Growing Fish in a Recirculating System: Advanced Teacher’s Workshop An Inexpensive Recirculating System Blan Page & PJ Waters.

Slides:



Advertisements
Similar presentations
Levolors New Size-In-Store Blind Cutting Machine.
Advertisements

Sectional Assembly and Installation
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
Agricultural Mechanic and Technology Cluster
Breaking, Measuring, and Adjusting Chain ~The most used drive system on a FIRST robot uses chains and sprockets. Understanding the proper techniques to.
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
Installation. Indoor Unit Installation Typical Installation.
Rus Alit or Tee Water Pump
BUNNY LANTERN. Place BACK of envelope on table in front of you, with flap up and open.
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Tank and Coil Chiller Setup. Equipment list  Bleach  Aquarium (min 10 Gal)  Chiller (there are several types)  Insulated box or some kind of tank.
1. 2 Family/Community Involvement Health Education Health Promotion for Staff Healthy School Environment Health Services Physical Education Counseling,
How to Make a Rain Barrel Carrie T. Stevenson Escambia County Extension.
TrueSTEAM™ Humidification Systems Module 4: Advanced Installation.
The Little Nikki Assembly Instruction By Laser Dollhouse Designs.
Screened Warning Pipe A screened water pipe is a requirement under the water regulations. The pipe should be one size larger that the supply pipe.
Instructions 1.  SITING YOUR TRAMPOLINE  Your trampoline works best and is safest if it is dead level. If your trampoline is fitted.
The DB In-Line Pumpout Unit Easy-to-use control panel with one switch to run the unit. 15 AMP reset fuse. 115 AC External water pump and tank drain have.
Tank and Inline Chiller Setup. Equipment list  Bleach  Aquarium (min 10 Gal)  Chiller (there are several types)  Insulated box or some kind of tank.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Water Treatment Plant Reflections alum Flocculation Clear Well Sedimentation.
New Mexico FFA Agricultural Mechanics Career Development Event Plumbing.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
Installation. Indoor Unit Installation Typical Installation.
Step 1 Park vehicle on a level surface then engage the parking brake and turn off engine. If you cannot comfortably get under the car, raise the front.
Presentation on Installation of a Domestic Cold Water Storage Cistern
Hydronic Mechanical Controls
Rain Barrel Module. What will you do with the rain? Water gardens, indoor plants Wash the dog, car, & muddy feet Use in toilet tanks when well pump isn’t.
Next Slide Introduction to the Drill Press Created by Mr. Heck.
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
Pump is Blue part (right) - timer is black (left side) New Electrical Outlet This Photo shows where the Re-Cir pump is installed on the Output line on.
Rain Barrel Workshop February 11, 2012 By Melissa Merritt.
What is EcoMachine?  It is a machine that reduces water consumption in the Aiken Center by treating sewage exiting the building and then returning it.
Installation. Indoor Unit Installation Typical Installation.
Mark a line at the center of the canvas for its entire length. Place frame on a table or saw horses, bottom up.
Water Supply Skill Drills.
Basic Home Plumbing.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Plumbing Tools ˚ Pipe Elbow 45˚ Pipe Elbow Making a 45 degree turn with a pipe.
Zoning Hydronic Systems. Zone Control Divides the Space to be Heated 1.Each with its own heating needs and control systems 2.There are several reasons.
Add plants to your garden
Fabrication of Fishtank Reservoir ENGR 121 living with the lab.
Workshop Sponsored by: Home Grown Food Rain Barrel for Under $40.
D-Oily Tools 02/01/06 Week 4 Deliverables Aaron Lunt Adam Kan Justin Chastang Richard Burge Michelle Siverd Tyler Warnock Conceptual Design.
By Molly. Things that you will need  Fish tank  Grow bed tub  Water  Clay balls  Pipes  Oxygen pump  Water pump  Garden hose  Plants  Bucket.
Village of Elm Grove Beautification Committee
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Tips on how to winterize your lawn sprinkler system Benefits of using Lawn Sprinkler Systems.
Foldable Tie Book Instructions. Materials Needed 2 pieces of scrap paper Glue stick Paper Hole Punch Tool 1 piece of yarn cut to one arm’s length.
EBS-1 # COOLANT FLUID EXCHANGE QUICK REFERENCE ATTENTION: Using the Coolant Fluid Exchange requires the FILL and VAC Valves on the SERVICE.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Rotating Compost Barrel Construction
VIEW SERIES with Sliding Door
1.
Learning for Water wehelptwo.com
Tips on how to install irrigation systems
Octopot Single Auto Fill System Octopot.com
Drill Press Coach Ketcham Productions.
Safety Poster Coach Ketcham Productions.
MODEL: WC SWEEPER SCRUBBER DOCUMENTED BY: Brett Sprietler PAGE NUMBER: 1 DATE: 11/20/ Place (1) HOSE IMPELLER TO TANK ( )
Disclaimer: Please note and abide by copyright laws. Some items contained in these presentations are taken from copyrighted material without express permission.
Step-by-step assembly instructions
2.2 Gallon TourTank Installation
Step-by-step assembly instructions
Step-by-Step Assembly Instructions – Cube Version
Countertop Renovation
Step-by-step assembly instructions
Omega Selection Center
Presentation transcript:

Growing Fish in a Recirculating System: Advanced Teacher’s Workshop An Inexpensive Recirculating System Blan Page & PJ Waters

System Components Three (3) 100 gallon stock watering troughs Two (2) 55 gallon barrels Pipe, valves, fittings – 1.5” – 1.25” – 0.75” – Special fittings ” x 5/8” hose barb 0.75” threaded Tee Submersible Pump Cable Ties Garden Hose 5/8” “Light grate”

Where To Get it?? Troughs – Purchased at local Feed & Seed store for under $80.00 each. Can find for less, just have to look in your area 55 gallon barrels – Donated by Coca Cola Pipe, valves, fittings, Light grate – Local plumbing supply and hardware stores Pump, Bulk Head Fittings, Bio Media, Mechanical Sock, etc. – Aquatic Ecosystem Other places/ideas exist

The Tanks Come with threaded fitting (1.25”) Make sure the BHF in the tank is tight – Many times they will leak b/c they are not secured at the factory – DO NOT over tighten

The Barrels Have a 0.75” threaded fitting in the tops Not used in this instance, but could be to put an external pump in place Make sure that you ‘chock’ the mechanical filter when you get it installed – Use a 2x6 on each side – Build a box frame – Etc.

Simple instructions You can start where ever you want We started with the mechanical filter and a tank to get good measurements

The Mechanical Filter Two 90s (1.25”) nested One tail piece to go into barrel Pipe height will determine water level – WHY?

The Mechanical Filter/Pump Opposite end of the barrel Cut out for pump

The Mechanical Filter/Pump Insert Pump How to attach – Catalog indicates a 0.75” outlet – Doesn’t fit? – Improvise

The Supply Side Use a threaded 0.75” tee, a 5/8” X 0.75” threaded 90, and ” valves Why 2 valves?

The Supply Side Here you can see the Mechanical filter (lower left corner), one of the 2 valves you just installed and the pipe leading to the biofilter

Supplying the Biofilter Measure carefully Use the model

Supplying the Biofilter Trace out the inner circle of the BHF gasket Carefully cut out line with jig saw. No need to look for a hole saw.

Supplying the Biofilter On the inside of the supply side BHF to nested 90 turned up

Supplying the Biofilter On the inside of the supply side cont’d Up to Nested 90s Down to bottom of tank

Flood Prevention Step No guarantees, but drilling a small hole in the center of the nested 90s will allow for a siphon break in the event of a power failure. Keeps the water in the barrels and off the floor

Supplying the Biofilter Once the hole is drilled Install and cut a length of pipe long enough to reach the bottom

Use a BHF (1.5”) MPT X SLP Tee 2 Caps Measure carefully – Try to center tee – Cap the ends – Use slotted pipe to screen biofilter material Draining the Biofilter (inside the unit)

BHF to MPT X SLP Nested Valve This valve is screened inside so biomedia will not leave Can be plumbed further to drain where needed Draining the Biofilter (outside the unit)

Supplying the Tanks The Biomedia we are using floats Screen the supply line so it doesn’t escape Just like the drain Measure carefully to center Allow arms to be long enough to just fit inside the barrel MPT X SLP to BHF

Supplying the Tanks Cont’d Further contain the biomedia by adding a piece of lighting screen Sometimes easier to cut 2 halves and then connect with cable ties Makes it more difficult for unoccupied hands to access and subsequently spread media across your hatchery

Supplying the Tanks This shows the system with 1 tank (capped end for expansion) MPT X SLP Nested 90 down turned Into 45 to sloped pipe To Tee, down turned (could use sweep) Valve at every tank for flexibility Then continue to next tank MEASURE CAREFULLY – Your are relying on gravity here and need to not have uphill

Draining the Tank This is the end tank in the line Cap on down stream end allows for easy expansion – Leave enough room to cut then glue new piece MPT X SLP Nested Valve Nested Tee

Draining the Tank Tanks flow into central drain line Into stand pipe Design differs from photo here – External stand pipe is lower for more reasonable water level

Design Changes from Model Supply Side to tanks Recommend moving supply side to a position over the mechanical filter – Provides better access – Centralizes plumbing Pump Selection – Pump provided will run 3 tanks at ~ 1 turnover per hour – If you desire more flow or are going to add tanks consider adding a stronger pump