To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Chapter 8.

Slides:



Advertisements
Similar presentations
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Lean Systems.
Advertisements

6 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Capacity Planning 6 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Process.
Capacity After deciding what products/services should be offered and how they should be made, management must plan the capacity of its processes. Capacity.
6 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Capacity Planning 6 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Constraint Management
6 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Capacity Planning (Long-Term Capacity Planning) 6.
PRODUCTION AND OPERATIONS MANAGEMENT
Capacity Planning Chapter 6
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J S 7-1 Operations Management Capacity Planning Supplement 7.
MD707 Operations Management Professor Joy Field
6 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Capacity Planning 6 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
6 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Capacity Planning Chapter 6.
© 2007 Pearson Education Constraint Management Chapter 7.
Constraint Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
Capacity planning.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Simulation.
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Supplement A Decision Making.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Supply-Chain.
KR: Chapter 8 Capacity. Chapter Outline Introduction Measures of capacity Capacity unit Peak capacity vs. effective capacity Bottleneck Economies of scale.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Chapter 11.
Operations Management Capacity Planning Supplement 7
© 2006 Prentice Hall, Inc.9 – 1 Operations Management Chapter 9 – Layout Strategy © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
Supplement E - Special Inventory Models. Special Inventory Models Production quantity Demand during production interval Maximum inventory Production and.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Waiting.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Supplement.
To Accompany Ritzman & Krajewski, Foundations of Operations Management © 2003 Prentice-Hall, Inc. All rights reserved. Chapter 6 Capacity.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Process.
C A P A C I T Y Dr. Dewi Nusraningrum, M.Si. CAPACITY PLANNING - Capacity is the maximum rate of output for a facility. - Capacity planning is central.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 12 Resource Planning.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Forecasting.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Chapter 16.
Module 4: Capacity Capacity
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Resource.
© 2007 Pearson Education Constraint Management Chapter 7.
CHAPTER 8 CAPACITY. THE CONCEPT Maximum rate of output for a process Inadequate capacity can lose customers and limit growth while excess capacity can.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Supplement.
Lecture 11 Capacity Management and Planning Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Chapter 15.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Resource.
Constraint Management
Capacity Planning Pertemuan 04
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Special.
OPERATIONS MANAGEMENT for MBAs Fourth Edition 1 Meredith and Shafer John Wiley and Sons, Inc. Chapters 8 & 8S : Capacity, Forecasting Topic 2: Capacity.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Chapter 12.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Inventory.
S7 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry.
Constraint Management Students should be able to: 1.Assess the capacity of a process 2.Define the Theory of Constraints and explain how to use it. 3.Identify.
 Capacity is the ability of a process or system to hold, receive, store or accommodate.  In business terms, it is the amount of output that a system.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Inventory.
Capacity Planning.
Chapter 3: Strategic Capacity Management
Supply-Chain Design Chapter 9
Aggregate Planning Chapter 14
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Constraint Management
Master Production Scheduling
Chapter 3: Strategic Capacity Management
Strategy Chapter 2.
Special Inventory Models
Planning Capacity Chapter 4.
Resource Planning Chapter 16
Learning Curve Analysis
Decision Making Supplement A
Acceptance Sampling Plans
Simulation Supplement B
Presentation transcript:

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Chapter 8 - Capacity

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Utilization

Utilization Fabrication can make 100 engines/day Management wants 45 engines/day Currently producing 50 engines/day Example 8.1

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Utilization Fabrication can make 100 engines/day Management wants 45 engines/day Currently producing 50 engines/day Utilization peak = Average output rate Peak capacity Example 8.1

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Utilization Fabrication can make 100 engines/day Management wants 45 engines/day Currently producing 50 engines/day Utilization peak = Example 8.1

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Utilization Fabrication can make 100 engines/day Management wants 45 engines/day Currently producing 50 engines/day Utilization peak = x 100% = 50% Example 8.1

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Utilization Fabrication can make 100 engines/day Management wants 45 engines/day Currently producing 50 engines/day Utilization peak = x 100% = 50% Utilization effective = Average output rate Effective capacity Example 8.1

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Utilization Fabrication can make 100 engines/day Management wants 45 engines/day Currently producing 50 engines/day Utilization peak = x 100% = 50% Utilization effective = Example 8.1

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Utilization Fabrication can make 100 engines/day Management wants 45 engines/day Currently producing 50 engines/day Utilization peak = x 100% = 50% Utilization effective = x 100% = 111% Example 8.1

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Utilization Fabrication can make 100 engines/day Management wants 45 engines/day Currently producing 50 engines/day Utilization peak = 50% Utilization effective = 111% Example 8.1

