Drinking Water and Sanitation Department

Slides:



Advertisements
Similar presentations
Child Protection Units
Advertisements

Rudolf Frauendorfer Asian Development Bank
THE STRATEGIC APPROACH IN MODERNIZING MUNICIPAL SERVICES Siegfried Brenke, Team Leader GTZ Project: Modernization of Municipal Services Takovska 9/14,
Theme – Rural Infrastructure and Development Case study - Addressing the issue of drinking water & water pollution Team Members Parth Gupta Shruti Ohja.
Health Systems and Actors Tom Merrick, World Bank.
Leveraging Community Capacity Financing Civil Society at the Local Level World Bank-InterAction Workshop Samantha de Silva, HDNSP March 02, 2006.
MONITORING FUND MANAGEMENT SCHEME Today’s Software for tomorrow YOJNA.
1 2 3 By S Ministhy, DM Barabanki NBA & MNREGA in Barabanki ”NBA &MNREG A in Barabanki” Objectives – Increase female participation, end open defecation,
PMRDF Review Meeting Report held at SIRD, Ranchi on Participated by Mr. R.P.Singh, Director, SIRD / Nodal Officer, PMRDF Mr. Job Zachariah, Chief,
K. Ravi Kumar Dy. Commissioner Godda, Jharkhand. No. of Total Households : 2,52,756 Registered HHs under MGNREGA : 1,79,015 SC -: 11,243 ST -: 38,713.
NIRMAL BHARAT ABHIYAN madhya pradesh
JAL NIRMAL PROJECT Karnataka Rural Water Supply & Sanitation Agency
Sustaining Secure Water for Rural communities- Prospects for Future ? Rajindra de S Ariyabandu Sri Lanka
NRHM DISTRICT ACTION PLANS PARTICIPATORY & EVIDENCE BASED PLANNING PROCESS.
Workshop on Swachha Andhra Mission 2 nd May 2015 Swachha Andhra Corporaion 1.
Proposed APDRP during 11 th Plan  Continue APDRP during the XI Plan with the revised terms and conditions as a Central Sector Scheme.  The focus of.
SUB COMMITTEE ON DISTRICT PLANNING PROCESS. 2  The DPCs are weak bodies with little professional support to guide & monitor planning process except in.
Project on Convergence MGNREGS – NRLM and CFT Strategies
Funding for a brighter tomorrow 1 POWER SECTOR CONCLAVE 14th – July Avkash Saxena General Manager (APDRP) Power Finance Corporation Ltd. Restructured.
PRESENTATION ON MIS PHED ASSAM Presented by -- NIC, Assam State Centre,
C ONSULTATION ON S USTAINABLE S ANITATION 9 th September 2009 Bangalore.
Department of Drinking Water and Sanitation, Ministry of Rural Development, GoI Total Sanitation Campaign(TSC) Workshop on Strengthening Local Self Governance.
Capacity Building Capacity building for financial Management Integral part for effective and efficient functioning of Financial Management Unit. Needs.
Role of PDs/CEOs in rural sanitation – an overview By J.S.MATHUR JOINT SECRETARY Department of Drinking Water & Sanitation Ministry of Rural Development.
SCALING UP RURAL SANITATION PROGRAMME IN INDIA WITH QUALITY AND CONVERGENCE NATIONAL SEMINAR ON DECENTRALIZED GOVERNANCE IN WATER AND SANITATION 28 TH.
Training on JNNURM Urban Development Deptt., GoWB Reforms under JNNURM.
PRESENTATION ON THE CONVERGANCE OF NBA WITH MGNREGA IN DAVANAGERE DISTRICT OF KARNATAKA DAVANAGERE 12 TH SEPTEMBER, 2013.
West Bengal IWMP Annual Action Plan
Water and Sanitation District : Kanker. Water and Sanitation Water & sanitation have a direct effects on the health & thus in quality of life.
GOVERNMENT OF JHARKHAND, DRINKING WATER & SANITATION DEPARTMENT GOVERNMENT OF JHARKHAND, DRINKING WATER & SANITATION DEPARTMENT DEPARTMENTATAGLANCEDEPARTMENTATAGLANCE.
GRAM VIKAS- AN OVERVIEW. LOCATION OF WORK 19 districts 38,397 families 542 habitations 200,000 people.
Roles & Functions of the three levels of Rural Local Government in WATSAN Programme Arvind kumar REGIONAL WATSAN COORDINATOR B-TAST ( DFID- SWASTH)
