22 Lloyd’s Salvage Agreement LOF 2000 www.lloyds.com.

Slides:



Advertisements
Similar presentations
ISTISNA’.
Advertisements

Let’s Study Legal English Together!
ETHICS. Business Conduct  The Agent agrees to conform to all applicable federal, state and local laws in conducting business under this agreement.
Article XXXVI – Signature, ratification, acceptance, approval or accession 1. – This Protocol shall be open for signature in Berlin on 9 March 2012 by.
© 2013 Sri U-Thong Limited. All rights reserved. This presentation has been prepared by Sri U-Thong Limited and its holding company (collectively, “Sri.
AIDA XIV World Congress 2014 Rom, 30 th September 2014 Marine Insurance WP “Sue and labour expenses – H&M on German terms or P&I?” Dr. Maximilian Guth,
Contract Performance, Breach and Remedies Chapter 9.
ENVIRONMENTAL SALVAGE A CURRENT STATUS Robert B. Parrish President, The Maritime Law Association of the United States September 17, 2012.
Vidar Solemdal Senior Claims Executive, Gard AS January 15th, 2014
Crossing Agreements Canadian Best Practice Crossing Agreements A Canadian Best Practice Brad Watson TransCanada Pipelines and Alberta Common Ground Alliance.
© DET JURIDISKE FAKULTET UNIVERSITETET I OSLO OWNER’S LIABILITY SECOND LECTURE LIMITATION OF LIABILITY.
Best international practices – the ICC model contracts and changing circumstances.
IMCC - 26/28 October 2005 DUBLIN IMCC 2005 SALVAGE – SCOPIC CLAUSE HULL & MACHINERY UNDERWRITERS’ PERSPECTIVE.
The introduction of SCOPIC ( The Special Compensation P&I Clause)
Completion Outstanding work and Remedying Defects In order that the Works and Contractor's Documents, and each Section, shall be in the condition required.
BAILMENT AND PLEDGE.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
The 2001 UCH Convention in the Context of the Law of the Sea.
CMI AND PLACES OF REFUGE presented by Stuart Hetherington.
York Antwerp Rules 2004 Progress or problems for Underwriters and Shipowners? Tim Madge FAAA - Partner Mediterranean Average Adjusting Company Marine Law.
Contracts: Third Party Rights, Discharge, Breach and Remedies Chapter 10.
Time for a new standard - AS General Conditions of Contract
Lao Contract and Tort Law (2008) Presented by: Santisouk Phounesavath Director of Multilateral Trade Division Foreign Trade Policy Department Ministry.
EU: Bilateral Agreements of Member States
EU: Bilateral Agreements of Member States. Formerly concluded international agreements of Member States with third countries Article 351 TFEU The rights.
Construction Contract Administration (ENGC 6363) ( FIDIC Chapter 15) EMPLOYER BY TERMINATION Presented by: Mustafa Al tayeb.
The Islamic University of Gaza Engineering Faculty
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11.
Vienna Convention on the Law of Treaties 1969
An Act of Parliament to provide for compensation to employees for work related injuries and diseases contracted in the course of their employment and for.
Minimum Wages Act History of Minimum Wages ILO Convention no26 in1928 Recommended Machinery for Fixation of minimum wages The Standing Labour Committee.
AGENCY IN LIBYA OVERVIEW.  In1971, the Agency Law permitted the Libyan nationals to carry out activities of commercial agency  In 1975, the Libyan government.
December 8, Changes to Patent Fees Under the Consolidated Appropriations Act, 2005 (H.R. 4818)(upon enactment) and 35 U.S.C. 103(c) as Amended by.
Bahamas Ship Owners’ Association (BMA) Maritime Labour Convention Ammendments Maurice Kelleher Manager, Management Systems Certification, ABS Americas.
LLOYD’S OPEN FORM LOF 2011 The most widely used form of salvage contract in the world A long history – LOF has been in existence for over 100 years.
Contract Review.  1. The final step in the vendor contracting process should be getting the vendor’s standard written contract and signing the contract.
Agency AUTHORITY OF AGENTS (1) Where an agent acts in the name of a principal, the rules on direct representation apply. (2) Where an intermediary acts.
LOGO The collective agreement. The labour contract.
MARINE INSURANCE.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
DUTY OF THE ASSURED Prepared by: Ms. Norazimah Mazlan.
The Law of Salvage Lecture 2008 Professor, jur. dr Svante O. Johansson.
The Development of Environmental Salvage and Review of the Salvage Convention 1989 Archie Bishop Holman Fenwick Willan.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
Forms of Business and Formation of Partnerships Chapter 37.
1 A decade of revisions at UNCITRAL Special Course 6 – James Castello Lecture 5 Arbitration Academy PA R I S SUMMER COURSES
Minimum Wages Act 1948.
1 中央大學營管所學分班 工程契約與文件管理 CHAPTER 16 TEST AFTER COMPLETION Silver Book, 2002 Clause 12. 授課教授 : 謝定亞 博士 學員 : 陳忠正 ( 研發中心管線組 )
Introduced some basic knowledge of the contract First, what is the contract? Contract, also known as contract. China's definition of the contract, the.
Chapter 18.  A fiduciary relationship “which results from the manifestation of consent by one person to another that the other shall act in his behalf.
International Conventions on Collective Bargaining.
Cabotage Law Republic Act No A Lecture in SEMFILA Ly, Jason.
OMB Circular A-122 and the Federal Cost Principles Copyright © Texas Education Agency
Legal framework of telework – practical solutions for employers Dr. Jacek Męcina.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
HOW TO PROTECT YOUR INTEREST IN A SALE CONTRACT Focus on what you “get” when you sign!
1 Unification of contract law and Russian law ICC documents.
Article 4 [Obligations of Applicant] 4.1. As a sole and exclusive owner of the Application, Applicant warrants that.
THIRD LECTURE LIMITATION OF LIABILITY
CORPORATE LAW.
The introduction of SCOPIC ( The Special Compensation P&I Clause)
Department for Maritime and Transport Law| 21 May 2018 Dr. Iva Savić
THE APPRENTICES ACT, 1961 The Act extends to the whole of India.
INTELLECTUAL PROPERTY RIGHTS (IPR) IN FP7
Indemnity and Guarantee
SALVAGE – SCOPIC CLAUSE
Mandate Contract Specific work contract construction works contract
© 2013 Sri U-Thong Limited. All rights reserved
Vienna Convention on the Law of Treaties 1969
Presentation transcript:

22 Lloyd’s Salvage Agreement LOF

LLOYD'S STANDARD FORM OF SALVAGE AGREEMENT (APPROVED AND PUBLISHED BY THE COUNCIL OF LLOYD’S) NO CURE - NO PAY LOF 2000

A. Contractors’ basic obligation: The Contractors identified in Box 1 hereby agree to use their best endeavours to salve the property specified in Box 2 and to take the property to the place stated in Box 3 or to such other place as may hereafter be agreed. If no place is inserted in Box 3 and in the absence of any subsequent agreement as to the place where the property is to be taken the Contractors shall take the property to a place of safety.

A. Contractors’ basic obligation: The Contractors identified in Box 1 hereby ______ to use their best endeavours to ______ the property specified in Box 2 and to take the _______ to the place stated in Box 3 or to such other place as may _______ be agreed. If no place is inserted in Box 3 and in the absence of any subsequent _______ as to the place where the property is to be taken the _______ shall take the property to a place of _______.

B. Environmental protection: While performing the salvage services the Contractors shall also use their best endeavours to prevent or minimise damage to the environment.

B. Environmental protection: While ________ the salvage ________ the Contractors shall also use their best ________ to prevent or minimise damage to the ________.

C. Scopic Clause: Unless the word “No” in Box 7 has been deleted this agreement shall be deemed to have been made on the basis that the Scopic Clause is not incorporated and forms no part of this agreement. If the word “No” is deleted in Box 7 this shall not of itself be construed as a notice invoking the Scopic Clause within the meaning of sub- clause 2 thereof.

C. Scopic Clause: ________ the word “No” in Box 7 has been deleted this agreement shall be ________ to have been made on the basis that the Scopic Clause is not ________ and forms no part of this agreement. If the word “No” is deleted in Box 7 this shall not of itself be ________ as a notice ________ the Scopic Clause within the meaning of sub- clause 2 thereof.

