overview BLM - Utah Oil & Gas Program Overview Utah Petroleum Association January 2014.
Funding Federal Agencies: Interdepartmental Abandoned Mine Land Watershed Initiative Funds (Clean Water Action Plan) State: Surface Mining Control and.
Cottonwood Wash Abandoned Mine Reclamation Project: A Partnership in Watershed Reclamation.
BLM New Mexico Texas Oklahoma Kansas Master Development Plan Carlsbad Field Office Natural Resource Specialist Team September 23, 2014.
General Information Name: GRR Test Geothermal Area County: AnyCounty, NV Technology: Geothermal Federal Funding: Yes (Exploration) Project Status Current.
1 The National Environmental Policy Act in the Oil & Gas Industry.
Oil and Gas Leasing Jim Albano – Lead Natural Resource Specialist Reservoir Management and Operations Section Montana State Office – (406)
Geothermal - Utah Program - General Program - General Areas of Geothermal Potential – Prospectively Valuable and Known Geothermal Resource Areas (KGRA)
LNG USA 2005 IQPC Houston, Texas November 9, 2005 Bruce F. Kiely Baker Botts L.L.P. Washington, D.C.
Geospatial Overview Goals Goals What is a Geospatial Database? What is a Geospatial Database? Onshore Order No. 1 Geospatial Requirements Onshore Order.
National Geothermal Policy and Regulation R. Gordon Bloomquist, Ph.D. Washington State University Energy Program Salt Lake City, Utah 20 January 2004.
IRWA 2013 Federal Agency Update Bureau of Land Management (BLM) U.S. Forest Service (USFS) Energy Corridors & Rapid Response Team.
1 Public Lands Advocacy HOW TO REVIEW A FEDERAL PLANNING DOCUMENT.
Oil & Natural Gas Development in the West: Thoughts on Improving the Process 2014 Utah Governor’s Energy Summit Ursula Rick, PhD June 4, 2014.
KC-002 Describe sustainability issues related to natural resource extraction and consumption. VP-009 Be willing to consider the implications of personal.
Small Scale Salvage Program Application Process. Purpose To establish an application and approval process for small scale timber salvage that is efficient,
NEPA (National Environmental Policy Act) When does it apply? How can I help? CEQA helping NEPA?
E-Commerce Overview Goals Goals What can E-Commerce do for you? What can E-Commerce do for you? Where do I find more information on E-Commerce? Where do.
Variations and Timelines in the Federal Appeals Process Robert Mathes, Bjork Lindley Little PC.
Jessi Brunson VFO BLM. Where do the Conservation Measures come from? & What do they say?
Section V. Rights-of-Way and Special Use Authorizations BLM and Forest Service.
MAURITIUS STANDARDS BUREAU
Environmental Assessment August 2012 Oil & Gas Lease Sale.
TIM CHARTERS STAFF DIRECTOR U.S. HOUSE COMMITTEE ON NATURAL RESOURCES SUBCOMMITTEE ON ENERGY AND MINERAL RESOURCES “ WHY BUILDING A SOLAR PROJECT ON FEDERAL.
DMME RAP Meeting September 24, EIA Regulation – Outline 9VAC15-20 “Guidelines for the Preparation of Environmental Impact Assessments for Oil or.
Overview of Oil & Gas Sector The following slides are not a tutorial but merely an overview of the various phases involved in an oil & gas development.
W E L C O M E to the SB 1022 Real Estate Due Diligence Training SB 1022 Real Estate Due Diligence Training.
Master Development Plans (MDPs) Oil and Gas Projects.
ETF – O IL AND G AS T RACT, M AY 5, 2015 GROUNDWATER AUTHORITY AND REQUIREMENTS.
Our mission ead and execute environmental programs and provide expertise that enables Army training, operations, acquisition and sustainable military communities.
Managing Natural Gas & Oil Resources on Federal Lands on Federal Lands Colorado Bureau of Land Management.
U. S. Department of the Interior Bureau of Land Management Division of Fluid Minerals, 1.
1 BLM Oil and Gas Overview Scott F. Archer USDI – BLM National Science & Technology Center September 13, 2007.
West Texas Legislative Summit ENVIRONMENTAL ISSUES Environmental Regulations Affecting Transportation Carlos Swonke Director, Environmental Affairs Division.
Federal Lease Overview NHAPL Half-Day Seminar February 5, 2015.
E&P STORM WATER OVERVIEW Domestic Onshore Energy E&P STORM WATER OVERVIEW Domestic Onshore Energy May 10, 2005.
Engineering 101 Oil and Gas for Managers. Petroleum Engineering Drilling Engineering Production Engineering Reservoir Engineering.
Is NEPA Preventing Energy Development? Bryan Hannegan, Ph.D. Associate Director – Energy and Transportation White House Council on Environmental Quality.
FEDERAL OFFSHORE WIND “The Role of Planning in Federal Land Management” Shapiro Conference GW Law School, Univ. of Houston, and ELI March 14, 2014 Ned.
Wyoming Pipeline Authority September Meeting, Jackson Hole Ted Murphy – Acting Field Manager – Rock Springs Field Office.
Manual Direction Cave & Karst Resources Management James Goodbar Senior Cave /Karst Specialist Bureau of Land Management May 12-16, 2014 Cody, Wyoming.
Phased Environmental Impact Assessment (EIA) Process for Oil & Gas Development in New Brunswick Department of Environment January 2011.
DEVELOPMENT OF THE HYDRAULIC FRACTURING REGULATIONS FOR NEVADA PRESENTATION TO MINING OVERSIGHT AND ACCOUNTABILITY COMMISSION ( MOAC) September 24, 2014.
U.S. Laws and Regulations Governing Gold Mining on Private and Federal Lands Prepared by National Mining Association (NMA) October, 2005.
New Mexico Uranium Exploration & Mining BLM Uranium Workshop August 12, 2008 Salt Lake City, Utah Holland Shepherd, Program Manager Mining Act Reclamation.
Office of Natural Resources Revenue U.S. Department of the Interior Industry ComplianceAccurate Revenues & DataProfessionalism & Integrity DOI Revenue.
Energy Exploration & Development On National Forest System Lands Barry Burkhardt
Date Event Global Design Effort 1 CF&S Environmental Timelines & Radiation Impacts Jerry Aarons, PG/CHG (SLAC) Rod Walton, PhD (FNAL)
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
Presented by Lane Douglas, CPL Fidelity Land, LLC.
1 Best Management Practices Planning, Leasing, Permitting Jamie Connell BLM Northwest Colorado District Manager District Manager.
Locally Administered Federal-Aid Project Initiation Workshop Prospectus Part 3 and NEPA Requirements Presenter: Howard Postovit; ODOT Region 5 Region Environmental.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Utah Abandoned Mine Reclamation Program Division of Oil, Gas & Mining Department of Natural Resources Lakeside Project.
Introduction to BMPs U.S. Department of the Interior Bureau of Land Management May 2006.
Energy Policy Act – 2005 West-Wide Energy Corridors.
WGA Consultants Keyes & Fox LLP is a law firm that specializes in the renewable energy and distributed generation sectors. K&F has in-depth experience.
Communications Site Program Bureau of Land Management (BLM) & Forest Service (FS) Robert Wilson BLM, Washington Office National Project Manager for Communication.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
STATE OF ALASKA PERMITTING PROCESS
Offshore Oil and Gas Environmental Issues
Sacramento County Stormwater Quality Program
Small Scale Salvage Program
Western Environmental & Public Lands Update
Sacramento County Stormwater Quality Program
Presentation transcript:

