U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration - 1 - A Modification of the HSL Flash Composition Test Apparatus.

Slides:



Advertisements
Similar presentations
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
Advertisements

Identifying the components of a mixture
C230 Kompressor Oil Change Procedure
Fasteners Mr. Lombardi. Fasteners Mr. Lombardi.
Instructions for making plunger fork tool. Drawing for the trigger assembly.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Changing the Oil in a 2006 Mitsubishi Eclipse. Introduction Changing the oil in your 2006 Mitsubishi Eclipse is easier than you may think. With a few.
RockOn! Canister Integration RockOn! 2009.
ModICE Modular Integrated Connector Enclosure
Stanley DS11 Diamond Saw.
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
A-dec 300 Dual Mount on 500 Installation. Agenda ► General Information ► Recommended tools ► Installation ► Follow through install guide ► Hands-on install.
ZIPP 404 BEARING REPLACMENT GUIDE Tools Needed:
Click on this image to open the full PDF document.
Release 01/10/051 DUCOSUN F WITH FIXED COVERPLATES ASSEMBLY INSTRUCTIONS.
Spark Plugs Topics covered in this presentation: Spark Plug Construction Spark Plug Reach, Seating and Heat Range Spark Plug Servicing.
¾”-2”. Modification Overview  Production of the series began in 1989 and is current.  Early models of ¾”-2” series did not always.
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Development of a Propane Burner for the UN 6c Bonfire Test.
LAB SAFETY Objective(s): To review and summarize laboratory safety concepts and laboratory practices.
Lithium Metal and Lithium-ion Battery Packaging Development 2014.
860 (LF), 880 ½”- 2” 860 (LF), 880 ½”- 2”. Modification Overview  Production of the ½ - 2” 860 series began in 1997 and is current.  The 880 is an “N”
Air tank installation instructions Included parts: Raw aluminum air tank bracket 5/16-18 button head bolts (qty 4) M8x1.25 button head bolts (qty 4) M8.
Cleaning of the Optical Block, Critical Orifice, and Focusing Nozzle of the Brechtel Model 1710 Mixing CPC.
1 Ladder assembly steps HFT PIXEL updated for ultimate chip ladders 2/12/2012 ladder fixture u.SLDASM.
External nut type series 43
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
Universal Guide Installation Please read and understand the installation instructions fully before proceeding.
School Name Date Volunteer Name Electric Generator SEEDKIT Workshop.
Title: Corvette C5 Column Lock Bypass Originator: John Neese Date: 30 Jan 2005 Revision: Sheet: 1 of 6 Column Lock Bypass.
Treezilla Clinic Lonestar Region, Division 3 - Mike Jobe.
Vex 1.0 © 2005 Carnegie Mellon Robotics Academy Inc. Electromechanical Relays.
Material Science and Technology Lab Safety A. General Rules B. Glassware Safety C. Chemical Safety D. Electrical Safety E. Heating Safety F. Classroom/Lab.
Elementary Electronics for Switch Activities Hsin-yu Chiang.
Types of Threaded Fasteners.  Used to hold parts together  Clearance holes in parts  Nut on other end  Can also be used with a threaded hole.
Hwa Chong Institution. HCI Science Block HCI Science Labs.
Blade Tuner assembly Instruction for tuner assembly on a cryomodule May
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
975, 975XL ¾”-2” 975, 975XL ¾”-2”. Modification Overview  Production of the original 975 began in This version had buna-n check discs and did not.
6/4/ MODERNIZED DEMOLITION INITIATORS (MDI) ( ) ( )
Building a Fixed Magnet DC Motor. Collect the Materials 4” wood Base 1 1/2 volt D Cell Toilet Paper Tube 6 Fixed Magnets18 AWG Enameled Wire Cellophane.
LSM780 Live Cell Turn On/Turn Off Instructions Kim Peifley 07/13/15.
Shear Problem Defined There are no bolts on the inboard side of the coil structure to account for shear forces. Bottom Line: friction alone will not prevent.
765 ½”- 2”. Modification Overview  Production of the 765 began in 1975 and is current.
Grapple Housing Top Sub Grapple Collet Seal Housing Bottom Sub Seal Housing Metal Seal Ring.
Flashpoint of Kerosene by Tag Manual Closed Cup Tester NOTE: Sample should be chilled to at least 20°F below expected flashpoint. 1Place flash tester in.
Replacing Karl Fischer Reagent and Cleaning Generator Cell for the Aquatest CMA 1Remove generator cell leaving black plug attached and dispose of the generator.
NEDM Collaboration Meeting 5/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory.
HF Source Drivers Performance Observations and Recommendations Paul Debbins University of Iowa Nov. 10, 2004.
The Properties of Water. Purpose Describe the properties of water using the terms adhesion, cohesion and capillary action.
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.
The Design: Totally bolted, electrically isolated 6 top and 6 bottom inboard flange holes, with tapped holes in one flange and a thru holes in mating flange.
1 Spark Plugs. 2 Spark Plugs ignite the air fuel mixture in the engine. ≈10,000 volts jump the gap between the center electrode & the ground electrode.
International Perforating Symposium (IPS) 2016 Mitigating the Problems in Select-Fire Perforating Operations.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.
PUMPS Thermal Systems Laboratory Samuel A. Santiago Pérez Modesto González David Alvarado.
Scorpion is a remote tester specifically designed for testing ASD systems. Scorpion is compatible with the FAAST aspirating smoke detector. It is particularly.
GENERAL CAUTION TOOLS REQUIRED ASSEMBLY AND INSTALLATION
Flash penetrations through roofs and walls.
Tool Assembly Procedure
826YD 21/2”-10”.
Chapter 15 part 2.
Receptacle Classifications
Step-by-step assembly instructions
CLEPA analysis of belt contact width measurement (ref. GRSP/2018/6)
Delphi Fuel pump. Overshoot protection screw. No load throttle adjust
David Kennedy December 6th 2014
Presentation transcript:

