M.Oriunno/ D.Druzhkin Situation du projet collier pour préparation du 'Work Package' en Iran prepared by : M. Oriunno &

Slides:



Advertisements
Similar presentations
Radiation Levels in ALICE Andreas Morsch Meeting on ALICE Radiation Tolerance 30/8/2004.
Advertisements

Automated system for control of freight flows. Advantage of the system High accuracy of weight measuring The maximum precise information about material.
Hall D Photon Beam Simulation and Rates Part 1: photon beam line Part 2: tagger Richard Jones, University of Connecticut Hall D Beam Line and Tagger Review.
Status of the Tagger Hall Background Simulation Simulation A. Somov, Jefferson Lab Hall-D Collaboration Meeting, University of Regina September
Mechanical Status of ECAL Marc Anduze – 30/10/06.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
ANALYSIS OF COLLECTION SYSTEMS -Must be optimized to save collection time and costs. -Important to determine vehicle and labor requirements -Activities.
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
1 MUON UPGRADE: ME0 GMM All engineering drawings from Sasha Surkhov PRELIMINARY !!
The forward detectors of CMS Experiment at LHC Bolek Wyslouch MIT
CD meeting R.Yamada1 Thoughts on 4CD (4 th Concept Detector) Solenoid System based on Alex Mikhailchenko’s Basic Design Ryuji Yamada October 20,
Tracker Support Tube Tracker EDR November 15th/16th 2000 M.Oriunno CERN/EP Tracker Support Tube Marco Oriunno CERN/EP Division on behalf of Tracker Integration.
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
Ken YoussefiMechanical Engineering Dept. 1 Design Optimization Optimization is a component of design process The design of systems can be formulated as.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
Tertiary Collimators in IP1/IP5 LARP Collaboration Meeting Pheasant Run, St. Charles, IL October 5-6, 2005 Fermilab LARP Collaboration Nikolai Mokhov,
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
Preparing for the SiD LoI SiD Parallel Session TILC08 March 5, 2008 John Jaros.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
SiD IR & MDI Engineering Progress Prelude to a Discussion of Integration with ILD and Based on Marco Oriunno’s Jan 2008 Talk at SiD CM Tom Markiewicz/SLAC.
S. Belogurov, ITEP, Moscow CBM Collaboration meeting, Split, CBM beam pipe and integration inside the Magnet Status report Sergey Belogurov,
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
EDR of the TOTEM Roman Pots - CERN - 24 November 2005 Beniamino Di Girolamo - CERN PH/ATT ATLAS Roman Pots at IR1 Beniamino Di Girolamo CERN.
1 SiD Push-pull Plans Marco Oriunno, SLAC International Workshop on Linear Colliders 2010 Geneva, October 2010 M.Oriunno, IWLC10 – Geneva, Oct.2010.
HBD CDR Gas System and Monitoring Craig Woody BNL DC Upgrades/EC Meeting March 9, 2005.
Shield Module Design Considerations Adam Carroll Van Graves July 3, 2014.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
Kapton module ass. Spacers for pins 3.6 m m 1.25 mm.
Finite-Element Analysis
8/12/2010Dominik Dannheim, Lucie Linssen1 Conceptual layout drawings of the CLIC vertex detector and First engineering studies of a pixel access/insertion.
1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
Hcal Geometry and Assembly Videoconference January 2008, 24th.
HL-LHC Meeting, November 2013D2 Status and Plans – G. Sabbi 1 D2 Conceptual Design Status and Next Steps G. Sabbi, X. Wang High Luminosity LHC Annual Meeting.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
Thermal screen of the cryostat Presented by Evgeny Koshurnikov, GSI, Darmstadt September 8, 2015 Joint Institute for Nuclear Research (Dubna)
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Integration of forward physics detectors into the LSS of the LHC D. Macina (TS/LEA) Technical Support 2004 Workshop.
CMS Luminosity Status Report
CMS GEM services: Cooling
Some Updates on Mechanics CM-MEC Session Dec J. Lühning, GSI
Technical Coordination Parallel Session November 2011, FNAL
BALANCING CHEMICAL EQUATIONS
Hcal Geometry and Assembly
CLAS12 Beamline Configurations
INSTALLATION SEQUENCE
T1 status (a selection from EDR presentations)
Components for the Machine-Interface Regions
Update of experimental hall in Japanese mountain site
Layout Drawings and Mechanical Assembly Drawings
Vacuum chamber for the CMS forward region
Development of models: FEM and Analytical
Chamber Design and Integration RE3/1 and RE4/1
Superattenuator for LF and HF interferometers
Upgrade Strategy for the Experimental Vacuum Systems
Load Balancing: List Scheduling
Torque and Statics And you.
Interaction Region Design Options e+e- Factories Workshop
What is the periodic table of elements?
Histograms Example The table shows the weights of employees in a factory. Draw a histogram to represent these results. Weight (kg) Frequency 40 – 70 3.
Endstation Systems, Installation Costs and Schedule J. Hastings
Load Balancing: List Scheduling
Presentation transcript:

M.Oriunno/ D.Druzhkin Situation du projet collier pour préparation du 'Work Package' en Iran prepared by : M. Oriunno & D. Druzhkin

M.Oriunno/ D.Druzhkin Shielding:Final optimization: April 03 thin pipe m good for pp with no CASTOR (vac to be checked) “CASTOR” T2 Respect max torque on RS hinges Equalize load on HF jacks

M.Oriunno/ D.Druzhkin HF Weight Break down (HF EDR): HF = 215 t Table = 25 t Risers = 18 x 3 t Mini Racks = x 4 t TOTEM Platform = 5 t Grand Total = 300 t Va Vb Collar Weights Collar2 x 4395 Kg Table1 x 2450 (1 x 4550 with CASTOR) Kg Platform1 x 5100 Kg Grand Total18440 Kg < 20 tons Constraints on the max. loads on the jacks

M.Oriunno/ D.Druzhkin Final optimization: April 03 Neutron (E>100keV) flux maps (Mika Huhtinen) -as good as before, but with thin beampipe. -better balanced along z. (no particular weak-point) OK for pp < ~ cm 2 s -1 pp cm -2 s -1

M.Oriunno/ D.Druzhkin Update of the parameters

M.Oriunno/ D.Druzhkin Update of Parameters

M.Oriunno/ D.Druzhkin Update of Parameters

M.Oriunno/ D.Druzhkin The Conceptual Design Collar Shielding independent from Vacuum Cahmber/T2/CASTOR/BCMs Possibility to stage the detectors/services independently Minimal system : Collar shielding close around the vacuum chamber Full occupancy system : T2/CASTOR/BCM  MODULAR SYSTEM

M.Oriunno/ D.Druzhkin The evolution T2 GEM CASTOR Table Collar Once upon in a time a shielding ……. …today a CMS region with an high density of detectors, monitors and services !

M.Oriunno/ D.Druzhkin Table of Collar with sliding mechanisms Manual mechanism for CASTOR Opening CASTOR cradle

M.Oriunno/ D.Druzhkin Table of Collar with CASTOR, BCM2 and the T2 sliding mechanism

M.Oriunno/ D.Druzhkin Detailed Drawings

M.Oriunno/ D.Druzhkin Detail drawing half collar

M.Oriunno/ D.Druzhkin Detailed drawing Collar Table

M.Oriunno/ D.Druzhkin Collar table study

M.Oriunno/ D.Druzhkin The platform for the collar shielding

M.Oriunno/ D.Druzhkin

M.Oriunno/ D.Druzhkin Finite Element Analysis Weights Collar2 x 4395 Kg Table1 x 2450 (1 x 4550 with CASTOR) Kg Platform1 x 5100 Kg Grand Total18440 Kg < 20 tons