BLM Bureau of Land Management Oil and Gas Permitting Process Expediting Oil and Gas Development in Western States Kent Hoffman

BLM Selected Statutes Relevant to Energy Leasing and development Mineral Leasing Act Federal Onshore Oil and Gas Leasing Reform Act National Environmental Policy Act Federal Land Management and Policy Act National Forest Management Act Endangered Species Act National Historic Preservation Act Combined Hydrocarbon Leasing Act CWA, CAA, MTBA, SMCRA, etc., etc.,etc.,

BLM Well Permitting (Continued) Review and Processing of Drilling Application The Operator Submits: 1.Application Form 2.Well Plat / Map 3.Drilling Plan 4.Surface Use Plan of Operations (Including access route)

BLM Well Permitting (Continued) Review and Approval of the Operator’s APD Geology Blowout Prevention Casing Program Cementing Program Mud Program Testing & Logging Pressures and Potential Hazards Directional Design Drilling Plan Includes:

BLM Well Permitting (Continued) Review and Approval of the Operator’s APD Existing Roads New Access Roads Location of Existing Wells Location of Proposed Production Facilities Location of Water Supply Construction Materials Surface Use Plan of Operations includes:

BLM Well Permitting (Continued) Review and Approval of the Operator’s APD Waste Management Ancillary Facilities Well Site Layout Plans for Surface Reclamation Surface Ownership Surface Use Plan of Operations includes: (Continued)

BLM Well Permitting (Continued) Upon receipt of complete APD package:  Confirm Valid Lease (Rights Adjudication)  Conduct on-site inspection, cultural and T&E inventories, etc. (road, pad, pipeline, etc.)  Site specific environmental analysis conducted and documentation prepared (NEPA Compliance)  Conditions of Approval developed as site specific mitigation measures (Attached to Permit)  APD approved and drilling monitored  Production verification and compliance

Utah BLM - Applications for Permit to Drill (Federal & Indian) 8 9/30/2013

BLM  Increased Use of Electronic Processes AFMSS 2.0 e-commerce filings  Operators Familiar with Land Use Plans More complete applications Avoidance/mitigation of problem areas  Maintain “Real Time Communication” Focus work on priorities and redirect if conditions change  National Environmental Policy Act (NEPA) Need innovative solutions to shorten preparation timeframes, while still achieving compliance  Statute of Limitations (MLA & APA) 90 days vs. 6 years Some thoughts regarding improving permitting and development...

Thank You Kent Hoffman Utah Deputy State Director Lands and Minerals Division Bureau of Land Management