The SCOPIC Clause The ancient salvage principle of “no cure – no pay” became a problem in the second half of the 20 th Century as the transportation of oil increased and we discovered the extent of the damage pollution could cause. The salvage of such tankers was usually expensive to carry out and the residual value low, making many operations uneconomic, but all too often the problem was exacerbated by government intervention preventing the completion of the service by a refusal to grant a place of refuge. This meant ‘no cure’ was effected, which in turn meant ‘no pay’ – despite any high salving expense. To encourage the salvor to go to the assistance of such ships the 1989 Salvage Convention ameliorated the harshness of this age old ‘no cure – no pay’ principal, by introducing in Article 14, a new concept – Special Compensation.

Article 14 was well–intentioned but in practice it turned out to be cumbersome, contentious and expensive to operate and had the wholly unintended consequence of discouraging salvors from attending casualties where there was the threat of environmental damage. Traditional salvage awards were always paid by property underwriters (ship and cargo) but under Article 14 it was the liability insurers, the P&I Clubs, who were to pay compensation. They were also unhappy with the new provisions which involved them in salvage for the first time.

The SCOPIC Clause In response to the problems, the shipping industry worked cooperatively to devise the SCOPIC clause – the “Special Compensation P and I Club” Clause, which was specifically designed to replace, and have the same effect, as Article 14, but avoid the legal problems that the assessment of Special Compensation under Article 14 caused. SCOPIC is a very large clause, one made up of 16 sub-clauses, three Appendices and two codes of conduct. While effective, it is not easy to digest.

he SCOPIC clause ( (Special COmpensation P & I Club) endorsed this concept but introduced a tariff to calculate the Contractor's Special Compensation together with an uplift fixed at 25%. Traditional Article 13 Awards will be discounted by 25% of the amount by which any Article 13 Award exceeds the SCOPIC remuneration.

D. Effect of other remedies: Subject to the provisions of the International Convention on Salvage 1989 as incorporated into English law (“the Convention”) relating to special compensation and to the Scopic Clause if incorporated the Contractors' services shall be rendered and accepted as salvage services upon the principle of “no cure - no pay” and any salvage remuneration to which the Contractors become entitled shall not be diminished by reason of the exception to the principle of “no cure - no pay” in the form of special compensation or remuneration payable to the Contractors under a Scopic Clause.

D. Effect of other remedies: _______ to the provisions of the International Convention on _______ 1989 as incorporated into English law (“the Convention”) relating to special _______ and to the Scopic Clause if incorporated the Contractors' services shall be _______ and accepted as salvage services upon the principle of “_______” and any salvage _______ to which the Contractors become _______ shall not be diminished by reason of the exception to the principle of “no cure - no pay” in the form of special compensation or remuneration _______ to the Contractors under a Scopic Clause.

E. Prior services: Any salvage services rendered by the Contractors to the property before and up to the date of this agreement shall be deemed to be covered by this agreement.

E. Prior services: Any salvage services _______ by the Contractors to the property before and _______ date of this agreement shall be _______ to be covered by this agreement.

F. Duties of property owners: Each of the owners of the property shall cooperate fully with the Contractors. In particular: (i) the Contractors may make reasonable use of the vessel's machinery gear and equipment free of expense provided that the Contractors shall not unnecessarily damage abandon or sacrifice any property on board; (ii) the Contractors shall be entitled to all such information as they may reasonably require relating to the vessel or the remainder of the property provided such information is relevant to the performance of the services and is capable of being provided without undue difficulty or delay; (iii) the owners of the property shall co-operate fully with the Contractors in obtaining entry to the place of safety stated in Box 3 or agreed or determined in accordance with Clause A.

F. Duties of property owners: Each of the owners of the property __________ cooperate fully with the __________ In particular: (i) the Contractors may make __________ use of the vessel's machinery gear and equipment free of __________ provided that the Contractors shall not unnecessarily damage abandon or sacrifice any __________ on board; (ii) the Contractors shall be __________ to all such information as they may reasonably require relating to the vessel or the remainder of the property __________ such information is relevant to the performance of the services and is capable of being provided without undue difficulty or delay; (iii) the __________ of the property shall co-operate fully with the Contractors in obtaining entry to the place of __________ stated in Box 3 or agreed or determined in __________ with Clause A.

G. Rights of termination: When there is no longer any reasonable prospect of a useful result leading to a salvage reward in accordance with Convention Articles 12 and/or 13 either the owners of the vessel or the Contractors shall be entitled to terminate the services hereunder by giving reasonable prior written notice to the other.

