M760 TOWER CRANES ERECTION

Slides:



Advertisements
Similar presentations
35 FOOT LADDER 3 PERSON.
Advertisements

© Columbus JACK Corp Axle Jack Model PR Columbus JACK /Regent “The Strength of Experience”
Tower Crane Safety Regulations
Boom Lift and Scissor Lift UNIVERSAL STUDIOS
VERSATILITY The compact size and lightweight of the BIGMAX TC crane makes it useful in many different applications. Especially where space may be limited.
Chapter 6 Cranes Crane Operation • Industrial Cranes • Mobile Cranes • Crane Inspections.
Common workplace hazards
Excavating and Lifting Part 3
Heavy Concrete Construction Formwork
Present Procedure for cutting stuck casing on Drilling PLATFORM
Fluid Power Hydraulic Cylinders
§ – Subpart L Oklahoma State University2.
Loading and Transporting Logs Section K of the logging code.
Subpart R Steel Erection
How Hydraulic Tank Jack Works. 12MT Hydraulic Tank Jacks Tank Foundation 2.
Bob cat Skid steer loader
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
Xxxxxxxxxx TXD. TXD Design Goals Alternative to a “Big-Rig” Shallow oil/gas and CBM applications Handle range 3 casing Quick and easy set-up and breakdown.
APPLICATIONS: WHENEVER IT IS NOT POSSIBLE TO INSTALL A RAIL SYSTEM DIRECTLY ABOVE A WORK AREA, AN ARTICULATING ARM IS A SOLUTION ARTICULATING ARMS PROVIDE.
Hydraulic Safety Colorado Mine Safety Training Program John Barton CMSP.
CHAPTER 14 LADDERS Copyright© Delmar is a division of Thomson Learning.
Ladders Skill Drills.
CHAPTER 14 Copyright © 2007 Thomson Delmar Learning 14.1 Ladders.
Crane and Hoist Training
Excavating and Lifting Part 3
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Cargo Gear Survey … …………………......……………... ILO 32 ………………….…..……………………………. ILO ………………………………... TNS 15 Regulations.
FVCC Fire Rescue LADDERS.
CVFD Training – Ladder Practices SFFMA Training Objectives –
General idea of a couple of check rod system and adjustments
Aerial Apparatus Operator Types and Construction of Aerial Apparatus.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
NGfL CYMRU GCaD ACCESS EQUIPMENT.
Construction Safety Council. by David G. Allie Subpart R - Steel Erection ( ) Tiered buildings not adaptable to temporary floors - Safety.
Rigging Requirements Part L “Cranes” and Part F-1 “NOT CRANES” Construction Safety Standard WAC Brad Solheim Department of Labor & Industries Crane.
Grove GTK1100 Telescopic Tower Crane December 15, 2007.
Outcome 5 Safety requirements for using access equipment Unit 201: Health and safety in building services engineering.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
12 Ladders Skill Drills. 2 Objectives Perform one-, two-, three- and four-FF carries. Perform one-, two-, three- and four-FF raises. Tie the halyard.
Towers. Why worry too much about the tower? Would you put a solar collector in the shade? Wind is the fuel! Remember, 30’ above anything w/in 500’ Measure.
Floor Jacks and Stands Harkness Career Center. Floor Jacks Parts Identification.
The Grove GTK1100 Crane arrives in a field in Germany carried on four trailers.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Forward & Aft Searchlight Operate Forward & Aft Searchlight.
ALOKRAJ. V - NA07B004. General All deck machinery and construction equipment are to be supplied and installed to meet classification, intended operational.
Aerial Lift Safety Today, we’re going to talk about aerial lift safety. You may know this type of equipment by commonly used names such as “cherry pickers”
Goddard Sailing Association Hunter 27 Cruiser Qualification Course 1.
Climbing jack Operating sequences. Lifting sequence.
Crane Hire and Rental Services 
Crane, Conveyor, and Rigging Part I - Crane OSHE 112, Spring 2016
30’ Wireless Mast – Self Install
Roofing fall protection
Visit us online at Crane Truck Sydney Services By DELTA TRANSPORT.
Activity 1.2.5a Mechanical Efficiency
SX1 manipulation VERSION 1 Version
Escalator Installation
Activity 1.2.5a Mechanical Efficiency
Activity 1.2.5a Mechanical Efficiency Winch Construction Guide
Activity 1.2.5a Mechanical Efficiency
FVCC Fire Rescue LADDERS PART B.
Activity 1.2.5a Mechanical Efficiency Winch Construction Guide
§ SUBPART L SCAFFOLDS 1.
Suryoday Technologies ISO 9001:2015 Co.
ACCESS EQUIPMENT.
Cranes and Hoists Standard 29 CFR Part
LIFT,ESCALATOR AND MOVING WALKS
North Carolina Fire & Rescue Commission Ladders I Updated 9/2011
Mobile Elevated Work Platform
Presentation transcript:

M760 TOWER CRANES ERECTION Presented By: FAVELLE FAVCO CRANES (USA) INC. 2006

OPERATING PROCEDURES STARTER LEG PREPARED FOUNDATION TYPICAL STARTER LEG STEP 1: Starter Legs casted into prepared foundation.

