Overview of EmpowHR Performance Management Process 1.Supervisor creates performance plan 2.Reviewer concurs with plan 3.Supervisor reviews plan (slides.

Slides:



Advertisements
Similar presentations
Web Time Entry. – Logging on to Self Service – Accessing Self Service Web Time Sheet – Biweekly and Monthly web time entry – Temporary and Student web.
Advertisements

SAVE DRAFT PLAN then SAVE Final Plan. the SAVE DRAFT PLAN Button on the PERFORMANCE PLAN tab will save your Work if you are interrupted. This feature.
Cheryl Jelks Trainer/Applications Support Analyst Richland School District One.
Microsoft Expression Web-Illustrated Unit J: Creating Forms.
Office of Program Development and Funding Electronic Grants Management System Tutorial #1: Creating a Grant Application.
System for Administration, Training, and Educational Resources for NASA External Training Requests for Learners and Supervisors January 2007.
CPIT 102 CPIT 102 CHAPTER 1 COLLABORATING on DOCUMENTS.
Employees Set Up or Change “Forgot Your Password Help” And Work Address VIA “My System Profile” In EmpowHR Employees MUST set up their security question/answer.
Purchasing Goods and Services. Overview In this session you will learn how to utilize the eProcurement Module to create requisitions for purchasing goods.
Employee Self Service Benefits Open Enrollment Revised: 10/06/2009 October 12 – 30, 2009.
Three Phases & Work Flow of the Performance Management Process 1. Plan: 1.Supervisor Enters Non-Supervisory Plan or 1.Supervisor Enters Supervisory Plan.
Supervisor of Requesting Employee Reassigns Award to Supervisor of Recipient Employee For Review/Approval/Disapproval.
Requesting Name Change/Update VIA EmpowHR Employee Self-Service.
Supervisors Can Designate An Alternate to “Act In Lieu Of” them in EmpowHR for A specified period of time NOTE: Delegations should be to employees with.
Performance Management DEPARTMENT OF EDUCATION (ED) OFFICE OF MANAGEMENT (OM) Human Capital and Client Services (HCCS) ED PERFORMANCE APPRAISAL SYSTEM.
Using ITAMS as a Supervisor or ITAMS Approver Login to ITAMS as usual, at: Enter your User Identification Number (Same as your.
On-Campus Program How to upload your resume, bid for employer interviews and schedule an interview.
EmployeeS Verify/Enter/Update Address In EmpowHR Preparing for LincPass and Forgot Your Password Reminder Slide2Verify/Enter/Update Address.
Navigation instructions Begin the tutorial Creating the Performance Plan Performance Management System Tutorial for Managers Estimated Time to Complete:
1 EmpowHR Performance Management Process These Slides Cover Grades up to GS-15 SES handled separately.
Novus HR Application Review Process Human Resources Qualifying Applications HR Sending Applications to Department/Search CommitteeHR Sending Applications.
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Learners May 2006.
UNCLASSIFIED / FOUO Introducing the National Guard Performance Appraisal Application (PAA) This briefing is UNCLASSIFIED.
HR Runs Report Of Missing Performance Plans EmpowHR Reports Function.
Log on to the site using your User ID and Password and select journal and click “Log In” Click here to create a new account Click here to check the system.
Access Online Cardholder Transaction Approval Training 1 Client Logo.
Learner and Manager Roles Module 2 1. SLMS Primary Administrator Training Learner Tasks 2.
Environment, Health and Safety OARS Online Accident Reporting System A guide to the University of Calgary’s new web- based On-line Accident Reporting System.
HR Enters Quality Step Increase (QSI) Performance Based Award.
Microsoft Access 2010 Chapter 10 Administering a Database System.
System for Administration, Training, and Educational Resources for NASA External Training Requests for Users and Supervisors November 2009.
EPerformance Module 2 – Chapter 2. Preparing the employee’s appraisal For this training: 1.The employee has submitted his/her self-appraisal. 2.Colleagues.
UNCLASSIFIED / FOUO Introducing the National Guard Performance Appraisal Application (PAA) for Employee This briefing is UNCLASSIFIED.
Employee Reviews 5 Tier Performance Plan VIA Menu Options when action Cannot be accessed from the Work List NOTE: Only use the Menu options after you have.
Introducing the National Guard Performance Appraisal Application (PAA) This briefing is UNCLASSIFIED.
Employee Enters Group Time Off Award – EmpowHR ESS Version 9.0.
WGW update Aug FY-2007 EmpowHR Performance Summary Rating Process.
Office of Housing Choice Voucher Program Voucher Management System – VMS Version Released October 2011.
Securing and Sharing Workbooks Lesson 11. The Review Tab Microsoft Excel provides several layers of security and protection that enable you to control.
Employee Certifies Concurrence With Summary Rating Via EmpowHR.
Supervisor reviews comments The employee entered for the Progress Review via EmpowHR Version 9.0 Revised Notice PM-2677.
Supervisor Accesses Awards Via EmpowHR 9.0. Click on “internet explorer”.
Employee Enters Individual Quick Track Award (Old Spot)
Supervisor enters Progress Reviews EmpowHR Version Tier Performance System Revised Notice PM-2677.
Employee views 5 Tier Progress Review in EmpowHR Version 9.0 Revised Notice PM-2677.
Supervisor Creates Performance Plan for Employee via EmpowHR.
Employee Prints Record of Personnel Action (form SF 50 or SF 52)
The following slides provide guidance on updating/correcting OIP addresses through ICAMS.
Employee Certifies Concurrence With FY06 Summary Rating VIA EmpowHR.
PEOPLESOFT TIMESHEET – SUPERVISOR TRAINING KCTCS Payroll Jefferson Community & Technical College.
Reliance PPAP Application. Reliance - PPAP The PPAP application is designed to generate and track the entire Purchase Part Approval Process. Reliance.
Document Module Features Streamlines the control, routing and revision process for critical documents and records Controls documents in any format (Excel,
How to complete and submit a Final Report through Mobility Tool+ Technical guidelines Authentication, Completion and Submission 1 Antonia Gogaki IT Officer.
Supervisor enters SUMMARY RATING in EmpowHR For Employees Under the 5 Tier Performance System.
Employee Reviews 5 Tier Performance Plan Via EmpowHR Work List.
Supervisor Conducts Final Review of the 5 Tier Performance Plan Via Menu Options - EmpowHR NOTE: Only use the Menu option ONLY after you have verified.
1 Documenting Progress Reviews in EmpowHR Attachment F.
Performance Evaluations
E-Survey User Training
A Quick Start Guide to Online Ordering
Helping Yourself in PD2 SPS Spotlight Series July 2015.
Annual Performance Management Cycle Management Training Tutorial
Performance Review Tool Updates College of Engineering
Training Webinar: WIA/WIOA Contract Reporting Requirement
Conducting the performance appraisal
Conducting the performance appraisal
TRIP Trip is the new online process for UK travel.
PPS/OPTRS Departmental Roles Structure System
Online Training Course
Performance Management System Workflow
Presentation transcript:

Overview of EmpowHR Performance Management Process 1.Supervisor creates performance plan 2.Reviewer concurs with plan 3.Supervisor reviews plan (slides omitted) 4.Employee accepts plan 5.Supervisor tracks plans 6.Supervisor creates rating 7.Reviewer concurs with rating 8.Employee accepts, add comment to rating 9.Supervisor submits award request

Supervisor Creates A Performance Plan for via EmpowHR Refer to Handbook 5-PM

CAUTION! Things users need to know when using the “SAVE DRAFT PLAN” Button in EmpowHR: 1.If you plan to copy the previous plan, you must click the “COPY button BEFORE you ever click the “SAVE DRAFT PLAN” button. After you click the “save draft plan” button, the copy button won’t work 2.Each time you click the “SAVE DRAFT PLAN” button, the “finalized plan” option becomes grayed out and you are not able to access it to finalize the plan. To re-activate the “finalized plan” box you can either: - take an action to insert a new element in the plan, delete an element from the plan, etc. - sign out and sign back in under “existing plan”

In this example, the supervisor Is: creating a new plan for a subordinate Non-supervisor employee using the “Copy Previous Plan” feature. making a change to incorporate the EEO-CR requirement into another critical element rather than having EEO-CR as a separate element. revising some standards adding a new element

Select “internet explorer”

Enter the URL:

Enter your EmpowHR user ID And password and click the “sign in” button.