G. Rights of termination: When there is no longer any reasonable _______ of a useful result leading to a salvage _______ in accordance with Convention Articles 12 and/or 13 either the _______ of the vessel or the Contractors shall be _______ to terminate the services hereunder by giving reasonable prior written _______ to the other.

H. Deemed performance: The Contractors' services shall be deemed to have been performed when the property is in a safe condition in the place of safety stated in Box 3 or agreed or determined in accordance with Clause A. For the purpose of this provision the property shall be regarded as being in safe condition notwithstanding that the property (or part thereof) is damaged or in need of maintenance if – (i) the Contractors are not obliged to remain in attendance to satisfy the requirements of any port or habour authority, governmental agency or similar authority and – (ii) the continuation of skilled salvage services from the Contractors or other salvors is no longer necessary to avoid the property becoming lost or significantly further damaged or delayed.

H. Deemed performance: The Contractors' services shall be deemed to have been __________ when the property is in a __________ condition in the place of safety stated in Box 3 or __________ or determined in accordance with Clause A. For the __________ of this provision the property shall be regarded as being in safe condition __________ that the property (or part thereof) is damaged or in need of maintenance if – (i) the Contractors are not obliged to remain in attendance to __________ the requirements of any port or habour authority, __________ agency or similar authority and – (ii) the continuation of skilled salvage services from the Contractors or other __________ is no longer necessary to avoid the property becoming lost or significantly further damaged or delayed.

I. Arbitration and the LSSA Clauses: The Contractors' remuneration and/or special compensation shall be determined by arbitration in London in the manner prescribed by Lloyd's Standard Salvage and Arbitration Clauses (“the LSSA Clauses”) and Lloyd’s Procedural Rules. The provisions of the LSSA Clauses and Lloyd’s Procedural Rules are deemed to be incorporated in this agreement and form an integral part hereof. Any other difference arising out of this agreement or the operations hereunder shall be referred to arbitration in the same way.

I. Arbitration and the LSSA Clauses: The Contractors' __________ and/or special compensation shall be determined by __________ in London in the manner prescribed by Lloyd's Standard Salvage and Arbitration Clauses (“the __________ Clauses”) and Lloyd’s Procedural Rules. The provisions of the LSSA Clauses and Lloyd’s Procedural Rules are deemed to be incorporated in this agreement and form an integral __________ hereof. Any other difference __________ out of this agreement or the operations hereunder shall be __________ to arbitration in the same way.

J. Governing law: This agreement and any arbitration hereunder shall be governed by English law. K. Scope of authority: The Master or other person signing this agreement on behalf of the property identified in Box 2 enters into this agreement as agent for the respective owners thereof and binds each (but not the one for the other or himself personally) to the due performance thereof.

J. ____________: This agreement and any arbitration hereunder shall be _________ by English law. K. Scope of _________ : The Master or other person signing this agreement on _________ of the property identified in Box 2 enters into this agreement as agent for the respective owners thereof and _________ each (but not the one for the other or himself personally) to the due performance thereof.

L. Inducements prohibited: No person signing this agreement or any party on whose behalf it is signed shall at any time or in any manner whatsoever offer provide make give or promise to provide or demand or take any form of inducement for entering into this agreement.

IMPORTANT NOTICES : 1. Salvage security. As soon as possible the owners of the vessel should notify the owners of other property on board that this agreement has been made. If the Contractors are successful the owners of such property should note that it will become necessary to provide the Contractors with salvage security promptly in accordance with Clause 4 of the LSSA Clauses referred to in Clause I. The provision of General Average security does not relieve the salved interests of their separate obligation to provide salvage security to the Contractors.

2. Incorporated provisons. Copies of the Scopic Clause; the LSSA Clauses and Lloyd’s Procedural Rules may be obtained from (i) the Contractors or (ii) the Salvage Arbitration Branch at Lloyd’s, One Lime Street, London EC3M 7HA.

IMPORTANT NOTICES : 1. Salvage security. As soon as possible the owners of the vessel should _________ the owners of other property on board that this agreement has been _________. If the Contractors are _________ the owners of such property should note that it will become necessary to _________ the Contractors with salvage _________ promptly in accordance with Clause 4 of the LSSA Clauses referred to in Clause I. The provision of General Average security does not _________ the salved interests of their separate obligation to provide salvage _________ to the Contractors.