Raw materials storage Pre Wet Hall Phase 1 Hall bunkers Filling Hall Emptying Hall Blocking Hall Phase 2/3 tunnels Straw.

Slides:



Advertisements
Similar presentations
High performance; from 1 metric ton to 100 metric tons instant purification facility per hour, 2400tons per day Low energy consumption (25 kw/h – 38 kw/h)
Advertisements

Oil Bioremediation Products. Who are Oil Technics? Over 30 years experience Based in Aberdeenshire, Scotland Manufacturer & supplier of innovative specialist.
COE RAC SECTOR ITI UTTARSANDA
Laddomat 21 For accumulation when using a wood-fired boiler Picture 1
Wastewater Management at an Animal Protein Rendering Facility J.B. Hess, W.A. Dozier, J. Spann and B. Thomas Poultry Science Department, Auburn University.
USER MAINTENANCE.
REFRIGERATION Refrigeration may be defined as the process of removing heat from a substance under controlled conditions and reducing and maintaining the.
Jack Moody Holdings plc landscapingrecyclingcivil engineering.
Waste Water Treatment (Sewage Treatment)
Oyster mushrooms are grown from mycelium (threadlike filaments that become interwoven) propagated on a base of steam-sterilized cereal grain (usually.
ROT Rotating incinerator with a patented ”near to zero” emission filter All data within this presentation is according to the European norms 2000/76/CEE.
1. 2 Family/Community Involvement Health Education Health Promotion for Staff Healthy School Environment Health Services Physical Education Counseling,
Components of HVAC System
1-800-CIRCLE-Awww.circlearanch.com Circle A Feeders develops all their cattle under roof to protect them from environmental stressors. The feeding facility.
Cold-Plus™ Refrigerant Enhancer
Welcome to Disley Tissue. A brief history cotton mill built on current site Mid 19 th century - developed into a coated paper manufacturer 1993.
Building Methods Types of Structure.
How do we feed 9 Billion People Food security Declining arable land Loss of water resources Declining nutrient and mineral content Climate change Vertical.
Drug Delivery & Tissue Engineering Laboratory
Brier Hills Recycling Ltd have been established since 1999 when composting operations started. One of the major organic waste processing facilities in.
SANITECH CORPORATION One step chemical free sanitation solution.
Clean Water for Everyone Biofilter Project Presented on November 14, 2005.
Environmental Products and Technologies Corporation Selective Inc. Environmental Consultants Environmentally Superior.
STEAM CONDENSERS.
Turning Urban Waste into Valuable Resources Trevor Ward CTO CSIRO WtE ©2014 AnaeCo Ltd 1.
ISAT Module III: Building Energy Efficiency
Concrete Construction
Steam Power Station Presented By Ashvin G. Patel Asst. Prof. (E.E.)
STILT GROUP Water Treatment Systems & Innovations.
Diesel Power Plant Mr.B.Ramesh, M.E.,(Ph.D) By
Backyard Composting. Why Compost? Recycle waste materials Enhance soil structure Reduce soil losses from erosion Improve oxygen availability in soil Increase.
Carcass Disposal Composting. ●Carcasses layered with organic material – Thermophilic microbes – Heat generation – Accelerates biological decomposition.
How to produce Sauerkraut…???
Eco Sustainable Solutions Ltd New Waste Technology – Street Sweeping Plant.
Heat Transfer Equations For “thin walled” tubes, A i = A o.
James River Correctional Center Department of Agribusiness and Enterprises S.V. Pruett, Warden.
WATER POLLUTION.
Recycling involves processing used materials into new products in order to  prevent waste of potentially useful materials  reduce the consumption of.
*Compost is a mixture of decayed organic materials decomposed by microorganisms in a warm, moist, and aerobic environment, releasing nutrients.
1 Fundamentals of On-Farm Composting Dr. Tom Glanville Agricultural & Biosystems Engineering Iowa State University.
Unit VIII Post stocking management. INTRODUCTION This phase includes the activities to be undertaken from stocking of fingerlings up to the final harvesting.
Anti – Odour & VOCs Environmental Protection with The Bio-Trickling Filter Technology Daega Powder Systems CO., LTD CHEON-AN.
Poultry Housing ERT 352 Farm Structures.
Islamic university – GAZA Engineering faculty Industrial Engineering department Prepared by: Moutasem M. Al-Bayouk 12006/1580.
Solar Lumber Kilns Jake Altemus. The Sun  Provides huge amounts of “low intensity energy” (Wengert and Oliveria)  Really Dispersed.
HARVESTED FORAGES Silage
The Process of Milk Production
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
Production of filters for filtration of crude oil and for process bleaching, winterization in edible oil industry. Design and manufacture of equipment.
Matt Smith, PhD Student in Natural Resources and Dr. John Aber Financial support from Hatch NH00605 and.
Waste Water Treatment. Assignments Draw, label and explain each step in the wastewater treatment process.
HEAT-GENERATING EQUIPMENT INTRODUCTION SELECTION EFFICIENCY FURNACES BOILERS CENTRAL HVAC SYSTEMS.
Best Practice Chip Delivery, Storage & Handling And The Importance of Fuel Quality Nick Gough RTS Ltd Woodfuel Manager.
Content 1.The main flowchart and technology 2.Advantage and disadvantages of each technology, way to improve. On-Nuch disposal site Group Member: Lu Li.
40 YEARS OF PRODUCT EXCELLENCE AND SUPERIOR CUSTOMER SERVICE
Maturing and cold smoking
Update on the PSB Cooling and Ventilation Systems
Waste Water Treatment.
 II THE ADVANTAGES OF ELECTRICITY
UBSUP - DTF project - KENYA Operation of a Co-composting facility
Powdered Milk Plant Design
THAWING INSTALLATION.
INTENSIVE COOLING INSTALLATION
FRESH Fruits & Vegetables are a part of our daily diet.
Cast in Place 2 way Flat slabs Basically joists in both directions
UBSUP - DTF project - KENYA Operation of a Co-composting facility
ICE CREAM Mrs. Schrewe August 25, 2017
CTC 450 Review Secondary Treatment Trickling Filters Biological Towers
Welcome To Our Presentation 1. Topic Name Transfer Stations and Transport, Ultimate Disposal Methods 2.
INTRODUCTION The procedure involves isolation, mass culture production and preparation of inoculants along with inoculant quality control. The individual.
Presentation transcript:

Raw materials storage Pre Wet Hall Phase 1 Hall bunkers Filling Hall Emptying Hall Blocking Hall Phase 2/3 tunnels Straw

Elf Farm Supplies Pty Ltd About Us  Phase II and III is serviced with chillers and cooling towers which supply 2700kW of cooling capacity.  Compost is initially levelled to a consistent temperature then  After bale wetting, the bales are transferred into the Prewet Shed. Bales are broken and mixed with other ingredients using a Mobile Blender. Water is also added through this mixing process.  The ricks are turned, blended and water added to further promote the composting process over the following days.  Fresh air is supplied through air pipes underneath the ricks to keep the process aerobic. This method was first developed at the Elf Farm Supplies site and is now standard industry practice throughout the world.  The roof of the Prewet Shed is constructed of wood and fastened with stainless steel nails. This is due to the high ammonia environment which corrodes metal but preserves wood. Phase I  As in the Prewet Shed, fresh air is supplied through air pipes underneath the bunkers to control compost temperatures and oxygen levels and keep the process aerobic.  The compost is blended a number of times and has water added to adjust the moisture content.  Exhaust air is passed through a Bioscrubber and discharged up the stack. Strict odour control practices are in place to meet our EPA licence conditions. Phase II heated for 8 hours to pasteurise the compost. Phase II is designed to kill unwanted pathogens and to create an ideal nutrient and bio- logical medium for mycelium development. After pasteurisation, the compost is conditioned at 45 to 50 degrees Celsius for 3-4 days. Phase III Pre-Wet  Bales are pre-wet and allowed to heat up to remove the waxy layer from the straw and to initiate the composting process.  Phase II and III comprises 22 tunnels which are each 40 metres long and 4 metres wide. A chamber located underneath the concrete slat floor enables circulation of air up through the compost in each tunnel.  Phase I compost is loaded into the tunnels using a cassette filler which is a system of conveyors that extend into the tunnels.  The compost is placed on top of a pulling net, which enables subsequent removal from the tunnel.  Each tunnel holds up to 200 tonnes of Phase 1 compost that will finally reduce to 150 tonnes of Phase 3 compost.  The Phase II process is computer controlled using fresh and recir- culated air to control compost temperatures and oxygen levels.  Each tunnel has a dedicated air intake and fan system. Air is passed through a series of filters to remove particles down to 4 mi- crons absolute. Filtration is important to prevent the introduction of competitor species.  After Phase II is complete, the Phase III process commences which involves the addition of spawn to the compost.  This operation is undertaken following intensive cleaning and disinfecting. It is imperative that “sterile” conditions are created to prevent infection of the compost with unwanted pathogens that can impede mushroom growth.  Phase II material is removed from the tunnel using a pulling winch, inoculated with spawn and returned to another tunnel using a cassette filler.  The Phase III process is fully computer controlled to create environmental and biological conditions that maximise mushroom mycelium development.  Phase III material is removed from the tunnels using a pulling winch.  Some Customers require the addition of a protein supplement during ship out. The supplement is added at nominated rates during the transfer from the tunnels to the trucks/blocking line.  White Prince trailers with the capacity to carry 25 tonnes each are used to transport compost to farms in bulk. Each trailer is fitted with a walking floor and a conveyor to transfer material to unloading conveyors located at the farms. Load time is only 12 mins. Phase III Blocks  Some of the Phase III compost is then manufactured into blocks.  The length of the process from commencement of Pre-wet to ship out is approximately 6—7 weeks. Mushroom harvesting com- mences a further two weeks after delivery to the farm. Compost Production Process Elf Farm Supplies Pty Ltd was established at it’s present site at Mulgrave in We are proud to be a wholly owned Australian Company. Since 1990, Elf Farm Supplies has expanded rapidly. With the environmental and economic pressures placed on the industry, new and innovative ways of producing mushroom compost have been tested and implemented. Today, Elf Farm Supplies is one of the leading compost producers in Australia. We are the largest agricultural enterprise in the Hawkesbury and the only supplier in the Sydney region. Our products are supplied throughout Australia and are integral to the success of the Australian Mushroom Industry.