WYDOT’s Variable Speed Limits AASHTO ANNUAL MEETING 2013.

Slides:



Advertisements
Similar presentations
Safe System Approach Eric Howard.
Advertisements

Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
VARIABLE SPEED LIMIT DEPLOYMENT EVALUATION I-270/I-255 Traffic and Safety Conference May 12, 2010 Missouri University of Science and Technology and HDR.
The Georgia Initiative GDOT/GUCC Clear Roadside Program.
A Comprehensive Study on Pavement Edge Line Implementation Presented by: Mark J. Morvant, P.E. Associate Director, Research Louisiana Transportation Research.
Industry Benchmarks How do you measure up?. Driver Qualification Standards For years insurance companies have been tightening up their driver MVR standards.
Safety Partnership for US-2 Michigan Traffic Safety Summit 2007.
LANE CLOSURE CHARTS CHART DEVELOPMENT AND DELAY DAMAGES (District 3) OBJECTIVE To become familiar with the lane closure chart development process.
COMMERCIAL MOTOR VEHICLE SIZE ENFORCEMENT. CURRENT CHALLENGES Significant Growth in CMV Traffic Increased congestion and delay Demand for larger and heavier.
Florida Department of Transportation, November 2009
Ramp Metering Pilot Project May 11th, 2010 E. Jason Sims, P.E. Kansas City Scout TMC Manager.
Sequential Dynamic Curve Warning System. Project Partners Technology Provider:  Traffic and Parking Control Co., (TAPCO) Evaluation Team:  CTRE (Iowa.
Economic Analysis in Transportation Systems CE 7640: Fall 2002 Prof. Tapan K. Datta, Ph.D., P.E.
Life Cycle Cost Analysis in Pavement Design - In Search of Better Investment Decisions - Office of Asset Management Federal Highway Administration Executive.
Evaluation Tools to Support ITS Planning Process FDOT Research #BD presented to Model Advancement Committee presented by Mohammed Hadi, Ph.D., PE.
CE 4640: Transportation Design
June 16, 2004 Dr. Robert Bertini Michael Rose Evaluation of the “COMET” Incident Response Program Oregon Department of Transportation.
Traffic Signal Warrants
Month XX, 2004 Dr. Robert Bertini Using Archived Data to Measure Operational Benefits of ITS Investments: Ramp Meters Oregon Department of Transportation.
Weather and Winter Mobility Program Overview U.S. Department of Transportation Federal Highway Administration Paul Pisano Weather & Winter Mobility Coordinator.
Created and Presented by Chelsea Jean Leppanen CVTC Safety Coordinator.
POV Responses Date: 2006 Time of Day: 2000 Location: Stadium Blvd / Providence Rd Response Mode: Emergency Response Description: While responding to a.
Traffic Incident Management – a Strategic Focus Inspector Peter Baird National Adviser: Policy and Legislation: Road Policing.
1 Operational Evaluation of Dynamic Lane Merging In Work Zones With Variable Speed Limits University of Central Florida Dr. Essam Radwan, P.E. Mr. Zaier.
Speed Offenses & Speed Enforcement
An Intelligent Transportation System Evaluation Tool in the FSUTMS Regional Demand Modeling Environment By Mohammed Hadi, Florida International University.
ITS Sketch Planning Tool Webinar 2:00 – 4:00 PM January 8, 2009.
1 Paul Pisano FHWA, Team Leader Road Weather & Work Zone Management Weather and the Connected Vehicle Presentation at the Connected Vehicle Program Public.
1-1 LOW COST SAFETY IMPROVEMENTS Practitioner Workshop Introduction – Session #1.
2007 TRB Planning Application Conference D ELDOT S TATEWIDE E VACUATION M ODEL.
Incident Management in Central Arkansas: Current Settings and Proposed Extensions Weihua Xiao Yupo Chan University of Arkansas at Little Rock.
WSDOT SW Region, Vancouver, WA December 7, 2009 WSDOT SW Region, Vancouver, WA December 7, 2009 Tolling Study Committee.
Rural Intersection Collision Avoidance System (RICAS) US Highway 53 and State Highway 73 Minong, Wisconsin Additional information Project Website:
Benefit-Cost Analysis of the SMART SunGuide Operations in Fort Lauderdale, Florida June 2006 Steve Corbin District ITS Operations Manager FDOT District.
WORK ZONE SAFETY & MOBILITY Meeting the Federal Rule Jim Allen Safety Implementation Engineer ATSSA Illinois Chapter Meeting.
1 25 th International Conference on IIPS, AMS Annual Meeting, Phoenix, AZ An Update on FHWA Road Weather Management Initiatives Paul Pisano Federal Highway.
Wyoming’s Approach to Safety Using the New SHRP2 Data Martin Kidner, State Planning Engineer Wyoming DOT July 22, 2015.
The Science of Prediction Location Intelligence Conference April 4, 2006 How Next Generation Traffic Services Will Impact Business Dr. Oliver Downs, Chief.
ROUNDABOUTS Improving Safety and Efficiency The Ohio Department of Transportation District Clark Ave. Ashland, OH Julie Cichello, P.E. District.
Efficient Traffic Flow:
NOAA: Promoting Safe and Efficient Commerce and Transportation January 2005 Charlie Challstrom.
Lane Departures By: Deborah S. McAvoy, M.S., P.E., PTOE Tapan K. Datta, Ph.D., P.E.
Use of MDSS by the City and County of Denver March 14, 2007 Pat Kennedy, P.E. Denver Street Maintenance.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Emergency Vehicle Operations Unit V Standard Operating Procedures Standard Operating Guidelines 1.
Unsignalized Intersections Safety at Unsignalized Intersections.
1 Using Intelligent Transportation Systems (ITS) Technologies and Strategies to Better Manage Congestion Jeffrey F. Paniati Associate Administrator of.
Seat belt law New Jersey seat belt laws require the following people to always be in seat belts while driving in a vehicle. 1 The motorist (driver) 2 All.
BLOCK 4 SELECTION OF THE PREFERRED ALTERNATIVE Pavement Data Collection Project evaluation Select feasible alternatives Reconstruction Restoration Recycling.
INCORPORATING INCOME INTO TRAVEL DEMAND MODELING Brent Spence Bridge Case Study October 13, 2015.
Utah Driver Education and Training Strategies for Managing Risk with Vehicle and Highway Designs Part I Source: FHWA.
1 Ian Skinner Crash information Systems Integrating geographical and statistical analysis for maximum benefit.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
The Role of Speed for Street and Highway Design Norman W. Garrick Lecture 2.1 Street and Highway Design Norman W. Garrick Lecture 2.1 Street and Highway.
Edward L. Fischer P.E..  Ed, it was hard to read slides from back of room with this background.  Can I change it? Nancy Brickman.
Session 2 History How did SPF come into being and why is it here to stay? Geni Bahar, P.E. NAVIGATS Inc.
NOAA, FHWA and the Environmental Enterprise: Partnering for a Safer Surface Transportation System James R. Mahoney, Ph.D. Assistant Secretary of Commerce.
TRB Update AASHTO SCOHTS Annual Meeting April 2016.
Work Zone & Incident Management Strategies Denise Markow, PE, TSMO Administrator Susan Soucie, PE ITS Project Manager ACEC/NHDOT 2016 Technical Exchange.
POLK RAIL QUIET ZONE ANALYSIS Conditions Assessment CSX “S” Line March 24, 2016.
House Transportation Policy and Finance April 13, 2016 Tracy Hatch Deputy Commissioner Chief Financial Officer / Chief Operating Officer.
National Road Safety Strategy Update Joe Motha General Manager Safety Research and Education Australian Transport Safety Bureau.
Evgeniya Tyson University of Wyoming.  Elk Mountain ( Mileposts, 77)  Evanston – Sisters (6-29 Mileposts, 23 total)  Rock Springs – Green River.
Idaho Transportation Department Winter Maintenance Best Practices
Variable Speed Limit Project
I-80 Coalition WYDOT VSL/Wind/ARCG Updates September 2011
MODULE 2: TSMO Strategies
I-81 Corridor Improvement Plan
MODULE 2: TSMO Strategies
Graduate Research Assistant
Presentation transcript:

WYDOT’s Variable Speed Limits AASHTO ANNUAL MEETING 2013

Legislation (WS ) Legislation went into effect 7/1/2008 – Grants authority to set the speed limit based on “vehicle or weather emergency” – “…differing limits may be established for different times of day, different types of vehicles, varying weather conditions, and other factors bearing on safe speeds, which shall be effective when posted upon appropriate fixed or variable signs. � ”

I-80 Variable Speed Limit

The main objectives of this research project were to: – Implement a Variable Speed Limit (VSL) system to improve safety and reduce closure frequency/ durations on the I-80 Elk Mountain corridor. – Create a decision support system to implement the VSL system. The decision support system is to be created to reduce the speed variability in the corridor during adverse weather conditions.

WYDOT’s VSL Strategy Tighten speed distribution Regulatory speeds appropriate to conditions

Real Storm Data Dry and Clear Storm Begins to Impact Roadway VSL In Effect Storm Clears (VSL In Effect)

I-80 VSL System Legend VSL RWIS Speed Sensor

I-80 Variable Speed Limit Results: – Variable speed limit signs reduced observed speeds by 3.4 to 6.4 mph for every 10 mph of speed reduction on the VSL signs beyond the slowing attributed to weather conditions. – The winter after variable speed limit system implementation had the lowest reported crash frequency and crash rates compared with the 10 prior winters. – Higher speed compliance was observed during winter periods when the variable speed limit system was used when compared to the seasonal speed limit reduction from 75 to 65 mph.

Total CrashesTotal InjuryTotal Fatal Crashes Feb 18, Feb 17, Feb 18, Feb 17, Feb 18, Feb 17, Feb 18, Feb 17, Feb 18, Feb 17, Feb 18, Feb 17, I-80 Variable Speed Limit Elk Mountain Corridor Crash Data from Feb 18, Feb 17, 2010

Variable Speed Limits Updates: – Four new VSL corridors have been implemented. Three on I-80 and one on WYO 28. – A before and after model of crash frequency on the VSL corridors was created that accounted for the weather severity of the different years. – The model found that crashes were reduced by 0.67 crashes per week per 100 miles of VSL corridors, which given the 143 miles of VSL corridors on I-80 equates to 50.1 crashes per year avoided through use of the VSL system. The Wyo28 VSL corridor was installed late Fall of The low volume of this roadway may require three full winters of crash history so that statistically sound conclusions can be made on this corridor. – Using Highway Safety Manual values for crash costs and crash severity distributions, it is estimated that the VSL systems generates $4.7 million dollars in safety benefits per year on high volume routes. – Given the average cost of $1 million per VSL corridor to install sensing and sign technology, the four VSL corridor safety benefits exceeded the capital costs after just one year. – The monetary impacts due to road closures, from research in 2007, found that the expected delay costs for weather events was $370 per hour per truck, which on I-80 was $222,000 to $333,000 per hour. With the average closure on I-80 being 8 hours this came to $8 to $12 million in delay costs. These estimates are on the conservative side and could range from $222,000 to $1,000,000 per hour.

Current Variable Speed Limit Corridors

I-80 Variable Speed Limit To get a copy of the report go to: – /files/shared/Planning/Research/WYDOT_ElkMtn VSL_FinalReport.pdf /files/shared/Planning/Research/WYDOT_ElkMtn VSL_FinalReport.pdf For more information: R. Vince Garcia, P.E. GIS/ITS Program Manager