Pakistan Conference on Sanitation May 2009 Status of sanitation in Northern Areas By Northern Areas LG&RDD.
Drinking water Issues, Challenges, Initiatives and the Way Forward VENUE - HALL NUMBER -5 VIGYAN BHAWAN, NEW DELHI GROUP 5.
Sahiyya Movement – An empowering Process January 21, 2006 Ministry of Health, Family Welfare, Medical Education and Research Government of Jharkhand.
DECENTRALIZED OPERATION AND MAINTENANCE THROUGH PPP CENTRES - CHARITY WATER.
National Conference on “Water and Sanitation for All in Madhya Pradesh: Opportunities and Challenges” Bhopal, Madhya Pradesh 23rd September, 2010 At :
Mid Day Meal Scheme PAB-MDM Meeting – Manipur Ministry of HRD Government of India.
11 th Meeting of General Council (GC) of National Food Security Mission (NFSM) 26 th August, 2015 Presentation by: Ajay Kumar Singh State Mission Director.
WELCOME SOUTH TRIPURA. TARGETS BPL APL SCHOOLS AW/BC Approved 1,05, Survey 1,00,858 43,
Mid Day Meal Scheme PAB-MDM Meeting-National Informatics Centre (NIC) 2 nd May, 2014 Ministry of HRD, Govt. of India.
Mid Day Meal Scheme AWP&B Arunachal Pradesh.
ASHA Sahyogini intervention in Rajasthan by Vaidehi Agnihotri
Group No. IV Total Sanitation Campaign – A way forward.
Planning process Participation of community in the process
(FODESA) 1999 – 2009 SAHELIAN AREAS DEVELOPMENT FUND.
CONVERGENCE PROCESS PRESNTATION BY: 445, Phase III, Udyog Vihar, Gurgaon.
Consultation on sustainable sanitation 9 th September 2009 Bangalore Water and Sanitation Program – South Asia (WSP-SA) New Delhi, India
Indira Awaas Yojana Ministry of Rural Development, Government of India.
NRLM (Rolled Out in 2011)– CONTEXT  NRLM works towards improving Livelihoods of about 50% of the rural Households who are poor and deprived through Organizing.
WELCOME. SANITATION CAMPAIGN IN SOUTH TRIPURA TARGETS BPL APL SCHOOLS AW/BC Approved 1,05, Survey During this year all schools.
BACKWARD REGIONS GRANT CAPACITY BUILDING PLAN PANCHAYATI RAJ DEPARTMENT GOVERNMENT OF ODISHA PANCHAYATI RAJ DEPARTMENT GOVERNMENT OF ODISHA.
Presentation Format MGNREGA PMGSY Rural Housing : IAY BRGF Integrated Action Plan.
Key Achievements of IPPE - I Participatory Planning completed in about 93,500 GPs About 250,000 block planning team members trained from among youth from.
AN OPPORTUNITY TO COLLABORATE WITH GOVERNMENT 20 AUGUST 2015 Background on GR inviting Third party inspection in NRDWP.
Bill Requirement for Technical Assistance (4)(a)(B) – “The task force shall research and recommend to the Oregon Education Investment Board the types and.
ActionSoft Tool for Scheme Implementation & Monitoring.
World Bank Assisted. Government of Karnataka has set up Karnataka Rural Water Supply & Sanitation Agency (KRWS&SA) at State & District Support Unit at.
PAS Project, CEPT University, Ahmedabad
Dining Hall in Tripura Mid Day Meal Scheme MDM-PAB Meeting –Andaman & Nicobar Islands On Ministry of HRD Government of India.
STATE - PUNJAB TWO DAYS CONFERENCE OF CEOs OF SLNA TO REVIEW IMPLEMENTATION OF WDC-PMKSY (ERSTWHILE IWMP) (18-19 th February, 2016 ) For internal circulation.
District Profile Coastal district comprising three blocks Varied topography ranging from coastal, plain and hilly regions Educational hub Economic activities.
National Rural Drinking Water Programme
MDM-PAB Meeting- Jharkhand
Drinking Water and Sanitation Initiative in Coastal villages of Gujarat June 24, 2011.
Bangladesh access to sanitation
CBO Coordinated Livelihood Development in Sagar Block
MDM-PAB Meeting- Jharkhand
A Flagship program of Ministry of Human Resource Development
NEW INDIA 2022 INDIA 75 Department of Rural Development.
Presentation transcript:

Drinking Water and Sanitation Department Government of Jharkhand Drinking Water and Sanitation Department Perspective, Program Highlight, Innovations and Achievement (2013-14) (Up to December, 2013)

Jharkhand: A State that demands Special attention The new state in the Eastern corner of India: Created in the year 2000. Panchayet Election in 2011: After a gap of 32 years More than 53% of households and 75% of the districts influence by LWE Aided with good forest cover and rainfall Undulating topography and hard rock terrain Limited Availability of surface water Rural Pipe Water Supply and Sanitation coverage : Around 7% and 43 % respectively Sustainable Water and Sanitation solution : How do we achieve it??

Mission, Objective and Strategic Approach Mission 2017: 12th Five Year Plan Period 45% coverage through Rural Pipe Water Supply 80% Coverage through Sustainable Sanitation facilities Strategy: Devolution of Power to Panchayet Institutional Reform and Restructuring Technical Backstopping Stakeholder Engagement Process Innovations encouraging last person participation Innovate , INNOVATE and INNOVATE

Devolution of Power to Panchayet : Greater Accountability Institution Fund Function Functionary Common to All Tiers Administrative Sanction of Schemes   Recommendation of Disciplinary Action Gram Panchayat less than Financial outlay of Rs.10 Lakh Planning Single Village Scheme Casual Leave and Administrative control of Plumber, Pump Operator, Hand Pump Mechanic Site Selection and Program Implementation for DT, PWS, Sanitation, Water Shed and Check Dam Collecting Fees for Water Utilization and WASH Pollution Panchayat Samiti Administrative Sanction of Schemes with Financial outlay of Rs.10 Lakh to 25 Lakh Planning of Multi Panchayet Schemes in the Same block and Monitoring of scheme Implementation Casual Leave and Administrative control of Junior Engineer and Assistant Engineer Zila Parishad Administrative Sanction of Schemes with Financial outlay above Rs.25 Lakh to 50 Lakh Planning of Multi Block Schemes in the Same District and Monitoring of Scheme Implemntation Casual Leave and Administrative control of Executive Engineer

Institutional Reform and Restructuring: Trained and Qualified HR to enhance outreach Placement of Institutional Structure Up to the Last Mile Formation of Women led Village Water and Sanitation Committees: 27957 VWSC are in Place 25882 VWSC have Savings account Civil Society Organizations as Block Resource Centre: Intensive Social Mobilization through16 organizations and 680 trained Human Resource Covers 259 Blocks and 4562 Panchayets District Project Management Unit: Professional support to BRC and DWSM through 70 professionals State Project Management Unit: Engagement of 9 Subject matter Experts Domains Covered: S&H, Legal & PRI, Hydro Geology, IEC, GIS, HRD, IT, Capacity Building, M&E and CLTS Process of cabinet approval for central schemes is withdrawn Amount is transferred to VWSC directly from District Mission Office.

Technical Backstopping: Matching E-Governance and IT initiative to address WASH issues by expert HR Development of Dedicated Website daa.Jharkhand.gov.in Establishment of call center: Direct interaction with PRI representatives SMS and Web Based Grievance Registration : Addressed 1000 grievance with 80% of issues solved on time Fund transfer through Core banking Solution activated Real Time Monitoring System (RTMS): 212 GPS (Motorola MC 65) aided with micro-computing facilities Dedicated scheme devised for Baseline Generation Facility of participatory monitoring and verification Dedicated Geographic Information System State Cell: Regular use of HGM Map in Water Source identification Cartographic and Spatial Database Unit in place Decentralized Architecture for MIS & GIS being developed

Stakeholder Engagement: Enhancing Capacity, Scope and Program Out Reach Annual audit of VWSC accounts by independent Auditors 10562 trained accountants working with VWSC and Gram Panchyats Concurrent Evaluation by qualified agencies of highest repute IIM Ranchi National Institute of Financial Management Thematic and Geographic involvement of Agencies of National and International credibility for capacity Building and Program implementation WSP-SA in 4 Districts CLTS Task Force in 4 Districts GSF- NRMC in 4 Districts Water Aid in 4 Districts UNICEF in 2 Districts PRADAN and BASIX in Participatory Water supply schemes KRG Rain Water Foundation, Space Geo tech in Drinking Water Sustainability

