Laser Enclosure to Elevated Rail Assembly Wyman Gordon Forging Locator Original Revision: 2/14/2013.

Slides:



Advertisements
Similar presentations
How to Build a Wagon by Michael White One day you are at the store, and you see a nice wagon on the shelf. You just had to have it. So you buy the.
Advertisements

1 Introduction to Engineering Lab 2 – 1 Assembling the Conveyor/Sorter Agenda Goal of todays lab. Storing your teams conveyor/sorter. Tool kits. Safety.
1 © 2009 ZelFlex QR 266x380 with adapter Step by Step User Guide Version 1.02.
General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
Using three IR sensors, SensingBot can sense the front obstacles so it can avoid them. Sensing.
BumperBot uses two contact switches to go through a labyrinth. Bumper.
© 2006 BEI Technologies ENCODER, Installing the LN Linear Encoder Note: The following installation example is for demonstration purposes.
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Session 6 KY Type 4A End Treatment See “Shop Drawings” for Types FLEAT-SP Slide 6 by Road Systems SRT-27 Slide 47 by Trinity.
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
Honda 450 Installation Manual.
Trinity Highway Products Properly Installed SRT Post HBA System-Slotted Rail Terminal
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Assembly Instructions Additional documents needed for Assembly: GA Drawings on all Units Header Platform GA Drawings Motor Deck Platform GA Drawing Packing.
Honda Recon TRX-250 Installation Manual. STEP 1: Remove rear tires and install axle spacers. Use blue thread locker and tighten lugs to ATV specification:
Robot Quick Build Session Frame Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma.
Step 12 Here is the issue…..the mount for the throttle arm is pushed up against the side of the housing. The problem with this is it allows (due to alignment)
Polaris Predator Installation Manual. STEP 1: Remove ATV Rear Tires Remove ATV right side wheel hub Remove ATV stock swing arm (2 bolts) KTRACKS.
Cooling Business Group 1 INSTALLATION Directions.
Mer/Sup. 2 & 3 Door Evaporator Coil Repositioning Procedure S. Starnes 7/11/03 1. Remove the 2 screws holding one end of the evaporator coil. (view shows.
Session 6 KY Type 4A End Treatment See “Shop Drawings” for Types FLEAT-SP Slide 6 by Road Systems SRT-27 Slide 49 by Trinity The KY Type 4A End Treatment.
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
Hoop Tech Clamp Assembly and Attachment. Contents of package.
Handy Store Fixtures Gondola Dolly Assembly Instructions
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Vbine Energy Generator Assembly Pictures and Info Slide Show.
McPherson Strut Service and Diagnosis
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
STELR Solar Car construction notes Based on slides provided by Helen Marussinszky, Mitcham Girls HS, South Australia.
CEVIS handles There are lots of videos on youtube showing how the crew “rides” the CEVIS. The one done by Koichi Wakata is good and shows both operation.
Scooter ScooterBot is a robot that drives using Servo Motor as steering system.
Session 7 How Critical is it to Properly Install Guardrail End Terminals???
14.52 in Attach the Axle to the chassis using the four (4) bolts, washers, and nylon lock nuts. Mount the tires. Note: The wheel recess outside on the.
2000 Chevy S-10 Left Suicide Door Install Instructions 1.Remove seat (4 anchor bolts.) 2.Remove tracks from seat. To access the nut shown in pic 1, pry.
TIRE BALANCING Tire Balancing WEAR YOUR SAFTY GLASSES!!!
Spare Parts List (not to scale)
Ken Periman Problem solving, Sub frame bolt issue
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
Easy Reach 7.0 Honda Element Packing List QtyDescriptionPacked 115ft 10ga Red Wire 16ft 10ga Black Wire 140amp Breaker 23/8 Yellow Ring Terminals 25/16.
1 FPA Stage 2 Peer Review May 12, 2006 T. Brown. 2 FPA Stage 2 Status Summary of Stage 2 activities Review current design status Review schedule details.
Use original rear consol support/seat belt mountUse supplied console support bracket (front.) Unit Can possibly pop pocket off lower door. IF NOT,
1 2 Remove side trim panel Pop out plug Remove recline lever Unplug power seat Remove side trim panel.
The Hyatt Regency Walkway Collapse Presented By: Jonathan Foster 4/9/02.
Coil-pack assembly procedure Paolo Ferracin LQS01 readiness review #3 Assembly LBNL July 28, 2009.
1 Equilibrium The Balancing Robot By: Kerry Scharfglass Whiz Kid.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Assembly of steering.
VIEW SERIES with Sliding Door
Bilge Pump Service Project Model Service Kit
TIRE BALANCING.
Easycliner (Motorized Version) Assembly Instruction
continued on next slide
LCD Splicing Screens Wall-mounted Guide
AU Media/ER/Toyota/Tech/Gen 7/06 Toyota Tundra
Square Tube Shaft Connecting Both Gear Drives.
How to Install a Garage Door.
Ken Periman Problem solving, Sub frame bolt issue
                                                                                                                                                                                                                                                
continued on next slide
continued on next slide
Flag Installation on Roll-up Signs
Flag Installation on Roll-up Signs
Tagger Microscope Mounting, Shielding & Cooling
W201 3R hardboard Replacement Procedure.
זכויות סוציאליות.
The Garage Assembly Instruction By Laser Dollhouse Designs
continued on next slide
How to make your Kickspark ready for a ride.
continued on next slide
Presentation transcript:

Laser Enclosure to Elevated Rail Assembly Wyman Gordon Forging Locator Original Revision: 2/14/2013

Before & After

Step 1: Attach Bolts to Rail Attachment Loosely attach bolts on both sides of elevated rail attachments.

Step 2: Attach Elevated Rail to Laser Enclosure Slide the elevated rail from the front of the enclosure bracket to the back by placing the connected nut and bolt into the track on the bracket

Step 3: Alignment Align the elevated rail and bracket by positioning the front rail attachment flush to the front of the enclosure bracket

Final Step: Tighten Bolts Tighten bolts in the rail attachment to the enclosure bracket to finish assembly