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration A Modification of the HSL Flash Composition Test Apparatus Spencer C. Watson, U.S. Department of Transportation, Pipeline and Hazardous Materials Safety Administration, Washington D.C. Thaine Morris, MP Associates, Los Angeles, CA David Pier, MP Associates, Ione, CA A presentation for the IGUS-EPP/CIE Joint Meeting, Oviedo, Spain April 7-13, 2013

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration At the 42 nd Session of the UNECE TDG Subcommittee meeting in December 2012, the US submitted UN/SCETDG/42/INF.28 commenting on the similarity of results of the HSL Flash Composition Test and the US Flash Composition Test In this informal paper, there was discussion of a simple modification to the design of the HSL Flash Composition Firing Plug which the US experts had found to improve the reliability of the test results and shorten the operational down time. The Chairman of the Explosives Working Group invited the US to further document the changes in the firing plug design and operating procedure so that other countries might also evaluate the modification and make comment. INTRODUCTION

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Current HSL Firing Plug Design - 3 -

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Modified HSL Firing Plug Design - 4 -

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Modified HSL Firing Plug Design-Breakout - 5 -

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Modified HSL Firing Plug Electrodes GROUNDED AND INSULATED ELECTRODES

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Modified HSL Firing Plug Plastic Insulator - 7 -

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Modified HSL Firing Plug Thumb Screw - 8 -

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration - 9 -

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Strip approx. 4 mm of insulation from the ends of the match wires, insert thru the top holes and kink the ends of both leads slightly, then pull the wires back up until they catch on the shoulder and screw in the electrodes, forcing the silicone gel back up the openings to seal them.

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Apply a small amount of silicone grease into both electrode openings before threading in the electrodes.

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Tighten the electrodes against the top of the exposed kinked lead wires.

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Coil the excess match head wires and position the match head slightly above the sample cup holder and pointed down towards it.

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Operating Instructions for Using the Modified HSL Firing Plug Design 1.Remove both screws in the base of the main plug. 2.Assure that there is no debris in the opening 3.Inject silicon heat compound into each hole using the tube in which the compound is supplied. 4.Strip 6 mm of the leg wires and insert into the small hole at the top of the plug. 5.Insert the screws and tighten finger tight assuring they have captured the leg wires. 6.Carefully wipe of all of the silicon compound that has extruded from the small holes on the top form the plug.

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Operating Instructions for Using the Modified HSL Firing Plug Design 7.Arrange the electric match so it is positioned in the cup on the top of the plug. 8.Check the electrical continuity of the match through the two screws. If it is good, proceed. 9.Assure the lead washer is in place on the plug. 10.Load the cup with composition; insert the plug into test fixture, tighten, and proceed with testing as normal.

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Operational Differences Using two modified HSL firing plugs in rotation, two laboratory technicians were able to complete 36 trials on the twelve new formulations with no stoppages or interruptions in under four hours. One technician prepped the firing plug not in use while the other technician weighed the samples, assembled the apparatus and recorded the data. With the existing HSL firing plug design, two laboratory technicians had required up to two full days to collect the same amount of data.

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Conclusions ● The improved HSL Firing Plug Design produces Flash Composition results as consistent or better than the existing HSL Firing Plug design. ● The improved HSL Firing Plug Design saves considerable time and effort in operational efficiency of data collection over the existing HSL Firing Plug design

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Future Work ● Invite other experts to try the modified HSL Firing Plug Design to see if their results match these. ● If there is substantial corroboration among other experts, propose that the HSL Flash Composition Test Fixture Drawings in Annex 7 of the UNMTC be amended to include the modified Firing Plug design