3.1.9 Student Book © 2004 Propane Education & Research CouncilPage 1 3.1.9 Replacing Valves and Fittings in ASME Tanks Replacing ASME tank valves and fittings.

Slides:



Advertisements
Similar presentations
Charging. Charging Step 1 Should the lineset length of an installation exceed the charge supplied with the outdoor unit, additional charge will be required.
Advertisements

Installing & Testing Regulators
3.4.5 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Pumps, Strainers and Bypass Systems Knowing how to maintain.
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
HVAC523 Soldering.
Student Book © 2004 Propane Education & Research CouncilPage Installing Steel Piping in Vapor Distribution Systems Installing steel piping.
3.3.3 Student Book © 2004 Propane Education & Research CouncilPage Operating a Dispenser to Fill DOT Cylinders Operating a dispenser to fill DOT.
3.7.6 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
Student Book © 2004 Propane Education & Research CouncilPage Installing Vapor Meters Vapor meters are precision measuring devices that.
2.5.2 Student Book © 2004 Propane Education & Research CouncilPage Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.
3.7.4 Student Book © 2004 Propane Education & Research CouncilPage Identifying Testing Procedures for Anhydrous Ammonia (NH3) Contamination Because.
Identifying Equipment & Procedures Used on Propane Transports
4.1.8 Student Book © 2004 Propane Education & Research CouncilPage Selecting Piping and Tubing After completing the gas customer profile and examining.
4.1.9 Student Book © 2004 Propane Education & Research CouncilPage Sizing and Selecting Vapor Meters for Gas Distribution Systems Vapor meters.
3.4.6 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Compressors Knowledge of the processes involved in maintaining.
2.3.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Purging Containers & Injecting Methanol Prior to.
3.6.2 Student Book © 2004 Propane Education & Research CouncilPage 1 Many propane marketers receive railcar bulk propane shipments. Well-trained personnel.
1.1.2 Student Book © 2004 Propane Education & Research CouncilPage 1 A basic knowledge and understanding of propane’s physical properties and characteristics.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Student Book © 2004 Propane Education & Research CouncilPage Installing Buried Distribution Lines Using Polyethylene Tubing and Mechanical.
Student Book © 2004 Propane Education & Research CouncilPage Installing Manifold Cylinders or Tanks When installing manifold DOT cylinders.
4.1.4 Student Book © 2004 Propane Education & Research CouncilPage Designing Aboveground ASME Tank Installations A very important decision in designing.
4.1.6 Student Book © 2004 Propane Education & Research CouncilPage Designing Underground ASME Tank Installations A very important decision in designing.
3.1.5 Identifying Procedures for Evacuating ASME Tanks at Bulk Plants or at Customer Locations A full understanding of the operation of the liquid evacuation.
Student Book © 2004 Propane Education & Research CouncilPage 1 To provide safe and efficient transporting of bulk containers, such as ASME tanks.
2.5.6 Student Book © 2004 Propane Education & Research CouncilPage Operating a Propane Dispenser to Fill Vehicle-Mounted ASME Tanks To safely and.
5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 1 NFPA 58, LP-Gas Code, sets out the minimum valve and fitting requirements for propane.
3.2.2 Student Book © 2004 Propane Education & Research CouncilPage Performing DOT Cylinder Evacuation and Vapor Flaring Operations Before DOT cylinder.
3.4.2 Student Book © 2004 Propane Education & Research CouncilPage Types and Functions of Valves and Fittings Used in Bulk Plant Containers and.
4.1 Student Book © 2004 Propane Education & Research Council Layout, Design and Selection of a Vapor Distribution System 4.1.
4.1.5 Student Book © 2004 Propane Education & Research CouncilPage Determining the Proper Corrosion Protection Systems for Underground ASME Tanks.
Student Book © 2004 Propane Education & Research CouncilPage Applying Protective Coatings to Storage Containers ASME tanks require proper.
3.7.5 Student Book © 2004 Propane Education & Research CouncilPage 1 A full understanding of the operation of the liquid evacuation process if essential.
5.1.5 Student Book © 2005 Propane Education & Research CouncilPage 1 Specific measures are required by the LP-Gas Code for the prevention of dispenser.
3.5.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Following the proper procedures for filling bobtails is essential to a safe and efficient.
In this module you will learn to identify:
In this module you will learn to:
2.5.3 Student Book © 2004 Propane Education & Research CouncilPage Verifying Proper ASME Tank Condition Prior to Loading For the safe and efficient.
5.1.7 Student Book © 2005 Propane Education & Research CouncilPage 1 Dispensers used to service portable cylinders require suitable scales for filling.
NFPA 31 Standard for the installation of Oil- Burning Equipment
5.1.? Student Book © 2005 Propane Education & Research CouncilPage 1 Selecting the pump for a propane dispenser should include a complete understanding.
Student Book © 2004 Propane Education & Research CouncilPage Purging Vapor Distribution Lines & Appliances Purging is the controlled displacement.
4.2.8 Student Book © 2004 Propane Education & Research CouncilPage Installing Aboveground ASME Tanks Installing aboveground tanks is an important.
3.4.7 Student Book © 2004 Propane Education & Research CouncilPage Examining Bulk Plant Electrical Systems Prevention of gas ignition in transfer.
Student Book © 2004 Propane Education & Research CouncilPage Making Repairs or Replacements on Propane Tubing Persons who repair or replace.
7.3.5 Student Book © 2005 Propane Education & Research CouncilPage Identifying the Function and Characteristics of Draft Fans & Controls High efficiency.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
3.7.3 Student Book © 2004 Propane Education & Research CouncilPage Identifying Safe Handling Practices for Flammable and Combustible Liquids Injecting.
Preparing Foundations for Cylinders & ASME Tanks
5.1 Student Book © 2005 Propane Education & Research Council 5.1 Designing & Installing Dispenser Transfer Systems.
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
Student Book © 2004 Propane Education & Research CouncilPage Reducing Cargo Tank Vapor Pressure Using a Plant Compressor In order to use.
3.4.3 Student Book © 2004 Propane Education & Research CouncilPage Bulk Plant Emergency Shutdown Equipment and Periodic Examination Methods One.
7.4.3 Student Book © 2005 Propane Education & Research CouncilPage Identifying Systematic Troubleshooting Techniques and Guidelines for Gas Operated.
5.1.6 Student Book © 2005 Propane Education & Research CouncilPage 1 Selection of proper dispenser transfer hoses, end valves and adapters relies on a.
3.5.9 Student Book © 2004 Propane Education & Research CouncilPage 1 Although unloading a bobtail cargo tank in metered delivery service at the bulk plant.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Replacing DOT IM tank valves and fittings requires careful application of precautions.
3.3.4 Student Book © 2004 Propane Education & Research CouncilPage Operating a Dispenser to Fill DOT Cylinders by Volume DOT cylinders are designed.
4.1.2 Student Book © 2004 Propane Education & Research CouncilPage Determining System Load and Customer Demand Profile Designing a satisfactory.
Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Converting ASME Tanks in Ammonia Service to Propane.
3.5.6 Student Book © 2004 Propane Education & Research CouncilPage Verifying the Presence of Propane Odorant Drivers and plant unloading personnel.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
3.6.3 Student Book © 2004 Propane Education & Research CouncilPage 1 Personnel who perform tank car unloading operations must comply with company operating.
14 Refrigerant Recovery, Recycling, and Recharging.
Installing DOT/ICC Exchange or Stationary Cylinders
Designing DOT Exchange and Stationary Cylinder Installations
Information to the Customer
TRENTON Casing Filler Presentation
Presentation transcript:

