Assembling a Functional Multi-Wire Proportional Counter - Page 1 Work in pairs. One person will take the chamber apart, and the other will reassemble it.

Slides:



Advertisements
Similar presentations
Zebra® 105SL™ * Removing and Installing Printhead
Advertisements

Using Gas Welding Equipment
1 Stripe 400/600 Removing and Installing Printhead Printhead Resistance Calibration Toggle Position Adjustment.
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Troubleshooting Guide. Table of Contents 2 Shower Filter 3 Leak Between Top Housing & Filter4 Leak Between Swivel Collar & Housing5 Leak at Top of Swivel.
Servicing Welch DRYFAST ULTRA Pump Models 2032
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
RockOn! Canister Integration RockOn! 2009.
UNIT: Oxy-Fuel Welding, Brazing, Cutting and Heating LESSON: OXY-ACETYLENE EQUIPMENT SAFETY Standard B7.2 – Know how to properly set up, adjust, shut down.
Optical Manufacturing Solutions 1 Probe Assembly.
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
Here is the broken line. Step 5: Break loose encasing seal. With bar in vice as show, hit with hammer to break loose. Usually 2 or 3 hits will break loose.
Machining a V-Block Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved. 1.
A Manual for Repair and Maintenance Technicians 1ST STAGE.
Yamaha oil pump rebuild
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Honda Recon TRX-250 Installation Manual. STEP 1: Remove rear tires and install axle spacers. Use blue thread locker and tighten lugs to ATV specification:
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
Digital StarLab Set-Up, Operation, Maintenance, and Teacher Manual for the Digital StarLab are in the links below or on the training tab in the BlackBoard.
Ion source maintenance on the MAT 253
Print Head Removal, Replacement and Alignment. Page 2 CONFIDENTIAL Print Head Assembly Removal  Turn off printer A.C. power  Unplug the printer from.
Measuring Cosmic Ray Flux with a trigger and CAMAC readout - Page 1 Connect the Fluke 415 HV supply output to the input of the voltage distribution box.
1 Zebra 170 XiIII Plus Removing and Installing Printhead Calibrating Head Resistance Print Quality Adjustments.
Cleaning of the Optical Block, Critical Orifice, and Focusing Nozzle of the Brechtel Model 1710 Mixing CPC.
Oxy-fuel Welding and Cutting By: John Templeton
Unit 4: Oxyacetylene Welding and Cutting in Agriculture
Terms and Definitions Base Metal: Metal to be welded Fusion Welding: process that joins metals by heating them to a melting point and allowing them to.
Building a Pressure/Temperature Weather Station (Sensor Pack) AEM 1905, Fall 2008.
Clean Air Box Usage & Care CABs RAMs CO Monitors.
Supplied-air regulator Copyright © 2013 by The S.E.A. Group.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Building a Computer Kate Chapin Capstone Project.
Service Seminar Model MB4.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
Supplied-air regulator Copyright © 2013 by The S.E.A. Group.
Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand.
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
Small Engine Reassembly Briggs & Stratton OHV
Replacing board in CLAP Tools: Flashlight (torch for those of you in Cape Town)) small philips screwdriver spacer tool* dish to hold screws 2 rolls of.
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
Braided Hose Lines & Pressure Fittings Made Easy By 5 Points Vintage Ltd.
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
PC Maintenance: Preparing for A+ Certification Chapter 8: Installing and Troubleshooting the Basic Components.
CLM Maintenance. Covers : 1 - Side cover, 2 - Back cover, 3 Top cover, 4 - Lamp door, 5 - Side cover input and communication side, 6 - HEPA dust filter,
LAB #10. Governor Control Arm Using a 10mm socket install the two bolts that hold the governor control arm. Finger tighten then torque to 100 “#
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Engine Reassembly Technicians need to take their time when reassembling an engine. This is not a race! Listen for instruction when to add the next piece.
P:\ISO \Work Instructions\Assembly\Options\ARMADILLO SWEEPER OPTIONS\10X ARMADILLO SWEEPER OPTIONS MODEL: KIT-MFG-ENG SHDN DSL M&FS SWA.
Designing a Next-Generation Surgical Robot Activity.
Motor Propeller wrench Screw Nut (2) Cylinder top Tiny screw IGNORE:
1 PST Heater Panel Design The PST heater panels are internally redundant resistive circuits printed onto a Kapton sheet with an aluminum backing. They.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
1 Equilibrium The Balancing Robot By: Kerry Scharfglass Whiz Kid.
Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.
RockOn! RockOn! Structure Build RockOn! 2009.
Shaft Replacement Standard Operating Procedure
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
Quick Installation – 1/4 Pressure Sensor
ASSEMBLY/INSTALLATION INSTRUCTIONS ASSEMBLY AND INSTALLATION
T400 Motor Replacement.
To install the four wires from the back of the coil machine, loosen the four knobs. Insert each of the four wires from the side under the knobs. Keep each.
HCAL HV splice box.
HYBRID COOKTOP.
Wiring the Light and Relay
Installation guide for RG6/59 compression connectors
Fin & Countertop Sample Kit Instructions
Oxygen Acetylene Cutting Torch
Presentation transcript:

Assembling a Functional Multi-Wire Proportional Counter - Page 1 Work in pairs. One person will take the chamber apart, and the other will reassemble it as pieces are handed over. Please work slowly and carefully. Place the chamber such that the bolt heads are at the bottom. Unscrew the nuts from the 4 bolts. Unscrew all of the grounding connections between planes Take off the top aluminum housing, and hand it to your partner, who will flip it over and place it down on the other 4 bolts. Your partner will then place the extra set of alignment pins into this housing. Now take off the following planes, in this order, hand them over to your partner, who flips it onto the bolts and pins: – Cathode foil plane (with HV cable attached) – Anode wire plane – Cathode foil plane – Anode wire plane (in opposite orientation) – Cathode foil plane (there should be a spacer between each of these planes and between the planes and the aluminum housing.)

Assembling a Functional Multi-Wire Proportional Counter - Page 2 As you handle the anode wire planes, be sure and carefully look at how thin they are and how they are glued into place. Do not attempt to touch the wires because this will destroy them! After the final aluminum housing is put into place, then put on the nut and tighten the layers together. Reattach the grounding wires. Prepare the gas line: – Unscrew the gas cylinder cap – Carefully screw in the regulator. Tighten it with a wrench about ¼ turn. – Put the brass compression fitting on the end of the black flexible hose, with the inner collar and the screw threads facing out. – Move them to the end of the hose and hand tighten them onto a compression barrel piece. – Use two wrenches to tighten the hose onto the barrel in the chamber by at least a ¼ turn.

Assembling a Functional Multi-Wire Proportional Counter - Page 3 Turn on gas supply knob so that the high pressure side of the regulator reads 1000 psi or more. Adjust the low pressure side of the regulator so that it reads about 5-10 psi Attach the HV lines from each of the three cathode planes to the chamber distribution box. Attach the HV line from the NIM HV supply (‘A’ on the back) to the distribution box. Turn the knob on the NIM power supply ‘A’ all the way to the left. Set the full scale current setting to 10 microAmps. Turn on supply ‘A’. Read the setting by measuring the voltage output at the front panel (1 V read back = 1 kV actual). Slowly turn on the supply. If the needle on the current gauge begins a runaway increase, back down on the voltage. Over a period of a few minutes, bring up to 2.7 kV. ( The current should be less than 100 nAmps.

Assembling a Functional Multi-Wire Proportional Counter - Page 4 Bring radioactive beta source (either Sr-90 or Ru-106) close to the chamber. Can you see the current needle move on its most sensitive setting (100 nA)? Plug in Nanometrics amplifier/discriminator card to any desired connector, with LV connection away from the chamber. Turn on +/-5V supply. Take 16 channel ribbon cable from Nanometrics output to the ECL/NIM converter in the NIM crate. Read each channel’s rate by connecting output to scaler. Bring source over wires and see if rate increases.