Capacity planning.

Slides:



Advertisements
Similar presentations
Strategic Capacity Planning
Advertisements

1 EMBA-2, BUP EO Strategic Capacity Planning.
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Strategic Capacity Management.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Process.
Capacity Management Planning the resource capacity that a firm will need to meet its demand.
Capacity After deciding what products/services should be offered and how they should be made, management must plan the capacity of its processes. Capacity.
6 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Capacity Planning (Long-Term Capacity Planning) 6.
PRODUCTION AND OPERATIONS MANAGEMENT
Chapter 9– Capacity Planning & Facility Location
Facility Planning: Capacity. Capacity Planning Interrelated facility planning decisions: 1.Number of facilities and general type 2.Capacity 3.Locations.
MBA 570 Summer How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities.
Quantitative Review I. Capacity and Constraint Management (Break-Even Analysis)
MD707 Operations Management Professor Joy Field
6 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Capacity Planning 6 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
6 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Capacity Planning Chapter 6.
© 2007 Pearson Education Constraint Management Chapter 7.
Capacity Planning Manufacturing : Inventory can be used to cushion fluctuations in demand More focused on machinery as a constraint than people Services.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Chapter 8.
Operations Management
Strategic Capacity Planning Defined
Chapter 9– Capacity Planning & Facility Location
Chapter 9– Capacity Planning & Facility Location
KR: Chapter 8 Capacity. Chapter Outline Introduction Measures of capacity Capacity unit Peak capacity vs. effective capacity Bottleneck Economies of scale.
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Decision Trees  Used.
Strategic Capacity Planning Based on slides for Chase Acquilano and Jacobs, Operations Management, McGraw-Hill.
Operations Management Capacity Planning Supplement 7
For Products and Services
Chapter 9– Capacity Planning & Facility Location
Operations Management
capacity planning and control
Operations Planning Horizons
Long-Range Capacity Planning
Chapter 9– Capacity Planning & Facility Location
Capacity Planning & Facility Location
To Accompany Ritzman & Krajewski, Foundations of Operations Management © 2003 Prentice-Hall, Inc. All rights reserved. Chapter 6 Capacity.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Process.
PowerPoint presentation to accompany Heizer/Render - Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall Process Strategies ( process, repetitive, product) The objective of the process strategy.
C A P A C I T Y Dr. Dewi Nusraningrum, M.Si. CAPACITY PLANNING - Capacity is the maximum rate of output for a facility. - Capacity planning is central.
© Wiley Chapter 9– Capacity Planning & Facility Location Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
1 Slides used in class may be different from slides in student pack Chapter 11 Strategic Capacity Planning  Strategic Capacity Planning Defined  Capacity.
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
Capacity Planning.
Capacity Planning & Facility Location
Module 4: Capacity Capacity
Tata McGraw CHAPTER 5 Strategic Capacity Management.
CHAPTER 8 CAPACITY. THE CONCEPT Maximum rate of output for a process Inadequate capacity can lose customers and limit growth while excess capacity can.
Strategic Capacity Planning for Products and Services McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Facility Capacity and Location Chapter 5, Part A.
Capacity Planning Pertemuan 04
Decision Making Under Uncertainty: Pay Off Table and Decision Tree.
 Capacity is the ability of a process or system to hold, receive, store or accommodate.  In business terms, it is the amount of output that a system.
Operations Management For Competitive Advantage 1 Strategic Capacity Management Operations Management For Competitive Advantage Chapter 9.
Strategic Capacity Planning for Products and Services McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Reid & Sanders, Operations Management © Wiley 2002 Capacity Planning and Facility Location 9 C H A P T E R.
Capacity Planning.
Chapter 3: Strategic Capacity Management
Chapter 9– Capacity Planning & Facility Location
Strategic Capacity Management
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 3: Strategic Capacity Management
Stevenson 5 Capacity Planning.
Planning Capacity Chapter 4.
Production and Operations Management
Capacity Planning For Products and Services
Presentation transcript:

Capacity planning

Capacity is the maximum output rate of a production or service facility Capacity planning is the process of establishing the output rate that may be needed at a facility: Strategic issues(long term): how much and when to spend capital for additional facility & equipment Tactical issues(short term): workforce & inventory levels, & day-to-day use of equipment

Measuring Capacity Examples There is no one best way to measure capacity Output measures are easier to understand With multiple products, inputs measures work better

Capacity Information Needed Design capacity: Maximum output rate under ideal conditions A bakery can make 30 custom cakes per day when pushed at holiday time Effective capacity: Maximum output rate under normal (realistic) conditions On the average this bakery can make 20 custom cakes per day

Calculating Capacity Utilization Measures how much of the available capacity is actually being used: Measures effectiveness Use either effective or design capacity in denominator

Example of Capacity Utilization 5-6 Example of Capacity Utilization During one week of production, a plant produced 83 units of a product. Its historic highest or best utilization recorded was 120 units per week. What is this plant’s capacity utilization rate? Answer: Capacity utilization rate = Capacity used Best operating level = 83/120 =0.69 or 69% 6

Example of Computing Capacity Utilization: In the bakery example the design capacity is 30 custom cakes per day. Currently the bakery is producing 28 cakes per day. What is the bakery’s capacity utilization relative to both design and effective capacity?

Example If operated around the clock under ideal conditions, the fabrication department of an engine manufacturer can make 100 engines per day. Management believes that a maximum output rate of only 45 engines per day can be sustained economical over a long period of time. Currently, the department is producing an average of 50 engines per day. What is the utilization of the department relative to peak capacity? Effective capacity?