NATIONAL RURAL DRINKING WATER PROGRAM Flow of Presentation Program Update and over View Process Innovation & New Development PPP Model for Rural PWS Incentivizing Participation through sensitive and flexible Pricing Fund Transfer to VWSC Results obtained : Financial Year wise comparative study

Overview OF Progress: NRDWP (2013-14) SL No Particulars Number (s) 1 Revenue Village 29409 2 VWSC Formed 28407 3 Bank Account Opened 25994 4 Hand Pumps 379807 5 Pipe Water Supply Schemes 348 6 Pipe Water Supply Schemes (On going) 53 7 Schemes in Quality Affected Areas 237 8 PWS Handed Over 2804 9 Tool Kit Distribution 4862 10 Training & Skill Development 8846 11 Sanctioned RPWS Scheme 52

Process Innovations in NRDWP : Highlights & New Developments 120.18% habitation covered against 20 point Target during the FY 2012-13 First Time Jharkhand Received additional Fund of Rs. 75.00 Crore from GoI in the Financial Year 2012-13 New Developments Placement of District Project Management Unit (DPMU) Involvement of Village Water and Sanitation Committee (VWSC) Equipping Field officials with GPS and Geomorphological Maps Solar Based Pipe Water Supply Scheme Use of Pre Fabricated Water Tanks PRI Training on O & M of PWS & DT Partnership with NABARD, and NSDM Skill Development under Yuva Kaushal Vikash scheme Repair of DT Pipeline Motor & Electrical Fitting

PPP Model For Rural PWSS : Jharkhand State Key Obligations of VWSC: Supervision for running Raw Water Supply for 6 Hours a Day Regularizing Illegal Connection before Handing Over Prevent illegal Consumptions Key Obligations of Contractor Provide 55 LPCD/as per Demand by Community Training of VWSC Member O & M of Water Works Maintain Log Book for Water Supply & Complaint Registrar Round the clock availability of Operator Collection of user charge Contractor Water Users VWSC DWSC Service Provision as per contract Key Obligation of DWSC: Assistance to Operator Monitoring and Supervision Payment of user charge

Operation and Maintenance of Rural Pipe Water Supply in PPP Mode SL No District Mini PWS ( No) 1 Medininagar 99 2 Garhwa 20 3 Sahebganj 29 4 Pakur 15 Cost Recovery Norm 1st Year 10% 2nd Year 20% 3rd Year 30% 4th Year 100%

Incentivizing Participation through sensitive and Flexible Pricing Pioneering Effort by DWSD to enhance VWSC participation in managing PWS schemes Step Wise reduction from 4.40 (10-11) to 2.20 (11-12) and 1.10 (12-13) VWSC managed PWS schemes charged with Rs 1.10 per unit (Normal rate is Rs. 4.40 per unit) If a scheme fails to supply water , No Power connection provided Power cost previously accounting for 60% of the O &M is reduced to 40% More fund now available for O&M Temporal Trend in Reduction of Electricity Charge as observed in Gadri village

Fund Transfer to VWSC For NRDWP Sl No Purpose Amount Transferred 1 O & M of DT 12 Crore Hand Pump Repair & Maintenance by VWSC 2 O& M of PWS 1 Crore Matching Grant equivalent to Amount Generated by VWSC 3 Sustainability 28.36 Crore Water Harvesting Structure being constructed by VWSC* 4 DPR Preparation 10 Crore Developing Rural Pipe Water Supply Scheme by VWSC *Jal Sahiya is provided Rs.500 as incentive For monitoring and supervision of Soak pits. This is the highest amount provisioned for JS for any activity to be taken up by them. This is to popularize the concept of Rain Water Harvesting and conservative use of Water in Rural context.

Enhanced O &M, Sustainability and Water Quality Monitoring and Surveillance O & M of PWS By VWSC : 2804 schemes transferred 4197 Single village Schemes in pipe line Tool kits for hand pump repairing distributed among 4562 gram Panchyats Pilot projects on Dinking Water Sustainability 10 Water qualities affected and Water stressed block Water Quality Quality of 29132 samples tested through Field Test Kits. Field Test Kits among 26047 Jal Sahiyas in all 24 districts Fully equipped laboratories have been established in 14 District Total 2929 Samples tested in Laboratory