3.1.9 Student Book © 2004 Propane Education & Research CouncilPage Replacing Valves and Fittings in ASME Tanks Replacing ASME tank valves and fittings requires certain precautions and proper selection of valves and fittings. Reasons to replace valves and fittings include: Damage or leaks Improper installation of seals to fittings such as float gauges or the sealing cap on an evacuation valve that causes a leak Pressure relief valves that are not reseating after venting excess pressure In this module you will identify: (1)NFPA specifications for ASME tank valves and fittings (2)Precautions for tank valve and fitting replacement (3)Procedures for replacing ASME tank valves and fittings

3.1.9 Student Book © 2004 Propane Education & Research CouncilPage 1 NPFA 58 Specifications for ASME Tank Valves & Fittings NFPA Valve and fitting requirements for ASME tanks are found in columns 5 and 6 of Table (a) of NFPA LP-Gas Code. Specific valve and fitting requirements are found in other sections of Chapter 2. Valve and fitting requirements for ASME tanks are found in columns 5 and 6 of Table of NFPA LP-Gas Code. Specific valve and fitting requirements are found in other sections of Chapter 5. NFPA

3.1.9 Student Book © 2004 Propane Education & Research CouncilPage 1 Precautions for Valve and Fitting Replacement General safety precautions during valve and fitting replacement include: 1.Never move stationary ASME tanks containing propane indoors or into any enclosed space. 2.Eliminate ignition sources within 25 feet of the replacement operation, & the operation should also be performed downwind of any open flame or ignition source. 3. Reduce tank vapor pressure to near atmospheric pressure. 4. Wear suitable personal protective equipment 5.Verifying that the replacement valve or fitting is the correct one for the tank before removing existing ones.

