Safe Rigging Principles And Requirements - 00059147- Rev.4 Safety Training Training and Development Attachment 1 BFNPER 155668, Reactor Bldg. Crane Main.

Slides:



Advertisements
Similar presentations
Working Around/Under Loads
Advertisements

Lockout/Tagout Awareness Training
Tower Crane Safety Regulations
F&T Inc. OVERHEAD CRANE SAFETY.
Lockout/Tagout Training: 29 CFR Lockout Tagout Standard
My Life Monday What do you know about overhead crane safety? Overhead crane safety may not be relevant to all staff but dont you think it would be interesting.
Ceiling Lift Inservice. WE’RE THE COMPANY THAT BRINGS YOU… Ceiling Lifts.
Subpart R Steel Erection
Pulleys Vanderbilt Student Volunteers for Science Fall, 2010 Training Refresher.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Introduction Most accidents are caused by the uncontrolled release of hazardous energy. Many of these accidents can be prevented by proper lock-out/tag-out.
Crane Operations Objective
Copyright  Business & Legal Reports, Inc. BLR’s Safety Training Presentations Cranes and Slings 29 CFR and 184.
Crane Safety, Subpart N
Crane and Hoist Training
Cranes, Hoists and Truck Hoists
Safety : Cranes Introduction to Industrial Technology Spring 2014 Mr. Shubert 1.
Cranes, Derricks, Hoists, Elevators, & Conveyors for Construction
Crane & Hoist Training & Inspection Requirements Crane Safety.
THE INTERNATIONAL SOCIETY OF FIRE SERVICE INSTRUCTORS Electronic INSTRUCT-O-GRAM Program Lockout / Tagout Policy.
CRANE TIP OVER Date: May 12 th, INCIDENT A galloway was being pre-assembled to determine proper fit. It was then to be disassembled and sent underground.
Construction Safety Council. by David G. Allie Subpart R - Steel Erection ( ) Tiered buildings not adaptable to temporary floors - Safety.
Rigging Requirements Part L “Cranes” and Part F-1 “NOT CRANES” Construction Safety Standard WAC Brad Solheim Department of Labor & Industries Crane.
NWACC Business & Industry Workforce Development Institute N - 1 OSHA 29CFR FORKLIFT SAFETY OSHA TRAINING.
Material Handling & Lifting Resource
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
Cranes and Slings 29 CFR and 184
Turbine Crane CRANES TURBINE NEA39. Turbine Crane PLANT STATUS! PV Daily Status Report.
CONTROL OF HAZARDOUS ENERGY. Types of Energy To Be Controlled  Kinetic – Energy of motion  Potential – Energy of position  Electrical – From generated.
Firearm Safety and Safe Range Operation
Electricity Compressed Air Steam Hydraulic Pressure Gas Lines etc.
Material Handling Events Performance Analysis Group June 30, 2014.
MNM Fatal Powered Haulage Accident Powered Haulage Accident October 24, 2012 (Nebraska) October 24, 2012 (Nebraska) Underground Crushed Stone Operation.
Powered Industrial Truck 29 CFR Part How to Comply.
Sling Load Capacity and Sling Angles
EliminationSubstitutionEngineeringAdministrationPPE Workplace Health & Safety.
FRONT END LOADER SAFETY
10 steps to Safe Lifting.
SKID STEER SAFETY. SKID STEERS Pre-operation checklist Maintenance Safe operation Entering and exiting safely.
PERFORM THE TASKS AND FULFILL THE RESPONSIBILITIES OF RANGE PERSONNEL PO/EO: REF.: B-GL /TS-000, TRAINING SAFETY.
SAFE DIE HANDLING FOR STAMPING PRODUCTION OPERATIONS UAW-GM SAFE DIE HANDLING FOR STAMPING PRODUCTION OPERATIONS Copyright © UAW-GM Health & Safety.
Copyright © 2012 American Safety Management Inc. Crane and Hoist Safety.
Outline of Crane Operator Training For BMRC Labournet.
Topic 1.7 Aircraft Salvage Procedures
Working Around/Under Loads
UC Davis R. A. Wachter Safety Services
Who is Responsible for Overhead Crane and Hoist Operations
SAFE WORK INSTRUCTIONS
SEAMANSHIP Personal Safety
Jack and Hoist Safety.
Safe Rigging Practices
SAFE WORK INSTRUCTIONS
Crane safety and inspections
SAFE WORK INSTRUCTIONS
Limit Switches What are some different types of limit switches?
Overhead and mobile crane safety
SAFE WORK INSTRUCTIONS
SAFE WORK INSTRUCTIONS
SAFE WORK INSTRUCTIONS
Crane safety and inspections
SAFE WORK INSTRUCTIONS
F&T Inc. OVERHEAD CRANE SAFETY.
SAFE WORK INSTRUCTIONS
Cranes, Hoists and Truck Hoists
SAFE WORK INSTRUCTIONS
Crane safety and inspections
Crane safety and inspections
Drilling and Blasting Toolbox Talk : 02 Updated Aug 2014
Cranes and Hoists Standard 29 CFR Part
Compressor Operating Instructions
Presentation transcript:

Safe Rigging Principles And Requirements Rev.4 Safety Training Training and Development Attachment 1 BFNPER , Reactor Bldg. Crane Main Hoist Brake Study Page1of4