User Fee collection in Rupees VWSC Managed Pipe Water Supply scheme : Breaking the myth that Poors Don’t Pay S. N. Name of the Village Connections User Fee collection in Rupees 1 ShivalbariUttar 450 179,640 2 Shivalbari Dakshin 196 123,743 3 Shivalbari East 455 387,789 4 Shivalbari Central 230 134,451 5 Agayarkund South 395 256,772 6 Agayarkund Uttar 143,000 7 Medha 322 142,413 8 Vrindavanpur 120 35,000 9 Jaynagar 500 100,000 10 Sarai Kella 142 123,350 11 Charadih 213 238,540 12 Bero 207 70,000 13 Nuamundi (Bazar Samity) 192 10, 00,000 14 Mahudi 270 2,65,000 15 Khijri 200 112,506 16 MandarTigoe 180 40,000 17 Barasi 138 60,000 18 Meru 160,000 19 Rasonia 188 202,000 20 Kalubira, Simdega 140

Financial Year Wise Physical Achievement up to December

Financial Year Wise up to December OB+ Release& Expenditure under NRDWP Central Share (Program Fund) in Crores of Ruppees

Percentage of Physical and Financial Progress

Nirmal Bharat Abhiyan: Flow of Presentation Program Update and over View MGNREGS Convergence and conjoint Approach Reinventing Revolving Fund to address Slip Back Piloting Bio Toilet initiative in Jharkhand Involving Corporate Social Responsibility Results obtained : Financial Year wise comparative study Upcoming Activities

Nirmal Bharat Abhiyan: Program Update and over view 45000 individual household toilets ;199 Institutional Toilets 400 Open Defecation Free Villages in a span of 18 months Pilot Project on Bio Toilet and SLWM taken up State made it mandatory for aspiring PRI electoral candidates to have sanitary toilets in their houses as a pre-qualification The candidates will have to obtain a certificate from Gram Sabhas certifying that they have a toilet in their house for contesting elections. CSR involvement in Sanitation initiated Government is considering making toilet pans VAT free To bring down the input cost of Individual Household latrine construction cost

Convergence and Conjoint Approach: MGNREGS & NRLM Funds released to various Gram Panchyats for toilet construction under MNREGA convergence Deoghar Koderma Godda Latehar Lohardagga Ranchi A proposal to construct 1.5 lakh toilets under MNREGA has been approved By 2014 DWSD envisage to construct 2 lakh to 2.5 lakh toilets in the state Partnership worked out between the NBA, NRDWP and JSLPS (Jharkhand State Livelihood promotion Society The engagement of the Self Help Group (SHG) women Strengthen Village Water and Sanitation Committee (VWSC) Enhancing social capital to the Nirmal Bharat Abhiyan

Sanitation Saturation approach Reinventing Revolving Fund Implementation strategy revolving around the “saturation approach” Fundamental Belief Shift from targeting families to targeting communities No longer counting toilets but taking stock of ODF villages Complements BCC & CLTS with Financial Provisioning Implementation Steps Total population of the village as unit Target for “open defecation Free Village VWSC to have community consensus on achieving ODF status the slip back households to opt for new toilets Access a loan from the District Water and Sanitation Mission (DWSM). Loan is supplied using provisions of the Revolving Funds(Rs. 50 lakhs per district) Loan Repaid from incentive/ Labour Payment afterwards

Piloting Bio Toilet , Pay and Use Community toilet and Solid Liquid Waste Management Initiative in Jharkhand Pay and Use Toiltes initiated in 4 locations ;SLWM is being piloted in 2 Locations CSR being involved in 4 dedicated Projects Hindustn Copper Limited at East Singhbhum Ultratech Cement at Koderma TATA Power at East Singhbhum Eastern Coalfields Limited at Godda Dedicated handbook regarding different program component being prepared In all flagship scheme there is provision for Block Resource Centre; However mostly remains non functional. DWSD out sourced it to few CSOs. CSOs are working as Project Management Consultants; This enhanced, smoothen and regularize Work flow without any Strike or interruption

Research and Development & Upcoming activities First phase of R &D project on Sustainability research is nearing completion started in collaboration with Columbia University. The project works on Rain water Harvesting & Ground Water Recharge Using mines pit water for drinking purpose Aerobic Bio-Toilet piloted in collaboration with Stone Biotech Deoghar Shravani mela Scaling up proposed in Community Toilets 4 Anaerobic Bio toilet is proposed to be piloted in 4 community toilets on pilot basis with facilitation from UNICEF Ranchi, Hazaribag, West Singhbhum and Gumla Training on Accounts maintenance by Jal Sahiya Orientation Training of MLA & MPs on WASH issues