Vidar Solemdal Senior Claims Executive, Gard AS January 15th, 2014

Slides:



Advertisements
Similar presentations
A GIA is a contract between a surety company and a contractor (or subcontractor)/principal. A GIA is a standard, typical document in the construction.
Advertisements

Marine Cargo Loss Payment (Partial Loss)
Contracts – important issues
Funds administration, also referred to as funds control, funds disbursement, funds management, and escrow, is a method that sureties use to offset the.
AIDA XIV World Congress 2014 Rom, 30 th September 2014 Marine Insurance WP “Sue and labour expenses – H&M on German terms or P&I?” Dr. Maximilian Guth,
Mega Container Ship Casualties – General Average
22 Lloyd’s Salvage Agreement LOF
ENVIRONMENTAL SALVAGE A CURRENT STATUS Robert B. Parrish President, The Maritime Law Association of the United States September 17, 2012.
S.O.S. – Calling All Pirates! Implications from “Tow” or “Salvage” Services Provided to your Vessel Robert M. Cavalier, Esquire LUCAS AND CAVALIER, LLC.
New Chilean Regulation of Liability Insurance Insurance Contract Act Statute Law Nr – May 9th, 2013 Under a Project written by Prof. Osvaldo Contreras-Strauch.
Contract Law 2014 NCHCA Education Series- January 23, 2014 Presented by Geoffrey Cantello, City of Ottawa and Ron Price, Rasmussen Starr Ruddy LLP.
IMCC - 26/28 October 2005 DUBLIN IMCC 2005 SALVAGE – SCOPIC CLAUSE HULL & MACHINERY UNDERWRITERS’ PERSPECTIVE.
The introduction of SCOPIC ( The Special Compensation P&I Clause)
INTERTANKO SEMINAR, DALIAN Session 5 Tanker Charterparties – recent cases and model clauses John C. Fawcett-Ellis.
17 th Contracting Squadron I n t e g r i t y - S e r v i c e - E x c e l l e n c e LETTER CONTRACTS 2k7 01 Dec 05 Train and deploy the world’s foremost.
Law I Chapter 18.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
Virtual Arrival an Initiative by Shipping to reduce GHG emission Singapore 8 may 2012 Senior Manager Research & Projects INTERTANKO.
1 Keys for Chapter 5 Keys for Chapter 5 1. Do you think the insurance company should pay the claim to the insured? Why? Yes, the insurance company should.
Household Insurance. Distinguish between Insurance Protection against a loss you hope will not happen. Eg. car accident. Assurance Protection against.
YORK-ANTWERP RULES AND PLACES OF REFUGE FOLLOWING THE CMI CONFERENCE 2004 By Ben Browne Shaw and Croft.
CMI AND PLACES OF REFUGE presented by Stuart Hetherington.
York Antwerp Rules 2004 Progress or problems for Underwriters and Shipowners? Tim Madge FAAA - Partner Mediterranean Average Adjusting Company Marine Law.
Topic 11. Insurance Policy Provisions BUS 200 Introduction to Risk Management and Insurance Jin Park.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
9-1 General Requirements - Enforceable Contract 1.Offer and acceptance 2.Consideration 3.Legal object 4.Competent parties 5.Legal form.
Farm Leasing Basics ASAP Business of Farming Conference, February 22, 2014 Eric Mine – Land Loss Prevention Project All Rights Reserved Eric Mine,
Workers Compensation Commission Sian Leathem Registrar 29 September 2008.
SHIP AND LIABILITY – an introduction to Norwegian Maritime Law
MARITIME TRANSPORTATION MANAGEMENT
Maritime Claims An Underwriter ’ s Perspective Eamonn Magee LLB. BL.
P&I AND MARINE INSURANCE
LLOYD’S OPEN FORM LOF 2011 The most widely used form of salvage contract in the world A long history – LOF has been in existence for over 100 years.
Contract Review.  1. The final step in the vendor contracting process should be getting the vendor’s standard written contract and signing the contract.
Hüseyin Arslan, LLM Legal Counsel ERGO Turkey. Hüseyin Arslan, LLM. “Insurance Arbitration [Turkish Practice]”  Insurance litigation in Turkey has long.
Dublin International Marine Claims Conference - 29th September / 1st October 2004 INTERNATIONAL MARINE CLAIMS CONFERENCE CLAIMS HANDLING FRENCH MARKET.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
Loss of Hire Anna F. Erlandsen – Norwegian Hull Club Oslo, 8th November 2013 The Nordic Association of Marine Insurers.
Questions to Consider What is the difference between Insurance and assurance? Please use an example in your answer. Explain the 5 principles of insurance?
Is It Worth It? The Cost of Insurance. Insurance Terms Premium Deductible Underwriting.
IMCC Dublin 2015 Scandinavian approach to large casualties By Ivar Brynildsen, VP Gard AS.
1 Loss Prevention from the Insurers perspective The LP process as a whole The LISCO GLORIA fire in a LP perspective The Insurers role Magnus Gustafsson.
DUTY OF THE ASSURED Prepared by: Ms. Norazimah Mazlan.
The Law of Salvage Lecture 2008 Professor, jur. dr Svante O. Johansson.
International Marine Claims Conference Dublin October2005 Salvage Session – SCOPIC Chris Beesley Ince & Co, London.
The Development of Environmental Salvage and Review of the Salvage Convention 1989 Archie Bishop Holman Fenwick Willan.
Bank guarantees or letters of guarantee Know the letter of guarantee or bank guarantee is a written undertaking by a Bank, usually at the request of the.
ANNUITIES AND POLICY CONDITION OF LIFE INSURANCE.
Marine Claims – Loss of Hire NMIP Chapter 16 By Sveinung Måkestad, Vice President, Gard AS The Nordic Association of Marine Insurers 1.
PRINCIPLES :- BASIC PRINCIPLES LEGAL PRINCIPLES.
Migrants at Sea – The Club’s Role Christopher Petrie DM:
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
1 Avtor Naslov gradiva Univerza v Ljubljani Fakulteta za pomorstvo in prometb TOWAGE AND PILOTAGE CONTRACT Doc. dr. Boris Jerman Norman Martinez Ph.D.
HOW TO PROTECT YOUR INTEREST IN A SALE CONTRACT Focus on what you “get” when you sign!
Chapter 5 Maritime Lien. 一、 Definition of maritime liens(ML) : CMC Art. 21 A maritime lien is the right of the claimant, subject to the provisions of.
Insuring Your Future Objective: Discuss the common types of insurance Identify when an insurable interest is present Bellwork: What kinds of insurance.
MARINE INSURANCE.
The introduction of SCOPIC ( The Special Compensation P&I Clause)
Insurance Act Business Law
What Small and Emerging Contractors Need to Know Understanding Funds Administration © Copyright 2017 NASBP.
Lecture11 Insurance.
SIMAD UNIVERSITY Keyd abdirahman salaad.
Department for Maritime and Transport Law| 21 May 2018 Dr. Iva Savić
Maritime Law General introduction Chapter1.
SALVAGE – SCOPIC CLAUSE
PROTECTION & INDEMNITY
Unique General Conditions of the Alabama Building Commission (ABC)
Casualty – What is the Right Contract?
7. Measures to avert or minimize loss
Presentation transcript:

Vidar Solemdal Senior Claims Executive, Gard AS January 15th, 2014 SALVAGE Vidar Solemdal Senior Claims Executive, Gard AS January 15th, 2014 The Nordic Association of Marine Insurers

Introduction to salvage Principle of salvage Salvage contracts LOF/SCOPIC Examples The Nordic Association of Marine Insurers

1. The principle of salvage: No Cure, No Pay Award are based on salved values and nine other factors based on article 13 of the 1989 Salvage convention The Nordic Association of Marine Insurers

The principle of salvage – criteria for the Award 1989 Salvage Convention Article 13 Salved value Skills and efforts in preventing damage to environment Measure of success Nature and degree of danger Skills and efforts in salving vessel, property, life Time used and expenses and losses incurred Risk of liability and other risks The promptness of the service rendered Availability and use of vessels and other equipment State of readiness and efficiency of salvors equipment The Nordic Association of Marine Insurers

The principle of salvage, cont. A salvage situation is a situation where the vessel need assistance from third parties (Salvors) to avoid damage to the vessel: Refloat the vessel if grounded Put out fire Tow to safe port etc. The Nordic Association of Marine Insurers

The principle of Salvage, cont. Most Salvors, in any part of the world will try to demand/persuade the master to sign a salvage contract (LOF/TOF etc) prior to commencing the salvage operation. Is this OK? Yes, if the vessel, crew or cargo is in immediate danger. No, if the situation is relatively stable and Owner/Insurer can be contacted prior to signing. The Nordic Association of Marine Insurers

The principle of salvage, cont. Depending on vessel location and the level of danger the vessel is in, it is very often time to negotiate with the salvors. A fixed priced agreement (lump sum, hourly rate, day rate etc) will always be preferred if time permits. The main responsibility of the Master in a perilous situation is to protect human life, the environment and the property under his charge, and if these are seriously threatened there will be no time to negotiate alternative contracts to an open form. The Nordic Association of Marine Insurers

