1 AMS-02 TRD Status Report Stefan Schael RWTH Aachen TIM Meeting, CERN, June 2001 TRD meeting: Wednesday 16:15 in room 13-3-005 !!!

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

F.R.Spada – INFN Rome I The TRD of AMS-02 on the International Space Station Francesca Spada University of Rome La Sapienza & INFN Rome I for RWTH Aachen,
CBM Calorimeter System CBM collaboration meeting, October 2008 I.Korolko(ITEP, Moscow)
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Status of the ATLAS MM project
Performance of AMS-02 on the International Space Station DESY Theory Workshop, Hamburg Melanie Heil Supported by the Carl-Zeiss Foundation.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
Construction and quality control of the end-cap Transition Radiation Tracker for the ATLAS experiment Vasiliki A. Mitsou CERN HEP 2003, April, Athens,
LCG Meeting, May 14th 2003 V. Daniel Elvira1 G4 (OSCAR_1_4_0) Validation of CMS HCal V. Daniel Elvira Fermilab.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
The AMS Transition Radiation Detector and the Search for Dark Matter Gianpaolo Carosi Lab for Nuclear Science, MIT The AMS Collaboration Lake Louise Winter.
UG-crate status AMS TIM - CERN - 15/4/2008 A.Bartoloni, B.Borgia, F.R.Spada* INFN Roma.
1 PEBS Prototype PERDaix was launched in October 2010 from Kiruna, Sweden.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
AMS-RICH Detector. J. Berdugo – CIEMAT (Madrid, Spain) 1 AMS-02 Phase II Flight Safety Review AMS Ring Imaging CHerenkov PURPOSE: 1.Precise measurement.
Status of NA62 straw electronics Webs Covers Services Readout.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
JINR-BMBF Workshop, Dubna Clemens Adler PI Heidelberg ALICE TRD Transition Radiation Detector Overview and Status Clemens Adler Physikalisches.
1 AMS-02 Integration & Test Plans & Status Ken Bollweg/NASA John Heilig/JS Robert Becker/MIT 12 January, 2007 AMS JSC.
First Results from the NA62 Straw Spectrometer E uropean P hysical S ociety 2015, Wien Vito Palladino - CERN On Behalf of NA62 Collaboration.
AMS TRD meeting Electronics 17th July 2002, CERN G. Schwering: Overview M. Capell: Crate Mechanics/Arrangement W. Karpinski: Front End – Status C.H. Chung:
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
Precision Drift Chambers for the ATLAS Muon Spectrometer
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
The DAMPE STK G. Ambrosi INFN Perugia. The DAMPE Detector Mass: 1480 Kg Power: 600 W Data: 16 Gbyte/day Liftime: 5 years 2.
Application of Large Scale GEM for Digital Hadron Calorimetry Jae Yu For GEM DHCAL Group June 11, 2011 TIPP 2011 The Goals 30cmx30cm 2D readout with KPiX.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
Christian Lippmann (ALICE TRD), DPG-Tagung Köln Position Resolution, Electron Identification and Transition Radiation Spectra with Prototypes.
TRD Electronics Flight Production Wim de Boer, Kai Gassmann, Florian Hauler, Andreas Sabellek, Mike Schmanau IEKP - Universität Karlsruhe (TH)
AMS TIM & General Meeting TRD Integration Status Report Th. Kirn I. Phys. Institute B, RWTH Aachen Houston, 23rd October 2007.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Shashlyk DAQ and FEE Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA DAQ and FEE Workshop, Rauischholzhausen Castle.
FWD Meeting, Torino, June 16th, News from Cracow on the forward tracking J. Smyrski Institute of Physics UJ Tests of CARIOCA and LUMICAL preamplifiers.
PEBS: Positron Electron Balloon Spectrometer Henning Gast I. Physikalisches Institut B RWTH Aachen DPG07 – 6 March 2007.
PEBS: Positron Electron Balloon Spectrometer Henning Gast I. Physikalisches Institut B RWTH Aachen 30 th International Cosmic Ray Conference – Merida,
PEBS: Positron Electron Balloon Spectrometer Henning Gast
The drift chamber with a new type of straws for operation in vacuum
Alignment of the CMS Tracker
Experimental Method: 2 independent detectors on both sides of IP
The Transition Radiation Detector for the PAMELA Experiment
IFR Status Summary W. Baldini on behalf of the IFR Group
The Beam Test at Fermilab:
Mini-drawers, FE-ASIC , Integrator
Overview of the Frascati Production Facilities
F.Guber, A.Ivashkin INR, Moscow

AMS 02 Electronics TRD Crate Arrangement
ScECAL+AHCAL+TCMT Combined Beam FNAL
RPC Detector Control System
Experimental Method: 2 independent detectors on both sides of IP
RPC Detector Control System
Presentation transcript:

1 AMS-02 TRD Status Report Stefan Schael RWTH Aachen TIM Meeting, CERN, June 2001 TRD meeting: Wednesday 16:15 in room !!!