Select “Manager Self Service”

Select “Tasks”

Select “Performance”

Select “Performance Plan”

Select “New Plan”

Enter the date the appraisal period starts or the date first began supervising this employee and then click the “Add” button. NOTE: For employees Working prior to October 1, the date should be 10/01/2009. For employees hired after October 1, enter their date of employment as the starting date.

1. Review dates for accuracy. Click on the search icon to select the rating scale or you Can type in “H” for 5 tier performance.

Select “H 5 Tier Performance”

Periodically click the SAVE DRAFT PLAN button to save your work because the system will system time out after 22 min of inactivity and loose your work. SAVE DRAFT PLAN button does not route the plan to the “Reviewer”. To route the plan to the Reviewer, click the “finalized plan” box then the “SAVE” button. The system will not let you print the plan until you click The “SAVE” button which sends the plan to the Reviewer. CAUTION: If you plan to copy your previous years plan, be sure to use the “copy previous plan” button BEFORE you use the “save draft plan” button.

NOTE: If you use the “save draft plan” button and exit the plan before completion, you will need to Access it again under “existing plan” when you sign back in (see slide 12). CAUTION: If you use the “save draft plan” button BEFORE you use the “copy previous plan” Button, you will not be able to use the “copy previous plan” button. You’ll have to enter each Element one at a time. If you wish to use the “copy” button on the elements & standards tab, you must do it before use of “save draft plan”.

After clicking the “save draft plan” button, the supervisor will receive a message that the plan is saved in draft form. Click OK

The “COPY PLAN FROM PREVIOUS” button allows the supervisor to copy last year’s plan then enter changes as necessary. If the prior year plan includes the same elements and many of the same standards, it will be more efficient for you to use this feature. We will use the “copy plan from previous” for this example. Click the Elements and Standards tab

To see all of the elements and standard on one screen, click “View All” then review and modify the elements and standards as necessary for the Current FY.

In this example, the separate EEO-CR element for the non-supervisor will be deleted and incorporated into the customer service element. Delete the element: Click on the “-” (minus sign) to delete the element. (The “+” sign adds a blank element) NOTE: All supervisors must have the required EEO-CR element As a separate element in the plan. (for supervisors, do not modify the title Of this element.)

Read the message and click “OK” And the element is deleted.

To incorporate the EEO-CR requirement into another critical element, locate the applicable critical element and insert the following language beneath the element description in the Standards box: “EEO-CR Element Description: Performs all duties in a manner that consistently demonstrates fairness, cooperation, and respect toward coworkers, office visitors, and all others in the performance of official business. Demonstrates an awareness of EO/CR policies and responsibilities of FSA and Departmental goals of valuing a diverse, yet unified workforce”. You may also cut and paste the text from the original EEO-CR element box.

After including the required EEO-CR element description, scroll down to add at least one EEO-CR standard. Leave the “accomplishments” box blank For now.

If you incorporate the EEO-CR requirement into another “critical” Element for the non-supervisor, you must include at least 1 EEO-CR standard.

Review the elements and standards in the plan and Ensure that all required elements and standards Are included in accordance with Handbook 5-PM. Add, delete, and/or revise the Standards in the standard box as Necessary.

If you need to add a new element to the plan, Click the “+” (plus) sign to insert a row. Per Handbook 5-PM, the minimum number of elements allowed in a Plan is 3 and the maximum number allowed is 7.

If the supervisor creates a new plan by selecting the New Plan button (see slide 12) instead of copying an Existing plan using “Copy Plan from Previous”, the elements and standards will be blank For non-supervisor or will automatically include the EEO-CR element for a supervisor. Click the “+” plus button to add space for new elements

To add a new element: click the “+” plus button. When adding a new element to the plan, you must Select the applicable “critical indicator” Click the search icon located next to “pick element” to select the applicable element.

Click on the element that you wish to add to the plan from the available list.

After adding a new element, the default text is added. You must enter at least 3 standards for measuring the element.

When you have completed the employee’s Performance plan, select the “performance plan” Tab.

1.If you are ready to call the plan complete, click in the box next to “finalized plan” 2.Click the “Save” button. This will save the Plan and route it to the Reviewer/your supervisor For concurrence

1. After clicking “SAVE” the system automatically Enters the date finalized 3.Click the “return to employee list” link if you Have other plans to enter. 2. Click the “create printable form” button to print the plan

After Finalizing and Saving The Plan, it Will Flow To your supervisor, the Reviewer, Who Will Receive An Notification.