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Utilization Fabrication can make 100 engines/day Management wants 45 engines/day Currently producing 50 engines/day Capacity cushion peak = 100% – 50% = 50% Capacity cushion effective = 100% – 111% = – 11% Utilization peak = 50% Utilization effective = 111% Figure 8.1

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Utilization Fabrication can make 100 engines/day Management wants 45 engines/day Currently producing 50 engines/day Capacity cushion effective = 100% – Utilization effective Utilization peak = 50% Utilization effective = 111% Capacity cushion peak = 100% – Utilization peak Example 8.1

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Utilization Fabrication can make 100 engines/day Management wants 45 engines/day Currently producing 50 engines/day Capacity cushion peak = 100% - 50% Capacity cushion effective = 100% – 111% Utilization peak = 50% Utilization effective = 111% Capacity cushion peak = 100% – 50% Example 8.1

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Utilization Fabrication can make 100 engines/day Management wants 45 engines/day Currently producing 50 engines/day Capacity cushion peak = 100% – 50% = 50% Capacity cushion effective = 100% – 111% = – 11% Utilization peak = 50% Utilization effective = 111% Example 8.1

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Bottlenecks

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Bottlenecks Inputs To customers (a) Operation 2 a bottleneck 50/hr /hr Figure 8.2

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. (b) All operations bottlenecks Capacity Bottlenecks Figure 8.2

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Theory of Constraints 1.Identify the system bottleneck(s) 2.Exploit the bottleneck(s) 3.Subordinate all other decisions to step 2 4.Elevate the bottleneck(s) 5.Do not let inertia set in

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Output rate (patients per week) Economies and Diseconomies of Scale Figure 8.3 Average unit cost (dollars per patient)

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. 250-bed hospital Output rate (patients per week) Economies and Diseconomies of Scale Figure 8.3 Average unit cost (dollars per patient)

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Economies and Diseconomies of Scale 250-bed hospital 500-bed hospital Output rate (patients per week) Figure 8.3 Average unit cost (dollars per patient)

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Economies and Diseconomies of Scale 250-bed hospital 500-bed hospital Output rate (patients per week) Economies of scale Figure 8.3 Average unit cost (dollars per patient)

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Economies and Diseconomies of Scale 250-bed hospital 750-bed hospital 500-bed hospital Output rate (patients per week) Economies of scale Figure 8.3 Average unit cost (dollars per patient)

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Economies and Diseconomies of Scale Average unit cost (dollars per patient) Output rate (patients per week) 250-bed hospital 750-bed hospital 500-bed hospital Diseconomies of scale Economies of scale Figure 8.3

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Strategies

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Strategies Time Forecast of capacity required Capacity Figure 8.4

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Strategies Planned unused capacity Time (a) Expansionist strategy Forecast of capacity required Capacity Figure 8.4

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Strategies Planned unused capacity Time (a) Expansionist strategy Forecast of capacity required Capacity Figure 8.4

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Strategies Time between increments Capacity increment Planned unused capacity Time (a) Expansionist strategy Forecast of capacity required Capacity Figure 8.4

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Strategies Time Forecast of capacity required Capacity (b) Wait-and-see strategy Figure 8.4

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Strategies Time Forecast of capacity required Capacity (b) Wait-and-see strategy Planned use of short-term options Figure 8.4

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Strategies Time between increments Capacity increment Time Forecast of capacity required Capacity Planned use of short-term options (b) Wait-and-see strategy Figure 8.4

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Linking Capacity and Other Decisions Competitive Priorities Quality Management Capital Intensity Resource Flexibility Inventory Scheduling

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Estimate Capacity Requirements ItemClient XClient Y Annual demand forecast (copies) Standard processing time (hour/copy) Average lot size (copies per report) Standard setup time (hours) Example 8.2

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Estimate Capacity Requirements ItemClient XClient Y Annual demand forecast (copies) Standard processing time (hour/copy) Average lot size (copies per report) Standard setup time (hours) [Dp + (D/Q)s] product [Dp + (D/Q)s] product n N[1 – (C/100)] M = Example 8.2

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Estimate Capacity Requirements ItemClient XClient Y Annual demand forecast (copies) Standard processing time (hour/copy) Average lot size (copies per report) Standard setup time (hours) [2000(0.5) + (2000/20)(0.25)] client X + [6000(0.7) + (6000/30)(0.4)] client Y (250 days/year)(1 shift/day)(8 hours/shift)(1.0 – 15/100) M = Example 8.2

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Estimate Capacity Requirements ItemClient XClient Y Annual demand forecast (copies) Standard processing time (hour/copy) Average lot size (copies per report) Standard setup time (hours) M = [2000(0.5) + (2000/20)(0.25)] client X + [6000(0.7) + (6000/30)(0.4)] client Y (250 days/year)(1 shift/day)(8 hours/shift)(1.0 – 15/100) Example 8.2