2 TRD Mechanics Octagon Production: 8 panels produced at FVT Aachen machined at IPT, RWTH Aachen glued together at Physics AC-I Bulkhead Production: 6 panels produced at FVT Aachen machined at IPT, RWTH Aachen integrated at Physics AC-I Production Status: EM produced QM in production FM expected for Spetember 2001 Production Status: EM in production QM expected for August 2001 FM expected for September 2001

3 TRD assembly Mechanical accuracy (100  m) of the octagon structure will be verified with a 3D coordinate measuring machine in Aachen. TRD assembly in a clean room with temperature (+/- 1°) and humidity control Test of the full TRD in Aachen on a cosmic stand.

4 TRD Module Production I Production scheme: Straws and stringers are glued together at FVT, Aachen Wire feed through, wire crimping, endpiece assembly and all tests at Physics AC-I Production status: Clean room at FVT ready for mass production the first 2 m long chamber has been produced  EM. feed through of the wires was no problem wire tension has been measured and is well within the specifications

5 Wire tension measurements

6 Gas Gain Measurements

7 Long Term Teststand Study the long term behavior of straw modules m long straw modules, i.e. one gas group operated with Xe/CO2 (80%/20%) in a vacuum vessel use a mass spectrometer to measure the leak rate use a recirculating gas system (P. Fischer, MIT) as for the TRD on the ISS

8 TRD Module Production: Next Steps produce 4 modules (1.4 m long) for space qualification i.e. vibration test, acoustic test, thermo vacuum test, EMI test produce 8 modules (1.8 m long) i.e. 1 gas group for the long term test we expect to start the mass production in September 2001.

9 The fleece material (LRP 375 BK) has been produced and cut to the required width by Freudenberg We have started to cut the radiator to the appropriated length Cleaning of the radiator has also started at the Institute for Organic Chemistry of the RWTH Aachen. We expect to have all radiator material ready for TRD assembly by October 2001 TRD radiator

10 TRD  Upper TOF Combined Thermal Control TOF Power  TRD Power  20 Watt TOF & TRD connected to the same M-Structure Contract has been placed with OHB & CGS

11 Radiative link between the PCB‘s (UFE boards) and the radiator: Next step: TOF & TRD in the same MLI volume

12 First results from the TRD thermal model:

13 TRD temperature monitoring

14 TRD Electronics I

15 60 qualification boards build and tested - no failure - typ. leakage current: < 0.3 nA at 2000V (at room temperature, in air atmosphere, 1 bar ) Thermal cycles performed on 10 qualification boards (-30°C, +60°C) - no change in behaviour Vibration tests executed on 10 qualification boards - no change in behaviour Production of 350 flight boards started Status of the UTE Board

16 Status of the UFE Board Prototype of UFE Board build and tested - full functionality at the readout speed of 1 channel/1 µs - measured noise ~ 5500 electrons Next steps - design, production of qualification boards, with final el. circuit and final board shape

17 TRD Crate MIT/Aachen I => CAENCSIST EMQM 1 QM 2 FMSMTotal crate UPD DC/DC100 LV HV UBP UPSFE UDR JINU UHVG UPC12-42AC III

18 TRD Test Beam Results I 20 layer TRD detector in the test beam at CERN in 2000 we have recorded 3 million events providing signals for protons, electrons, muons and pions at energies from GeV Muon events have been used for an intercalibration of the individual straws to a relative accuracy of 2%.

19 TRD Test Beam Results II The TRD fulfills the specification of: proton rejection < 1% at an electron efficiency of 90% up to 260 GeV

20 TRD Test Beam Results III Likelihood method much more effective for pion rejection than cluster counting Result probably still dominated by pion contamination => it is still an upper limit !!!

21 Summary since Houston we have made a lot of progress on: TRD straw module production and test stands TRD electronic, thanks to M. Capell and R. Battiston TRD thermal control TRD MC simulation the TRD is well within schedule TRD mass budget (378 kg) and power budget (20 Watt) has not changed. test beam results show that the performance to the TRD is well within specifications