3.1.9 Student Book © 2004 Propane Education & Research CouncilPage 2 Precautions for Valve and Fitting Replacement General safety precautions during valve and fitting replacement include: 6.Use suitable tools for removal and installation to avoid damage to the valves, fittings, and tank connections. 7.Remove a valve or fitting only when the replacement is ready to be installed. 8.Keep the tank openings closed to the atmosphere, except for the brief time needed between removing and replacement of valves and fittings.

3.1.9 Student Book © 2004 Propane Education & Research CouncilPage 2 Replacing ASME Tank Valves and Fittings Step 1:Select the replacement valve. (See the Note Box for NFPA 58 requirements for fixed liquid level gauge dip tubes,) Step 2:Reduce the vapor pressure in the tank to atmospheric pressure. Step 3:Prepare the replacement valve or fitting.

3.1.9 Student Book © 2004 Propane Education & Research CouncilPage 3 Replacing ASME Tank Valves and Fittings Figure 1. Correctly Applying Pipe Thread-Sealing Compound Do Not Apply to Leading Threads

3.1.9 Student Book © 2004 Propane Education & Research CouncilPage 3 Replacing ASME Tank Valves and Fittings Step 4:Remove old valve. Figure 2. Valve Tools

3.1.9 Student Book © 2004 Propane Education & Research CouncilPage 4 Replacing ASME Tank Valves and Fittings Step 5:Install the new valve according to manufacturer’s instructions. Immediately insert and hand-tighten the replacement valve or fitting. Then tighten it with the valve wrench or ratchet handle and socket. DO NOT APPLY EXCESSIVE FORCE OR OVER TIGHTEN. Over tightening may damage the new valve, fitting or tank coupling threads. After a replacement valve or fitting is installed, re-pressurize the tank with propane vapor, and check for leaks. Brush or spray an approved leak detection solution around the valve or fitting, and watch for bubbles. If none are observed, wash the solution off the tank and dry it with a clean towel or dry rag.

3.1.9 Student Book © 2004 Propane Education & Research CouncilPage 4 Selecting Pressure Relief Valves for ASME Tanks Figure 3. Data Plate for Underground ASME Tank

3.1.9 Student Book © 2004 Propane Education & Research CouncilPage 5 Selecting Pressure Relief Valves for ASME Tanks Figure 4. Table from NFPA 58, 2001 Edition

3.1.9 Student Book © 2004 Propane Education & Research CouncilPage 5 Selecting Pressure Relief Valves for ASME Tanks For an ASME tank having a 97.5 square foot surface area, the 100 square foot line from Table indicates that the replacement relief valve should have a venting capacity of at least 2340 standard cubic feet per minute (SCFM) of air. Relief valves must be installed to be in contact with the vapor space of the tank, without bushings, valves or any intermediate fitting installed between the relief valve and the coupling welded into the tank. A new weather cap should be installed with the relief valve at the time of replacement.

3.1.9 Student Book © 2004 Propane Education & Research CouncilPage 5 Selecting Dip Tubes for Fixed Liquid Level Gauges Figure 5a. Data Plate—500 Gallon AG Tank (Dip Tube 10.7 Inches) Figure 5b. Data Plate—500 Gallon UG Tank (Dip Tube 7.5 Inches)

3.1.9 Student Book © 2004 Propane Education & Research CouncilPage 6 Selecting Dip Tubes for Fixed Liquid Level Gauges Dip tube lengths for the same diameter aboveground and underground tank are different because of the liquid temperature used as the standard for the two ASME tank services. Aboveground tank maximum filling level is based on 80% of tank volume at a propane liquid temperature of 40° F. Underground tanks are based on 90% of tank volume at a propane liquid temperature of 50°F.

3.1.9 Student Book © 2004 Propane Education & Research CouncilPage 6 Special Valve Installation Procedures After installing a filler valve pressure relief valve vapor equalizing return valve be sure the appropriate weather cap is installed on the valve to prevent moisture and other material from accumulating in the valve opening.

3.1.9 Student Book © 2004 Propane Education & Research CouncilPages 7 & 8 Time to See If You Got the Key Points of This Module… Complete the Review on page 7. See if you are ready for the Certification Exam by checking off the performance criteria on page 8.