Notes on beam pipe collars and support brackets for MSC 2012-07-05 Silber.

Slides:



Advertisements
Similar presentations
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
Advertisements

PHENIX & The Beam Pipe. 1)Overview of the drawings 2)I will break down the beam pipe going from MuID-S to MuID-N piece by piece. 3)Important Information.
C T A Camera Mechanics Rich Northrop University of Chicago 1 Design Review Argonne May 9, 2014 Final.
 What we're going to do is break up a circle into little pieces, and then reassemble it into a shape that we know the area formula for...  Maybe you're.
Reading Angles with Instruments ©2010 Dr. B. C. Paul Note – The techniques shown in these slides are considered common knowledge to surveyors. Figures.
Cable Channel tests ____________________________________________________________ 17/Apr/07 Pisa Group Four configurations of insulation has been tested.
Gauging Devices.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Aluminum/Titanium Comparison Aluminum alloy Titanium Alloy Property7075-T6 (ww-T-700) drawn tubing7075-T6; 7075-T651Grade 5 Ti6Al4V% Different SourceCasing.xlsMatweb.
Shaft Alignment Nizwa College of Technology.
PSB dump endoscopy 30 th May 2013 Alba Sarrió on behalf of EN-STI-TCD Thanks to Pascal Mesenge (EN-MME)
Geometry Volume of Prisms and Cylinders. 9/11/2015 Goals Find the volume of prisms. Find the volume of cylinders. Solve problems using volume.
Unit 91 Week 13 Jon Gutierrez, Chris Sauer, Simon Radomski, Chat Huynh, Jeff Burton, & Robert Platt November 12, 2008 Prototype Review Week 2.
Overview of AMS-02 Changes due the addition of the Permanent Magnet
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
Special Products of Binomials
ATLAS Calorimeter Argon Gap Convection Test Bed Brian Cuerden 24 Apr
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
1 IBL Integration & Testing activities University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, M. Weber  Preliminary definition of Integration.
ID 1.75 Material list: aluminum ¼ X ¾ X 6 in flat bar ¾ X 6 in round stock 1 X 6 in round stock 2 ea 5/16 heli-coil Weld 1” joints.
ATLAS Calorimeter Argon Gap Convection Test Bed April 25,
12.4 Volume of Prisms and Cylinders
1 About this model This model employs 3 inverted ‘bipods’ for baffle. Bipods in quotes because legs are not pinned at ends, but are fixed-fixed. No skins.
Unit 91 Week 14 Jon Gutierrez, Chris Sauer, Simon Radomski, Chat Huynh, Jeff Burton, & Robert Platt November 19, 2008 Prototype Review Week 3.
Why do things feel hot? What is heat? What is temperature?
56 MHz SRF Cavity Cryostat support system and Shielding C. Pai
Orbit Correctors in D2 and Q4 Update J. Rysti and E. Todesco 1 4/11/2014.
Special Products of Binomials
Percentage Composition
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
Special Products of Binomials
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
Activation around dump shielding, and design of beam line mask Mathieu Baudin, RP Genevieve Steele, EN-STI Helmut Vincke, RP.
Comments on the CLEO-III drift chamber support Dan Peterson, Cornell CLEO-III took data at CESR from ~1998 to ~2008 and evolved from CLEO-I.
Lsmin h Lsf = Length of Spring, Free condition (one spring to represent many) Lsmin = Length of Spring, MINimum (upper bearing outer ring bottomed out.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Holt McDougal Algebra Special Products of Binomials Warm Up Simplify (–2) 2 4. (x) 2 5. –(5y 2 ) x2x (m 2 ) 2 m4m4.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
Earth Layers Foldable Follow each of the steps carefully in this presentation to complete your foldable.
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE (DOUBLE COLLARING OPTION) S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 24 th 2015.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Engineering Design of Raon SC Cavities Myung Ook Hyun SCL Team Myung Ook Hyun SCL Team.
The reading is 7.38 mm. The reading is 7.72 mm.
Extra / Discussion Slides. 2 1.Helium Top Fill Port Add extra CF/ISO flange as collar so that the weld-region is not disturbed 2.Helium bottom FillCF.
Mounting TPCs in SVX Dock During Phase II Tomorrow I will meet with a company engineer to update the BEAST TPC vessel design. I've attached some slides.
ATLAS 1 Beam Pipe Support SCT TRT Side CSide A Services and Beampipe Support Frame Services and Beampipe Support Frame Pixel Detector Composite support.
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
Tower Sections.
Ork Watch Tower – First Floor Measurements may vary on your printer
HLTS Kickoff Presentation Derek Bridges Bobby Moore July 7, 2011
Hervé Allain, R. van Weelderen (CERN)
Strip Petals: Local supports and prototype tests
Endplay Rb Fapp = W + TH Ru h Lsf Lsmin W EP Lms=Lr-EP Lr force force
Endplay Rb Fapp= W + TH Ru h Lsf Lsmin W EP Lr Lms force force Fapp h
Hervé Allain, R. van Weelderen (CERN)
Four OTR Tasks.
Hervé Allain, R. van Weelderen (CERN)
(B.P :51) ( B:P52 ).
SIT AND FTD DESIGN FOR ILD
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Origami Let’s make a Fish!.
Mechanical Discussion
Bridge through Ten Addition
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
Additional Upstream Coil Shielding
Year 9 Geometrical Reasoning
Describe the similarities and differences of the top figure and the bottom figure shown to the right.
Bunker Wall Design Wall ESS
Presentation transcript:

Notes on beam pipe collars and support brackets for MSC Silber

East side PST_trans_no_fixture.SLDASM

West side PST_trans_no_fixture.SLDASM

2x Titanium M4, 12mm length (shown in yellow) 4x M4, 12mm length (aluminum ok) “bottom” vespel piece slightly taller than “top” Lower bracket is 2219 (high temp) aluminum alloy Thermal break is Vespel Upper bracket can be 6061 Only difference in the two configurations is the size of the vespel thermal break piece MSC Transition BP Collar Support.SLDASM

Small Sliding Beam Pipe Collar.SLDASM (inner ring has 1.710” ID) Small Beam Pipe Flange.SLDASM (inner ring has 1.670” ID) 8x helicoils (4-40, titanium, MSC ) 8x helicoils (4-40, titanium, MSC ) Quantities: 1x Small Beam Pipe Flange.SLDASM, vespel – for the west side 1x Small Beam Pipe Flange.SLDASM, aluminum alternative – for the west side 2x Small Beam Pipe Flange.SLDASM, aluminum – for the east side