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Estimate Capacity Requirements ItemClient XClient Y Annual demand forecast (copies) Standard processing time (hour/copy) Average lot size (copies per report) Standard setup time (hours) M = = 3.12  4 machines Example 8.2

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Identify Capacity Gaps

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Kitchen capacity = 80,000 meals Dining room capacity = 105,000 meals Identify Capacity Gaps Example 8.3

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Kitchen capacity = 80,000 meals Dining room capacity = 105,000 meals Demand Year 1:90,000 meals Year 2:100,000 meals Year 3:110,000 meals Year 4:120,000 meals Year 5:130,000 meals Identify Capacity Gaps Example 8.3

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Kitchen capacity = 80,000 meals Dining room capacity = 105,000 meals Demand Year 1:90,000 meals Year 2:100,000 meals Year 3:110,000 meals Year 4:120,000 meals Year 5:130,000 meals Kitchen Capacity Gaps Identify Capacity Gaps Example 8.3

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Kitchen capacity = 80,000 meals Dining room capacity = 105,000 meals Demand Year 1:90,000 meals Year 2:100,000 meals Year 3:110,000 meals Year 4:120,000 meals Year 5:130,000 meals Kitchen Capacity Gaps Year 1:90,000 – 80,000 = 10,000 Identify Capacity Gaps Example 8.3

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Kitchen capacity = 80,000 meals Dining room capacity = 105,000 meals Demand Year 1:90,000 meals Year 2:100,000 meals Year 3:110,000 meals Year 4:120,000 meals Year 5:130,000 meals Kitchen Capacity Gaps Year 1:90,000 – 80,000 = 10,000 Year 2:100,000 – 80,000 = 20,000 Year 3:110,000 – 80,000 = 30,000 Year 4:120,000 – 80,000 = 40,000 Year 5:130,000 – 80,000 = 50,000 Identify Capacity Gaps Example 8.3

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Kitchen capacity = 80,000 meals Dining room capacity = 105,000 meals Demand Year 1:90,000 meals Year 2:100,000 meals Year 3:110,000 meals Year 4:120,000 meals Year 5:130,000 meals Dining Room Capacity Gaps Year 1: Year 2: Year 3: Year 4: Year 5: Identify Capacity Gaps Example 8.3

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Kitchen capacity = 80,000 meals Dining room capacity = 105,000 meals Demand Year 1:90,000 meals Year 2:100,000 meals Year 3:110,000 meals Year 4:120,000 meals Year 5:130,000 meals Dining Room Capacity Gaps Year 1:no gaps Year 2:no gaps Year 3: Year 4: Year 5: Identify Capacity Gaps Example 8.3

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Kitchen capacity = 80,000 meals Dining room capacity = 105,000 meals Demand Year 1:90,000 meals Year 2:100,000 meals Year 3:110,000 meals Year 4:120,000 meals Year 5:130,000 meals Dining Room Capacity Gaps Year 1:no gaps Year 2:no gaps Year 3:110,000 – 105,000 = 5,000 Year 4: Year 5: Identify Capacity Gaps Example 8.3

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Kitchen capacity = 80,000 meals Dining room capacity = 105,000 meals Demand Year 1:90,000 meals Year 2:100,000 meals Year 3:110,000 meals Year 4:120,000 meals Year 5:130,000 meals Dining Room Capacity Gaps Year 1:no gaps Year 2:no gaps Year 3:110,000 – 105,000 = 5,000 Year 4:120,000 – 105,000 = 15,000 Year 5:130,000 – 105,000 = 25,000 Identify Capacity Gaps Example 8.3

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Evaluate Alternatives

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Evaluate Alternatives Expand capacity to meet expected demand through Year 5 Example 8.4

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Evaluate Alternatives Expand capacity to meet expected demand through Year 5 YearDemandCash Flow Example 8.4

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Evaluate Alternatives Expand capacity to meet expected demand through Year 5 YearDemandCash Flow 190,000(90,000 – 80,000)2 = $20,000 Example 8.4

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Evaluate Alternatives Expand capacity to meet expected demand through Year 5 YearDemandCash Flow 190,000(90,000 – 80,000)2 = $20, ,000(100,000 – 80,000)2 = $40, ,000(110,000 – 80,000)2 = $60, ,000(120,000 – 80,000)2 = $80, ,000(130,000 – 80,000)2 = $100,000 Example 8.4

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Evaluate Alternatives Figure 8.5