2. Salvage contracts Standard contracts LOF 2011 – Lloyds Open Form TOF – Turkish Open Form Salvage contract for Turkish monopoly area Towcon Ocean towage agreement (lump sum) Towhire Ocean towage agreement (daily hire) Wreckhire Wreck removal and marine services agreement (daily hire) Wreckfixed Wreck removal and marine services agreement (fixed price – no cure, no pay) The Nordic Association of Marine Insurers

Contracts – LOF Purpose of the LOF Contract Recognized all over the world Simple to fill in – one page For all situations Disputes to be solved by the Lloyds Arbitration The Nordic Association of Marine Insurers

Contracts – LOF The Nordic Association of Marine Insurers

Contracts – LOF The Nordic Association of Marine Insurers

Contracts – LOF 2000 vs LOF 2011 Minor changes to the LOF: Details of LOF award will be «public» on Lloyds website All contracts made shall be reported to Lloyds Changes to LSSA (Lloyds Standard form of Salvage Agreement) Salvor can demand Security for fees incurred or (reasonably) anticipated. (Clause 6.6 and 10.8) New Clause 13: Cargo security. Notice to cargo insurers only. New Clause 14: Salvor can apply to Arbitrator to bind the minority of cargo Owners (when 75% agree) New Clause 15: Excuse liability for salvage for low value cargo. (Clause 13, 14 and 15 only applicable for container cargo) The Nordic Association of Marine Insurers

LOF Statistics The Nordic Association of Marine Insurers

LOF Statistics The Nordic Association of Marine Insurers

3. Salvage - SCOPIC No Cure, No Pay Award can not be higher than salved values Severe casualty – high risk – low value The Nordic Association of Marine Insurers

Salvage - SCOPIC 1989 Salvage convention Article 13 – Salvage Award Article 14 – Special compensation The Nordic Association of Marine Insurers

Salvage - SCOPIC 1989 Salvage Convention Article 13 Salved value Skills and efforts in preventing damage to environment Measure of success Nature and degree of danger Skills and efforts in salving vessel, property, life Time used and expenses and losses incurred Risk of liability and other risks The promptness of the service rendered Availability and use of vessels and other equipment State of readiness and efficiency of salvors equipment The Nordic Association of Marine Insurers

Salvage - SCOPIC Article 14 of the 1989 Salvage convention Expenses covered if threat or damage to the marine environment. Increased if damage avoided SCOPIC = Special Compensation P&I Clause ISU and IG – replaces article 14 Article 14 still applies where SCOPIC not applicable The Nordic Association of Marine Insurers

Salvage - SCOPIC SCOPIC Must be incorporated in LOF and invoked Replaces article 14 SCOPIC remuneration Based on tariff rates + 25% + out of pocket expenses Subject to speedy payment provisions Paid for excess Art. 13 awards Control of tariffs and ”Taxi –meter” Special Casualty Representative (SCR) Tariff rates are relatively generous, and the 25% is the salvage bonus. The Nordic Association of Marine Insurers

SCOPIC Typical tariff details The Nordic Association of Marine Insurers

SCOPIC – invoke or not The Nordic Association of Marine Insurers

SCOPIC – invoke or not Can be invoked at any time by contractor (in writing). SCOPIC cost start counting from time of written notice. Salvage services according to Art. 13 Scopic tariffs only when exceeding Art. 13 Discount If Art. 13 exceeds SCOPIC tariffs, the Art. 13 award or settlement shall be discounted with 25% of the difference between the award and the SCOPIC remuneration (but then counted from day 1) The Nordic Association of Marine Insurers

Salvage Case study (14.9, page 325 in Gard guidance) A fully laden container vessel of 9,567 GT suffered Main Engine breakdown in the Atlantic Ocean, approximately 50 nm SW of Madeira. Weather conditions at the time favourable but the attempts to rectify the problem failed. Vessel drifted slowly towards Madeira. After some back and forth, H&M confirmed to Owner that they were ready to conclude a contract with salvage company X, on a daily hire basis. Salvor had suitable tug and equipment two days away. Shipowner, unfortunately, had in the meantime signed a LOF with SCOPIC incorporated with salvage company Y. Salvage company Y resources were 4 days away. The Nordic Association of Marine Insurers

Salvage Case study, cont. One day later weather deriorated. Vessel continued her drifting towards the shoreline of Madeira, and was estimated to run aground in 30 hours. Salvor Y invoked SCOPIC. Salvor Y sub-contracted Salvor X to prevent grounding/save vessel. Vessel grounded before Salvor X tug arrived. Salvor Y successfully refloated the vessel in 18 days. Lloyds Arbitration Panel awarded Salvor Y the sum of USD 4,150,000 – pursuant to article 13 of the Salvage Convention. This was based on a saved value (ship, cargo and bunker) of MUSD 42. The Nordic Association of Marine Insurers