Safe Rigging Principles And Requirements Rev.4 Safety Training Training and Development Attachment 1 BFNPER , Reactor Bldg. Crane Main Hoist Brake Study Introduction: BFNPER155668, During U1C7 outage, when the vessel head was raised approximately 4 inches off the vessel flange, the lift was stopped to verify a level rig to prevent binding on the guide caps or thread protectors. During this level check, the head slowly lowered back down to the reactor vessel flange. This slow lowering of the head was not observed by any of the riggers associated with the lift. After a short discussion between the Person in Charge (established per MMTP-103), the Flagman and the Crane Operator, a decision was made to lift the head again. The Refuel Floor Supervisor / Task Manager and the Refuel Floor SRO were not informed or consulted. It is important to note that the only personnel with the proper vantage point to see that the head had slowly lowered were the Person In Charge and the two craft personnel checking the head level. The vessel head was lifted a second time to approximately 4 inches and, again, the head slowly lowered back to the vessel flange. The lift was secured and the Refuel Floor Supervisor / Task Manager and the Refuel Floor SRO were informed. The Refuel Floor SRO reported that the reactor building crane main hoist brake is slipping (10/27/ :10) and declared the reactor building crane inoperable. WO was used to troubleshoot the crane and PER was initiated. The troubleshooting revealed the reactor building crane main hoist brake was out of adjustment. The brake was adjusted and retested satisfactory in accordance with MPI CRA001, Reactor Building Overhead Crane Inspection, Testing and Preventative Maintenance. The Unit 1 Reactor Pressure Vessel Head was then successfully rigged to the refueling floor. Interviews with the personnel assigned as the Refuel Floor Supervisor / Task Manager revealed that, if consulted, they would have made the same decision as the Person in Charge to lift the head again. Industry Event: SER 2-85, Similar incident at San Onofre Unit 2, during the refueling sequence for reactor vessel head removal, an attempted lift of the reactor vessel head with the polar crane resulted in an unanticipated head lowering of about one inch to the seated position. This lowering was caused by malfunctioning components in the crane control circuit. About fifteen seconds after reenergizing the crane, the operator started to lift the head. When he operated the controls to raise the head, it descended about one inch and came to rest in its normal position on the reactor vessel. The operator then pushed the emergency stop button to stop all crane motion. He then tried the unloaded auxiliary hook, and it exhibited the same downward travel when subjected to an "up hoist" command. Page2of4

Safe Rigging Principles And Requirements Rev.4 Safety Training Training and Development Attachment 1 BFNPER , Reactor Bldg. Crane Main Hoist Brake Study Training: Courses MTS , Rigging Fundamentals, MTS , Pendant Crane Training, and MTS , Overhead Crane Operator Training, teach trainees that when rigging a load to hold the load for a period of time after picking it up a few inches to test the brake to ensure the brake will hold. This is especially relevant if the load weight is close to the capacity of the hoisting device. Procedures Changes: MSI LFT001, Rev. 49 Since procedure was lacking instructional detail for testing the crane brake when making a lift, the following was added to procedure Precautions/Limitations. Section 3.0 N. When performing a lift, if a crane abnormality or unknown malfunction is encountered the following minimum requirements apply prior to continued operation (this includes continued operation for troubleshooting purposes): 1.Place the load in a safe condition. Consult with Supervision if necessary to determine the safe condition. 2.Inform Supervision. 3.Perform crane safety checks in accordance with applicable procedures. O. The Crane Operator shall test the brakes each time a load equal to or greater than 90% of the cranes rated capacity is handled. The brakes shall be tested by raising the load a few inches and applying the hoist brakes to ensure the load is held. EPI CRA009, Rev.10 The following changes were made to the Electrical annual inspection procedure for the Reactor Building Crane: As-Found, As-Left Tables were for Main & Aux. Hoist Electric Brakes and added signoffs for 1st/2nd party. Page3of4

Safe Rigging Principles And Requirements Rev.4 Safety Training Training and Development Attachment 1 BFNPER , Reactor Bldg. Crane Main Hoist Brake Study Summary: (During U1C7) After lifting the U1 RPV head was lifted approximately 4" above the vessel flange to check leveling, the RPV head slowly drifted back down onto the vessel flange. After two sequential lift attempts troubleshooting revealed that the reactor building crane main hoist magnetic brake coil air gap was out of tolerance. The air gap was reset per brake vendor nameplate, the brake tension was re-tested and the crane was returned to service. Involved personnel continued making the lift twice more and wrote a troubleshooting work order. Focus Area: What mistake(s) was made? What should have been done at the first lift? When should the notifications have been made? What consequences could have taken place? What would have been the conservative action to take in this situation? Expectations for future Crane Operations: When performing a lift, if a crane abnormality or unknown malfunction is encountered, always use conservative decision making and apply the following minimum requirements prior to continued operation (this includes continued operation for troubleshooting purposes): STOP the lifting activity and PLACE the load in a safe condition. Consult with Supervision if necessary to determine the safe condition. INFORM Supervision of the problem. PERFORM crane safety checks in accordance with applicable procedures. - performed by qualified Crane Personnel Remember to Stop When Unsure Page4of4 Click on icon To return to