Increase in axle load of freight wagons. CC +8 +2 LOADING In order to enhance throughput to meet increasing traffic demands, Board has permitted running.

Slides:



Advertisements
Similar presentations
Terje Andersen 06 May 2011 Analysis of past derailments Information from data bases, investigation reports and surveys.
Advertisements

Gavin Astin/ Terje Andersen 06 May 2011 Survey of Existing measures.
THE MAINTENANCE STRATEGY AGAINST ROLLING CONTACT FATIGUE University of Belgrade, Faculty of Civil Engineering University of Belgrade, Faculty of Transport.

Improving track design to reduce life cycle costs А.J. Abdurashitov Branch Manager of OJSC VNIIZHT, Ph.D. VNIIZhT (OJSC “Russian Railway Transport Research.
WEAR OF RAILS Engr. Muhammad Hussain.
1 Union Pacific Railroad David Wickersham Chief Engineer, Western Region February 24, 2014.
Smart Sensor Technology For Rail Network health Hawk Measurement Systems.
IR-UIC-GRFC-22/ DELHI DO NOT USE WITHOUT PERMISSION OF AUTHOR AND IR 1 INTRODUCTION OF HEAVY AXLE LOAD OPERATION ON INDIAN RAILWAYS PresentationBy.
Schedule of Dimensions And Track & Bridge Structure for Dedicated Freight Corridor adhpm.
TRACK FITTINGS AND FASTENINGS
A new Concrete Tie design Created by Rudy Niederer.
October 2008 International Rail Safety Conference 2008 Denver, Colorado, USA.
SKV welds - limitations Fatigue life only 50 % of Rail Skill of welder very important Quality control difficult Heating Tapping fusion The Age of weld.
RAIL CRC 1 A/Prof Alex Remennikov University of Wollongong, NSW Australia International Concrete Crosstie & Fastening System Symposium Research on Railway.
Track maitenance Practices on Heavy Haul routes of Foreghin Railways and Suggestions for IR.
INTRODUCTION i)Increased transportation capacity due to growth in economy ii)Strategies adopted by IR to meet the demand iii)Need for 30 tones axle load.
Sleepers A Presentation on Department of Civil Engineering,
Guidelines for Traffic Control at Surface Mines
Japan’s Efforts to Ensure Safety of Railways October 12th, 2010 Railway Bureau MLIT.
Track for High Speed Trains on IR Challenges Ahead –An Overview Onkar Singh CE/Co-ord/N.E.Railway.
General Design Guidelines
HEAVY AXLE LOADS ON SHORT LINES AND REGIONAL RAILROADS Georgia Railroad Association 5 th Annual Transportation Conference 5 th Annual Transportation Conference.
Sleepers and fastenings (N.R. Kale ).
HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.
INTRODUCTION OF HIGHER AXLE LOADS ON INDIAN RAILWAYS
INTRODUCTION 1 What word comes to your mind to describe “ The attempt by two objects to occupy the same space at the same moment in time”
Frequency analysis and scenario development
TEST TRACK FOR INDIAN RAILWAYS
FAILURE ANALYSIS Sources of failure - - Sources of failure - - Material Related Failures. Deficiency in Design. Service Related Failures. Environmental.
INDIAN RAILWAY VISION CAPACITY CREATION BY More than 30,000 kms of route would be double / multiple lines (compare to around 18,000 kms today).
Maintenance of LWR/CWR
High strength materials are being increasingly used in designing critical components to save weight or meet difficult service conditions. Unfortunately.
Dedicated Freight Corridor By CHAHATEY RAM CBE/ER.
STANDARD MOVING & FIXED DIMENSIONS FOR DEDICATED FREIGHT CORRIDOR.
EURAILSPEED - Milano – November 8th, 2005 MGV SNCF Train Set for on-board Measurement at Great Velocity Eric REBEYROTTE– Technical Manager of SNCF Engineering.
DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES
RAILER SMS Track Inspection Version
Detector Derailment Device (&) Frenado (Braking) Automatic Train
DESIGN AND IN-SERVICE INSPECTIONS Guy BAYLAC Technical Advisor to EPERC TAIEX Workshop, Working Group 4 Bratislava – 12 April 2005.
MECHANISED BALLAST CLEANING DYNAMIC TRACK STABILISATION & UNIMAT
USFD BZA USFD BOOKLET.
CRS SANCTIONS Chetan Bakshi, CRS/Central. WHY CRS SANCTION IS REQUIRED ? Section 21 & 22 of Railway Act 1989 stipulates that “ No Railway should be opened.
DESTination RAIL Decision Support Tool for Rail Infrastructure EU Project No Railway Pro Investment Summit Building the New CEE Railway Economy.
TRANSPORTATION ENGINEERING - II. UNIT MARKS QUESTION 1.What are the type of rails tried so far in construction of railway track? 2.Define guage.
REVISED PROFORMA FOR MEASUREMENT OF POINT & CROSSING
UNIT IV TRACK CONSTRUCTION. POINTS AND CROSSINGS Point and Crossings are peculiar arrangement used in permanent way to guide the vehicle for directional.
INFRASTRUCTURE DEVELOPMENT CONSULTANTS Review of the East Africa Railways Master Plan Peter Kieran CPCS Transcom Limited March 11, 2010.
Modernization of Track for High Speeds. Modernization Transport more passengers/goods at high speed, safe, economic.
CE UNIT 1  Maintenance is the act of keeping something in good condition by checking or repairing it regularly.
IS:800 Section 13 FATIGUE. Introduction Mechanism of Fatigue Fracture Factors Affecting Fatigue Strength Design Strength & Cumulative Fatigue Damage IS:800.
Geometric Design of Railway Track
2 ASPECTS: -Use of better designed, ICF coaches with better springing arrangements. -Better breaking system for safe and smoother rail travel. -Use of.
Reactive to Proactive Approach to Track Maintenance on Indian Railways
Today´s Challenges of the Rail Infrastructure Industry
CHALLENGES IN DESIGN & MAINTENANCE FOR MIXED TRAFFIC REGIME ON IR
Sustainable maintenance of high-speed lines with mixed traffic
COMPACTION BY EQUIPMENTS
Internal Safety Organisation (ISO)
REPAIR AND REHABILITATION OF STRUCTURES
THE PROCESS OF CRACK INITIATION AND ITS PROPAGATION
USFD VIJAYAWADA DIVISION.
Maintenance of Track carrying HAL - Deep Screening
UIC 518.
Maintenance Strategies for Turnouts
ULTRASONIC TESTING OF RAIL
RAILWAYS, BRIDGES & TUNNELS
Flexible pavement design
CHAPTER THE TRACK.
UNIT I – RAILWAY PLANNING. PERMANENT WAY A System of rails fitted on sleepers which rest on ballast and everything supported by a sub- grade is known.
Presentation transcript:

Increase in axle load of freight wagons

CC LOADING In order to enhance throughput to meet increasing traffic demands, Board has permitted running of BOXN & BOXNHS wagons loaded up to CC+8+2(axle load of 22.82t) at maximum permitted speed of 60 kmph on identified iron/other ores routes w.e.f. May,05 as a pilot project for a period of one year initially (currency of the project has been extended up to June,08). Initially,16 routes were identified for such operation. Gradually, more routes were cleared totaling to 34 routes up to March,07 on ER, SER, SCR, SWR, ECoR, SECR, SR & WCR as per list in the annexure I. However, a number of precautions and monitoring mechanisms have been prescribed for these trains.

CC +6+2 LOADING To achieve further augmentation in throughput, Board has approved universalisation of running of CC+6+2 t loaded BOXN,BOXNHS,BOBR,BOBRN,BCN, BCNA, BCNAHS & BOST wagons for carrying coal,cement,rice,sugar etc. at maximum permitted speed of 60 kmph, except some sections where it will be restricted. Restricted sections are given at Annexure II. In case of emergencies such as accidents etc. running of CC+6+2 loaded wagons in some restricted sections can be permitted. This shall be done at the level of PCE, who will advise suitable speed restrictions keeping in view the condition of fixed infrastructure. The precautions and monitoring prescribed for these sections are essentially similar to those prescribed for CC+8+2 axle load.

Precautions and Monitoring Mechanisms –Installation of electronic in-motion weigh-bridges at loading points to stop overloading. –Installation of adequate number of Wheel Impact Load Detectors (WILD) for recording of loading spectrum passing over track. –Ultrasonic testing of rails for detection of gauge corner cracks. –Quarterly review of the project by a multidisciplinary committee comprising of PHODs under GM of Zonal Railway. –Monitoring of defect generation rates in rails and welds based on USFD testing. –Monitoring systems to be installed at identified Bridges. –More frequent track recording to monitor track geometry.

