PIPE CULVERT By CH. VENKATARAMAIAH.

Slides:



Advertisements
Similar presentations
Material Selection Central Office Hydraulics
Advertisements

BOX PUSHING TECHNOLOGY
Chp12- Footings.
2013 C&MS Section 500- Structures Changes from 2010 to 2013 Construction and Materials Specifications in Structures Items.
Timber Wall Framing Class Exercise 2.
Materials used for pipes: Sewers are made from: 1- Concrete 2- Reinforced concrete 3- Vitrified clay 4- Asbestos cement 5- Cast iron (lined with cement).
DUBLIN PORT TUNNEL CONSTRUCTION CHRIS PAGE & THOMAS SMITH 19/03/2009 H24GGY GEOLOGY FOR CIVIL ENGINEERS Dublin Port Tunnel Project.
GROUNDWATER CONTROL.
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
WELCOME to the GROUP SABARI of AEEs of 2008 BATCH
WALL FRAMING Section 6 of AS 1684 relates to the regulations governing timber wall construction.
The development of floors After the foundations have been completed and the external walls constructed the construction of the floors commences. There.
ONE-WAY SLAB. ONE-WAY SLAB Introduction A slab is structural element whose thickness is small compared to its own length and width. Slabs are usually.
تم تحميل الملف من
FACTORS AFFECTING THE COST VARIATION. PRESENTATION STRUCTURE External Development Works External Development Works –Civil Works –Plumbing Works –Electrical.
ENGINEERING DESIGNS-CANAL STRUCTURES GENERAL DESIGN PRINCIPLES
Issues to be considered :foundations Professor Chris Gorse and Ian Dickinson These slides should be read in conjunction with Emmitt, S. and Gorse, C. (2010)
The Good, the Bad, and the Ugly 2 May 2008 Sacramento, CA Alan Macnab
UNIT-I STANDARD SPECIFICATION FOR ROAD BRIDGE
Slab Design.
CONSTRUCTING A FIVE CABIN LATRINE
REINFORCED EARTH STRUCTURES CONCEPT BASICS OF DESIGN CASE STUDIES.
2013 Section Engineer’s Meeting.  Correct Type, Gauge, and Coating (Standard Drawings)  Based on Pipe Diameter, Fill Height & Soil pH  Obtain copy.
Footings.
COLUMNS. COLUMNS Introduction According to ACI Code 2.1, a structural element with a ratio of height-to least lateral dimension exceeding three used.
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
Rock Chute Mike Cox State Conservation Engineer Contractor Certification Training March 2008.
UNIFORM FLOW AND DESIGN OF CHANNELS
MEASURING FLUMES By CH. VENKATARAMAIAH.
Lec.16 Underground pipeline irrigation system - structures for underground pipelines.
Plain & Reinforced Concrete-1 CE-313
Hydraulic Engineering
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
Procedures in Modern Road Construction I. Development of Ancient Roads 1. Great civilizations throughout history enhanced road building. 2. Cross-section.
Chapter C Cross Section (ANSWERS )
Timber Wall Framing Class Exercise 1.
Specification & Quantities Estimating Lecturer Maha Muhaisen College of Applied Engineering& Urban Planning.
Framing the House. Platform Framing Platform framing.
FRAMING SEMINARS 2012 PRESENTED BY KW ENGINEERING 1.
JSC CTC Metallokonstruktsiya Corrugated structures.
PRESENTATION ON WATER COOLING TOWER
6- Calculation of shear stress at composite interface: A)Under service load: Strain and stress distributions across composite beam cross- section, under.
Leads Institute of Technology & Engineering Subject Code : Name Of Subject :Building Construction Name of Unit : Concrete Topic : Plain Concrete.
SANKALCHAND PATEL COLLEGE OF ENGINEERING,
Prof. Shrikant M. Harle Asst prof. Dept of Civil Engg PRMCEAM
Mahatma Gandhi Institute of Technical Education & Research Centre
Modernization of Track for High Speeds. Modernization Transport more passengers/goods at high speed, safe, economic.
PRESENTATION ON RESOURCE EFFICIENT BRICKS & FLY-ASH FILLING IN IIT ROPAR PROJECT by Er. Gopal Varshney S.E., CPWD CPWD, IIT ROPAR, PUNJAB.
5. FERROCEMENT.
SHREE SWAMI ATMANAND SARASWATI INSTITUTE OF TECHNOLOGY,SURAT-6
Sanitary Engineering Lecture 10 Revision
1. SALIENT FEATURES OF ARCH BUTTRESSES CHECK DAM 1)Horizontal thrust of water is resisted by the arch action of the arches which uniform transfer the.
REINFORCED EARTH STRUCTURES
CIVL471 DESIGN OF RC STRUCTURES
DESIGN AND CONSTRUCTION GUIDELINES
UNIFORM FLOW AND DESIGN OF CHANNELS
MODULE 4 BUILDING MATERIALS.
(i) proper arrangement of reinforcing bars and
G.GUNA….SRVEC DEPARTMENT OF CIVIL ENGINEERING
SeminAR ON LINTELS --SANTHOSHKUMAR.M..,.
FOR 5TH SEMESTER DIPLOMA IN CIVIL ENGINEERING
Building Construction I Sofia Sebastian 1
Course Contents Culverts Bridges Buildings 20 November 2018.
Framing the House                                                                                                                   
Building Construction I Sofia Sebastian 1
American Concrete Pipe Association Short Course School 2014
Fabric form concrete and paraweb system
History of Design Methodology
FBE05 – Mathematics and Statistics
TECHNICAL SPECIFICATION AND REQUIREMENTS
Presentation transcript:

PIPE CULVERT By CH. VENKATARAMAIAH

(1) A pipe culvert is normally proposed where a canal with a discharge of 1 cumec to 1.5 cumec crosses the village/ Z. P / R & B roads. In case the number of rows of pipes exceeds ‘2’ the pipe culvert may not be economical. In such cases the slab culvert may be economical. The culvert shall be with full formation width of road as per IRC recommendation.

(2) Pipe (i) Maximum & Minimum diametre of pipe: The maximum diameter of pipe should be 1200 mm and minimum diameter should be 750 mm. It shall be designed to function as partially flowing with the velocity not more than 2 times the normal canal velocity. (ii) Class of pipe: NP3 class (reinforced concrete, medium – duty, non pressure pipe), conforming to I.S 458 – 2003 / 1988.   (iii) Minimum Earth cushion: Minimum earth cushion over the pipes shall be 600 mm.

(3) Bedding:   Irrespective of load coming on the pipe, they shall be bedded in a cradle constructed of concrete having mix not leaner then M 15 grade. Thickness of concrete below the pipe should be ¼ th of internal diameter of pipe and on the sides the concrete should extend to ¼ th of external dia. Figure A Figure A

Where bed rock or boulders strata is met with at the pipe invert level, the excavation shall be taken down at least 200 mm below the bottom of pipe. The bed shall be cleared and the space shall be filled with well graded sand or granular material free from stone or fragmented material, shaped to the requirement and thoroughly compacted to provide adequate support for the pipe Figure B.   Figure B

(4) Trench:   As per Para IS 783 – 1985 page 373 of the specifications for road bridge work, trench shall be of sufficient width to provide a free working space on either side of the pipe. The working space shall be preferably not less than 150 mm and shall not be more than one third of the dia of pipe.

The minimum clearance between the pipes shall be at least half the diameter of the pipe subject to a minimum of 450 mm. Trench shall be kept free from water until the pipes are installed and the joints have hardened Figure C.   Figure C

(5) Jointing:   The pipes shall be joined by the collar joints. Collars shall be of R.C.C, 150 mm or 200 mm wide having same strength as the pipes to be joined. Caulking space shall be between 13 to 20 mm according to diameter. Caulking material shall be cement and sand in the ratio of 1:2.

(6) Vent way:   Area of pipe = Q/ 2 x Vn where Q = discharge of canal, Vn = normal velocity in the canal. Select the pipe diameter, more than canal F.S.D so that there is partial flow in the pipe. If it requires more than two pipes, go for slab culvert. The partial flowing pipes area is calculated with the help of table given below. a = Ca d2 where a = area of partial flowing pipe Ca = value as per table d = dia of pipe , D = depth of water

D/d Value of Ca 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09 0.0 0.0000 0.0013 0.0037 0.0069 0.0105 0.0147 0.0192 0.0242 0.0294 0.0350 0.1 0.0409 0.0470 0.0534 0.0600 0.0668 0.0739 0.0811 0.0885 0.0961 0.1039 0.2 0.1118 0.1199 0.1281 0.1365 0.1449 0.1535 0.1623 0.1711 0.1800 0.1890 0.3 0.1982 0.2074 0.2167 0.2260 0.2355 0.2450 0.2546 0.2642 0.2739 0.2836 0.4 0.2934 0.3032 0.3130 0.3229 0.3328 0.3428 0.3527 0.3627 0.3727 0.3827 0.5 0.3930 0.4030 0.4130 0.4230 0.4330 0.4430 0.4530 0.4620 0.4720 0.4820 0.6 0.4920 0.5020 0.5120 0.5210 0.5310 0.5400 0.5500 0.5590 0.5690 0.5780 0.7 0.5870 0.5960 0.6050 0.6140 0.6230 0.6320 0.6400 0.6490 0.6570 0.6660 0.8 0.6740 0.6810 0.6890 0.6970 0.7040 0.7120 0.7190 0.7250 0.7320 0.7380 0.9 0.7450 0.7500 0.7560 0.7610 0.7660 0.7750 0.7790 0.7820 0.7840

(7) The road level should be at the Road level / G (7) The road level should be at the Road level / G.L/ TBL whichever is higher. 300 mm thick P.C.C slab shall be provided over the pipes with 75 mm wearing coat in M 20 with 6 Ф at 200 c/c both ways at top & bottom.

THANK YOU