How Much Capacity Is Best? The Best Operating Level is the output that results in the lowest average unit cost Economies of Scale: Where the cost per unit of output drops as volume of output increases Spread the fixed costs of buildings & equipment over multiple units, allow bulk purchasing & handling of material Diseconomies of Scale: Where the cost per unit rises as volume increases Often caused by congestion (overwhelming the process with too much work-in-process) and scheduling complexity

Best Operating Level and Size Alternative 1: Purchase one large facility, requiring one large initial investment Alternative 2: Add capacity incrementally in smaller chunks as needed

Economies & Diseconomies of Scale 5-12 Economies & Diseconomies of Scale 100-unit plant 200-unit 300-unit 400-unit Volume Average unit cost of output Economies of Scale and the Learning Curve working Diseconomies of Scale start working

Capacity strategies Sizing capacity cushions Timing and sizing expansion Operating decisions

Capacity cushion The capacity cushion is the amount of reserve capacity that a firm maintains to handle sudden increases in demand or temporary losses of production capacity. It measures the amount by which the average utilization (in terms of effective capacity) falls below 100 percent. Capacity cushion = 100% - Utilization rate (%)

When to expand and by how much? The timing and sizing of expansion are related. If demand is increasing and the time between increments increases, the size of the increments must also increase. Expansionist strategy which stays ahead of demand, minimizes the chance of sales lost to insufficient capacity. Wait-and-see strategy lags behind demand, relying on short-term options

Estimate capacity requirements(Single Machine) Processing hours required for year’s demand Hours available from one machine per year after deducting the desired cushion Estimate capacity requirements(Multiple M/c) Sum of Processing & setup hours required for year’s demand for each product Hours available from one machine per year after deducting the desired cushion

Estimate capacity requirements (Single M/c) M=D p /N[1-C/100)] Where M= no of machines required for single process D = number of units (customers) forecast per year p = processing time (in hours per unit or customers) N = total number of hours per year during which the process operates C = desired capacity cushion

Estimate capacity requirements M=[Dp+(D/Q)S]product1 + [Dp+(D/Q)S]product2 +..+ [Dp+(D/Q)S]productn N[1-C/100)] Where M= no of machines required for multiple process D = number of units (customers) forecast per year p = processing time (in hours per unit or customers) N = total number of hours per year during which the process operates C = desired capacity cushion Q = number of units in each lot s = setup time (in hours) per lot

Example A copy center in an office building prepares bound reports for two clients. The center makes multiple copies (the lot size) of each report. The processing time to run, collate, and bind each copy depends on, among other factors, the number of pages. The center operates 250 days per year, with an eight hours shift. Management believes that a capacity cushion of 15% is best. It currently has 3 copy machines. Based on the following table of information, determine how many machines are needed at the copy center. Item Client X Client Y Annual demand forecast (copies) 2000 6000 Standard processing time (hour/copy) 0.5 0.7 Average lot size (copies per report) 20 30 Standard setup time (hours) 0.25 0.40

Identify Gaps A capacity gap is any difference (positive or negative) between projected demand and current capacity. Identifying gaps requires use of the correct capacity measure. Complications arise when multiple operations and several resource inputs are involved. In 1970 when airline executive states fly more seats to get more passengers many airlines responded by buying more jumbo jets, but competitors flying smaller planes were more successful. The correct measure of capacity was the number of departments rather than the number of seats.

Step 2: Identify Gaps A restaurant is experiencing a boom in business. The owner expects to serve a total of 80,000 meals this year. Although the kitchen is operating at 100 percent capacity, the dining room can handle a total of 1,05,000 dinners per year. Forecasted demand for the next five years is as follows: Year 1: 90,000 meals Year 2: 1,00,000 meals Year 3: 1,10,000 meals Year 4: 1,20,000 meals Year 5: 1,30,000 meals What are the capacity gaps in the restaurant’s kitchen and dining room through year 5?

Develop alternatives The next step is to develop alternative plans to cope with projected gaps. One alternative is base case, which is do nothing and simply lose orders from any demand that exceeds current capacity. Other alternatives are various timing and sizing options for adding new capacity, including the expansionist and wait-and-see strategies.

Tools for Capacity Planning Waiting Line Model Simulation Decision Tree

5-24 Example A glass factory specializing in crystal is experiencing a substantial backlog, and the firm's management is considering three courses of action: A) Arrange for subcontracting B) Construct new facilities C) Do nothing (no change) The correct choice depends largely upon demand, which may be low, medium, or high. By consensus, management estimates the respective demand probabilities as 0.1, 0.5, and 0.4. 20

5-25 The management also estimates the profits when choosing from the three alternatives (A, B, and C) under the differing probable levels of demand. These profits, in thousands of dollars are presented in the table below: 21

Example: Good Eats Café Good Eats Café is about to build a new restaurant. An architect has developed three building designs, each with a different seating capacity. Good Eats estimates that the average number of customers per hour will be 80, 100, or 120 with respective probabilities of 0.4, 0.2, and 0.4. The payoff table showing the profits for the three designs is on the next slide. Payoff Table Average Number of Customers Per Hour c1 = 80 c2 = 100 c3 = 120 Design A $10,000 $15,000 $14,000 Design B $ 8,000 $18,000 $12,000 Design C $ 6,000 $16,000 $21,000