Important technical parameters i)Track structure: Minimum 52/60kg 72 UTS rails, sleeper density M+7 and depth of ballast cushion 250mm with a clear cushion of 100mm for running of these freight trains at maximum permissible speed of 60 Kmph. In case of 90R rails, maximum speed permitted shall not exceed 30 Kmph. ii)Bridges: Mostly of BGML standards are available on these sections.

Specific items for action,monitoring & recording observations TRACK i)90R rails should be replaced expeditiously as possible. While renewing rails, rails of 90 UTS may be used from overall economics consideration as rail life will get shortened due to increased stresses. ii)Similarly, while replacing sleepers, sleeper density of 1660/km may be provided. iii)Ballasting will have to be given thrust. iv)Structural integrity of fastenings has to be ensured especially rubber pads.

Specific items for action,monitoring & recording observations v). As a good maintenance practice,it may be desirable to destress LWRs twice every year, once before winter and again before summer especially in Zone III & Zone IV. Behaviour of LWRs would have be watched critically and data collected.

Specific items for action,monitoring & recording observations (Contd.) vi) Due to increase in lateral forces on curves, increased deterioration in lateral alignment would occur. Hence, curves may have to be inspected more frequently.

Specific items for action,monitoring & recording observations (Contd.) vii)Due to increased bogie rotational resistance, rail-wear on curves will increase. Rail profile would be required to be monitored to understand rail-wear pattern. On curves, increased angular wear may be dangerous and need to be watched. The observations of rail wear will be useful in decisions for rail replacement.

Specific items for action,monitoring & recording observations (Contd.) viii) Due to increased load,rolling contact fatigue (RCF) defects viz. head checks & gauge corner cracking would occur resulting in more rail failures. USFD examination of rails at more frequent interval would be required to be done. As a preventive measure, rail grinding will be helpful to eliminate such defects.

Specific items for actions,monitoring & recording observations (Contd.) ix) Rail/wheel impact forces due to defects in the rail/wheel surface, viz. dip at rail joint, cup formation in AT welds, flat tyres, out of round wheels will increase damage to rail-heads, fishplates, bolt-holes and fish-bolts, sleepers & ballast. These will cause increased deterioration in track geometry. Since the track is going be overstressed, Wheel Impact Load Detectors should be installed at suitable locations to prevent further overstressing.

Specific items for action,monitoring & recording observations (Contd.) x) Rail corrugations may develop due to high dynamic forces. These would have to be monitored and if necessary, rail grinding may be done to eliminate the same.

Specific items for action,monitoring & recording observations (Contd.) xi) Points & crossings maintenance activities will get increased viz. packing, correction to alignment/level, replacement/ reconditioning of switches & crossings. Due to increased bogie rotational resistance, the increased lateral forces may increase the tendency of derailment on a weak turn-in/turn-out curve, by gauge spreading. Thus, P&C will require close monitoring.

Specific items for action,monitoring & recording observations (Contd.) xii) Transitions, viz. bridge approaches, level crossings, culverts, tunnels etc., where the track stiffness changes abruptly, will require special monitoring due to abrupt change in vertical dynamics of heavy wheels.

Specific items for action,monitoring & recording observations (Contd.) FORMATION: Weak stretches of formation would have to be rehabilitated by providing blanket layer as given in RDSO Guideline GE:G-6. Till such time it is done, frequent monitoring of the track geometry at such locations should be done.

Specific items for monitoring & recording observations (Contd.) BRIDGES: Each bridge would have to be evaluated as an individual identity reg. safety vis-a-vis its physical condition. Speed restriction may have to be imposed from safety consideration,if required. Rehabilitation/strengthening should be carried out as per the increased trailing loading density of 8.51 t/m. Sample & vulnerable bridges should be got instruemented through specialised agencies. NDT tests may be carried periodically.

Specific items for monitoring & recording observations (Contd.) Extra maintenance effort would be required due to increase in inspection,monitoring,maintenace of track,formation and bridges. Therefore, a proper record should be kept & costs worked out so that proper evaluation can be done at the end of the pilot project.

Conclusion RDSO should be associated in the studies and monitoring exercises. Railways should put in place the monitoring mechanism by the Monitoring Committee comprising of PCE/CE,CME,COM under GM. Instructions for installation and functioning of weigh bridges for detecting overloading of wagons have to be meticulously observed