Salvage Case study, cont. Article 13 award was higher than the total SCOPIC cost, which were assessed/calculated to USD 3,320,000.- A deduction of 25% of the difference between SCOPIC and Article 13 was deducted from the award ((4,150,000 – 3,320,000) * 0.25 = 207,500) Salvage award = 4,150,000 – 207,500 = USD 3,942,500 paid by Property insurers (H&M and Cargo) What went wrong? The Nordic Association of Marine Insurers

SCOPIC example 6 day service SCOPIC invoked on day 3 Art. 13 award MUSD 1.5 SCOPIC expenses from date invoked USD 400,000.- SCOPIC recalculated from day 1, USD 700,000.- Diff between Art. 13 and SCOPIC = USD 800.000.- Salvage award = USD 700’ + USD 600’ = MUSD 1,3 The Nordic Association of Marine Insurers

Scopic Example - illustrated The Nordic Association of Marine Insurers

4. Practical examples The Nordic Association of Marine Insurers

Salvage case 1 - Voutakos Voutakos Engine damage off Ushan 29.10.06 The Nordic Association of Marine Insurers

Salvage case 1 - Voutakos Please be advised that during the vessel's voyage from Colombia to Rotterdam the vessel sustained major Main Engine breakdown at position Lat:48 - 07 N Long 07 - 58 W (abt 120 miles off Ushant). The vessel is loaded with 174,496.60 mt of cargo of ' Colombian Steam coal'. Efforts by the crew to repair the damage have been unsuccessful and the Master requested tug assistance. LOF 2000 has been signed with Tsavliris Salvage (International) Ltd. Towage commenced this morning. The Nordic Association of Marine Insurers

Salvage case 1 - Voutakos Voutakas, cont. Salvor contracted two commercial tugs Vessel towed to Rotterdam Salvor awarded MUSD 1.8 by Lloyds arbitration Out of pocket expenses MUSD 0.8 Award appealed – MUSD 2.7 Sent to High Court for ”disparity principle” Award kept – MUSD 2.7 The Nordic Association of Marine Insurers

Salvage case 2 – CSCL Hamburg CSCL Hamburg Grounding on coral reef in Egypt 31.12.2009 The Nordic Association of Marine Insurers

Salvage case 2 – CSCL Hamburg Value of vessel / cargo in damaged condition MUSD 25 Claim from Egyptian Authorities MUSD 14.5 11 days of negotiations – prior to refloating Final result MUSD 6 mill (+ P&I compensation for reef) Refloating in 12 minutes The Nordic Association of Marine Insurers

Salvage case 3 – DS Splendour Grounding in Orinoco river 01.03.2006 DS Splendour, Multi purpose/Dry cargo/Container carrier, 20742 Dwt, Loaded with 17330mt Aluminum products On her way from Puerto Ordaz to Veracruz, Mexico Three vessels formed a pilot assisted convoy, and were to pass through the dredged channel from mile 40 into the open sea in the Orinoco River Delta. DS Splendour was the first vessel. The Nordic Association of Marine Insurers

Salvage case 3 – DS Splendour Offer from commercial Salvor – LOF 2000 Offer from local tug company – lumpsum + bonus 4 days ligthering and refloating – USD 350,000,- Value of vessel and cargo – MUSD 35-40 Award with LOF 2000? The Nordic Association of Marine Insurers

Salvage case 4 – MS Nordlys 15th September 2011 – Fire in Engine room and flooding outside Ålesund. The Nordic Association of Marine Insurers

Salvage case 4 – MS Nordlys Issue: One company (BuBE) appointed by local fire brigade (IUA) BuBe contracted diving company Gard contracted specialists – SMIT Vessel was saved. All the above companies contributed in the salvage. Problem: all the above claimed that they were the «key» to salving the vessel. Salvage award to who and what proportion? The Nordic Association of Marine Insurers

Almost Salvage case 5 – Laden LNG Vessel drifting in Red Sea December 2013 The Nordic Association of Marine Insurers

Almost Salvage case 5 – Laden LNG, cont. Fixed offer received by Tug company A in Yanbu – USD 350,000 for assisting vessel. Very high price…. Fixed offer received from Tug company B in Jeddah – USD 1,500,000.- ….!! Tug offer A suddenly a bit more digestable… Fortunately vessel regained engine power, and no need for tug. Tug company A and B had the same owners… The Nordic Association of Marine Insurers

Finally - Salvage – general approach In a salvage situation: Close contact with Owners Appoint local representative Inform authorities Get the facts Degree of danger Weather Damage Commercial world – use it Stay calm - usually more time available than salvors want you to believe. The Nordic Association of Marine Insurers

The Nordic Association of Marine Insurers Thank you The Nordic Association of Marine Insurers