EZ Breathe Ventilation System Installation. Once the most optimal location for the EZ Breathe unit has been identified, drill a pilot hole from the inside.

Slides:



Advertisements
Similar presentations
Thule Smart RV™ Pod Kit Installation For Smooth-Sided Fiberglass RVs
Advertisements

Sectional Assembly and Installation
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Drills & Drilling Drills & Drilling.
Commissioning & Operation Manual This document outlines the procedure to commission the mepBLITz DC-i5 and also an illustrated step by step operation guide.
Service Technician Training
INSTALLATION OF A BIOTIZER ® DISPENSER. TOOLS AND HARDWARE NEEDED FOR AN EASY INSTALLATION ► Cordless, variable speed drill motor ► Drill bit depending.
Installation. Indoor Unit Installation Typical Installation.
Cutting With a Jeweler’s Saw
Welcome to Hardie 101 Basic Training
Electrical Wiring Circuit Board Project. STEP 1 - Identify all Parts of the Project Saw Drill Driver w/ bits Drill w/bits (not pictured) #2 Phillips Screwdriver.
ICRA Panel System Installation Instructions
Re-caulking a bowfront aquarium By Jackie O’Neil.
Typical Walk-in Closet with elfa® décor
DR-2000 Customer Benefits Security; Tamper resistant programming protects your customer and you! Low maintenance, long battery life & long squeeze tube.
Supermicro © 2009Confidential MCP N installation guide Rech Weng.
TrueSTEAM™ Humidification Systems Module 3: Basic Installation.
Stable Rise –Pull and Swivel Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – July 2012eere.energy.gov Moisture Barriers WEATHERIZATION INSTALLER/TECHNICIAN FUNDAMENTALS.
清华阳光 TSINGHUA SOLAR JB Series Solar Water Heater Assembly Manual Tsinghua Solar Ltd. Yangfang County, Changping District, Beijing, , China Tele:
Drywall Installation.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
SANUS SYSTEMS THE UNION OF FORM AND FUNCTION Sanus Systems 2221 Hwy 36 West. St. Paul, MN
Installation. Indoor Unit Installation Typical Installation.
Chapter 4: Air Leakage Control: Materials and Techniques
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Chapter 11, Section 3. Interior Installation Installing a curtain rod Mounting Venetian blinds Mounting a window shade Hanging a picture.
2006 Hand and Power Tool Safety Basic Rules for Rube Goldberg Competition,
Installation. Indoor Unit Installation Typical Installation.
Mark a line at the center of the canvas for its entire length. Place frame on a table or saw horses, bottom up.
How to Build Your Playhouse. September 08, 2006 By Kay Adams, Tamecha Buck, Janet Herron & Lisa Weston “Click on pictures”
General Instructions for “KidWind Light” wind tunnel.
Wire and spinning magnets Reference: Original Authur: William Beaty 1996.
Residential Construction Unit 4- Window and Doors Mr. Todzia.
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Plumbing Theory. DWV System The DWV Drain-waste- vent system in plumbing a system that removes sewage and greywater from the house/building and it also.
Part 1: Types & OptionsPart 1 Part 2: The Drill PressPart 2: The Drill Press DRILL SAFETY.
Installing a single Dreamscreen Set unit in place and attach with 2 ½ “ screw. Do not tighten the screw yet, tighten just enough to keep from falling.
How to Build a Divider Wall By Charysse Roberson.
Installing Hinges Created By M.Martin 9/05. Mark the hinge position on the door edge 150mm from the top of the door and 225mm from the bottom of the door.
Ziplock Container and 2L Bottle System. Bill of Materials –3 screw top Ziplock Containers –3 empty 2L soda bottles –Aquarium tubing –Aquarium pump –4.
Unico Tips and Tricks. First Steps Layout and material list to be done by the salesman Wear Hospital Style Booties, if working in a non-drop cloth area.
Installing A Bathroom Shower Panel American Bath Enterprises, Inc. The Bath Tub & Shower Enclosure Innovators!
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
COMPONENT IDENTIFICATION AND INSTALLATION GUIDELINES FLOODBREAK, AUTOGATE FloodBreak, L.L.C Post Oak Blvd., Suite 5850 Houston, Texas
Section 2 Safety, Tools and Equipment, Shop Practices Unit 6: Fasteners.
Lighten Up! Single Window Kits Add Light and Appeal To Home Bathrooms.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Rotating Compost Barrel Construction
Assembly of steering.
VIEW SERIES with Sliding Door
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
Installation Walkthrough Image Guide
Blue Access Technologies
INSTALLING BYRNE POWER BOX INTO FLEX SYSTEM
Canta Open Canal Manufacturing Procedure
Electrical Wiring Circuit Board Project
Uni-Vent Eagle A Basic Set-Up Guide November 9, 2009.
2.2 Gallon TourTank Installation
Step-by-step assembly instructions
Louisiana Tech University
Assembly instructions for M-K all bolt together hoppercone kit.
Step-by-step assembly instructions
Step-by-Step Assembly Instructions – Cube Version
Countertop Renovation
Step-by-step assembly instructions
Fin & Countertop Sample Kit Instructions
Step-by-step assembly instructions
Building an Experiment Cart
Presentation transcript:

EZ Breathe Ventilation System Installation

Once the most optimal location for the EZ Breathe unit has been identified, drill a pilot hole from the inside straight through to the outside of the house.

Pilot hole from the inside straight through to the outside of the house.

Line up the pilot hole with the pilot bit on the 6” hole saw. Score the hole first in reverse, slow speed (this will keep the hole saw from skipping on siding). Once through siding put drill in forward mode and drill 6” hole.

6” hole as seen from outside

From the inside, line up the pilot hole with the pilot bit on the 6” hole saw. Score the hole first in reverse, slow speed (this will keep the hole saw from skipping on drywall). Once through drywall put drill in forward mode and continue to drill 6” hole. This step is only necessary when installing in a finished space. When installing through a faceplate / rimjoist, the 6” hole can be drilled entirely from the outside.

6” hole as seen from the inside.

Put outside vent cover onto metal tube/collar and insert into 6” hole to measure collar to see if the metal tube/collar needs to be trimmed.

Metal tube/collar as seen from inside. Line up with the back of the unit to ensure proper length. In some cases the metal tube/collar may need to be trimmed to proper length.

Once proper length of the metal tube/collar as been established, mount the vent to the outside of the house utilizing 4, 1 1/4” screws that come in the bag with the vent cover.

Once the vent has been mounted, seal the seam between the vent cover and outside wall with a silicone caulk. Smooth the caulk with either a latex gloved finger or a wet paintbrush.

Back inside, attach the back of the cone to the metal tube/collar.

Attach EZ Breathe unit to the inside wall utilizing the provided screws through the holes in the flanges of the mounting brackets. The holes in the flanges can be used to drill holes for wall anchors and screws as needed, based on the material of the wall.

Once the EZ Breathe unit has been mounted, seal the seam between the metal tube / collar and the inside wall with a silicone caulk. Smooth the caulk with either a latex gloved finger or a wet paintbrush for a nice finished look.

Finished installation. Please note that the area is left cleaner than it was when we arrived. Be sure to wipe up and/or shop vac any left over residue from installation process.

Place the humidistat at 35%-45% and fan speed between medium and high to ensure proper ventilation. Go over the owners manual with the homeowner, highlighting the blue warranty card. Have homeowner sign the completion certificate and make note of current humidity readings as well as condition of the home. (see completion certificate)