STEP 2: Bottom Climbing section connected to starter legs. TOWER SECTION OR BOTTOM CLIMBING SECTION (FOR INTERNAL CLIMBING) STEP 2: Bottom Climbing section connected to starter legs.

STEP 3: Tower put up to the required height REFER TO MANUFACTURER FOR TOWER HEIGHT STEP 3: Tower put up to the required height

CONTROL CABIN & SUPPORT 1,434 kg (3,161 lb) MACHINERY DECK FRONT, SLEW RING & SLEW DRIVE 10,200 kg (22,487 lb) MACHINERY DECK BACK 8,650 kg (19,070 LB) SLEW MOUNT 5,310 kg (11,706 lb) STEP 4: Installation of the crane upper section

STEP 5: Assemble Winch, Powerpack & Counterweights 24,495 kg (54,000 lb) FLY WINCH ASSEMBLY 5,019 kg (11,064 lb) COUNTERWEIGHTS 65,000 kg (143,300 lb) STEP 5: Assemble Winch, Powerpack & Counterweights

STEP 6: Assembly of the Mast PLATFORM MAST BOOM BUFFER MAST LADDER MAST ASSEMBLY Total Weight 8,842 kg (19,493 lb) STEP 6: Assembly of the Mast

FFC STEP 7: Boom Assembly MOBILE CRANE Boom Length Weight m (ft) kg (lb) 55.2 (180.1) 4,133 (9,109) 50.6 (166.0) 3,930 (8,662) 46.0 (150.9) 3,500 (7,714) 36.8 (120.7) 2,867 (6,319) 32.2 (105.6) 2,664 (5,871) 27.6 (90.6) 2,234 (4,924)   FFC STEP 7: Boom Assembly

STEP 8: The luff rope is reeved FFC

STEP 9: Hoist Rope and hook assembly. DOUBLE FALL /SINGLE FALL HOOK STEP 9: Hoist Rope and hook assembly.

STEP 10: Access Ladders Assembly

STEP 11: Machinery Deck Handrail Assembly

Internal Climbing 3-Beam Telescopic Internal Sections of beam B are extended at both ends and are supported on the building. The telescopic sections of beams A and C are retracted. Crane, tower and climbing frame, to which beams A and C are attached, are lifted by hydraulic rams. Telescopic sections of beams A and C are extended to support the crane. Telescopic sections of beam B are retracted. Hydraulic cylinders lift beam B to the level of beams A and C. Telescopic sections of beam B are extended. CLIMBING

Internal Ladder Climbing Install climbing collars and ladder. Balance the crane upper, remove the base bolts and raise the crane, using hydraulic rams, allowing the climbing supports to skid past and then rest on a ladder rung. Climb the ladder in this manner. Climb through the first collar allow the crane supports to rest on the collar. Engage collar chocks to support the crane laterally. Move the ladder to the second collar and install a third collar.

External Climbing Frame Crane lifts additional tower section and suspends it from extendable monorail. Bolts of top tower section are removed at A. Hydraulic ram lifts top section of crane and climbing frame. Additional tower section is drawn into the climbing frame and bolted at B and A To climb down, the reverse procedure is followed.

Refuelling There are quite a few different procedures to refuel the crane. The suggested procedure is as described below: Hoist the fuel tank up until it is just above the cabin or higher to attain an appropriate fluid head to allow the fuel to flow. Luff in the boom until the refueling hose is close to the machinery deck so that the hose can be reached and obtained by the maintenance personnel. The hose is then inserted into the filler breather opening, and the fuel is allowed to flow into the tank. Check dipstick for tank level or level gauge if fitted. Reverse steps 1 – 3 to lower the empty refueling tank into the ground. Standard fuel tank support is available from the manufacturer. Fuel Tank Support (Optional)

Favelle Favco Cranes (USA) Inc. Manufacturing & USA Headquarters 26360 F.M 106 Harlingen Texas 78551 USA tel: (956) 428-7488 fax: (956) 428-7749 Email: sales@favcousa.com Visit our website at: www.favellefavco.com