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Simulation

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Simulation TIME TO PERFORM (SECONDS) Standard OPERATION AverageDeviation 1.Review renewal application for correctness153 2.Check file for violations and restrictions Process and record payment256 4.Conduct eye test Photograph applicant205 6.Issue temporary license305 AVERAGE CUSTOMER ARRIVAL TIME(PEOPLE PER MINUTE) 8:00 A.M. — 9:00 A.M :00 A.M. — 12:00 P.M :00 P.M. — 1:00 P.M :00 P.M. — 4:00 P.M.0.75 Example 8.5

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Simulation

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Simulation Figure 8.6(a)

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Simulation

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Simulation Figure 8.6(b)

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Simulation

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Simulation Figure 8.6(c)

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Decision Trees

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Decision Trees 1 Small expansion Large expansion Figure 8.7

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Decision Trees Low demand High demand 1 Small expansion Large expansion Figure 8.7

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Decision Trees Low demand High demand Don’t expand Expand 1 2 Small expansion Large expansion Figure 8.7

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Decision Trees Low demand [0.40] High demand [0.60] Don’t expand Expand 1 2 Small expansion Large expansion Figure 8.7

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Decision Trees Low demand [0.40] $70 $220 $40 High demand [0.60] Don’t expand Expand $135 $ Small expansion Large expansion Figure 8.7

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Decision Trees Low demand [0.40] $70 $220 $40 High demand [0.60] Don’t expand Expand $135 $ Small expansion Large expansion Figure 8.7

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Decision Trees Low demand [0.40] $70 $220 $40 High demand [0.60] $135 Don’t expand Expand $135 $ Small expansion Large expansion Figure 8.7

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Decision Trees Low demand [0.40] $70 $220 $40 High demand [0.60] $135 Don’t expand Expand $135 $ Small expansion Large expansion Figure 8.7

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Decision Trees Low demand [0.40] $70 $220 $40 High demand [0.60] $135 Don’t expand Expand $135 $ Small expansion Large expansion Expected Payoff = Event * Event Probability Figure 8.7

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Decision Trees Low demand [0.40] $70 $220 $40 High demand [0.60] $135 Don’t expand Expand $135 $ Small expansion Large expansion Expected Payoff = Event * Event Probability Small/Low = $70 (0.40) Figure 8.7

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Decision Trees Low demand [0.40] $70 $220 $40 High demand [0.60] $135 Don’t expand Expand $135 $ Small expansion Large expansion Expected Payoff = Event * Event Probability Small/Low = $70 (0.40) = $28 Figure 8.7

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Decision Trees Low demand [0.40] $70 $220 $40 High demand [0.60] $135 Don’t expand Expand $135 $ Small expansion Large expansion Expected Payoff = Event * Event Probability Small/Low = $70 (0.40) = $28 Small/High = $135 (0.60) Figure 8.7

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Decision Trees Low demand [0.40] $70 $220 $40 High demand [0.60] $135 Don’t expand Expand $135 $ Small expansion Large expansion Expected Payoff = Event * Event Probability Small/Low = $70 (0.40) = $28 Small/High = $135 (0.60) = $81 Figure 8.7

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Decision Trees Low demand [0.40] $70 $220 $40 High demand [0.60] $135 Don’t expand Expand $135 $ Small expansion Large expansion Expected Payoff = Event * Event Probability Small/Low = $70 (0.40) = $28 Small/High = $135 (0.60) = $81 Small = $28 + $81 = $109 Figure 8.7

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Decision Trees Low demand [0.40] $70 $220 $40 High demand [0.60] $135 Don’t expand Expand $135 $ Small expansion Large expansion Expected Payoff = Event * Event Probability Small/Low = $70 (0.40) = $28 Small/High = $135 (0.60) = $81 Small = $28 + $81 = $109 $109 Figure 8.7

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Decision Trees Low demand [0.40] $70 $220 $40 High demand [0.60] $135 Don’t expand Expand $135 $ Small expansion Large expansion Expected Payoff = Event * Event Probability Small/Low = $70 (0.40) = $28 Small/High = $135 (0.60) = $81 Small = $28 + $81 = $109 $109 Figure 8.7

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Decision Trees Low demand [0.40] $70 $220 $40 High demand [0.60] $135 Don’t expand Expand $135 $ Small expansion Large expansion Expected Payoff = Event * Event Probability Large/Low = $40 (0.40) = $16 Large/High = $220 (0.60) = $132 Large = $16 + $132 = $148 $109 Figure 8.7

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Decision Trees Low demand [0.40] $70 $220 $40 High demand [0.60] $135 Don’t expand Expand $135 $ Small expansion Large expansion Expected Payoff = Event * Event Probability Large/Low = $40 (0.40) = $16 Large/High = $220 (0.60) = $132 Large = $16 + $132 = $148 $109 $148 Figure 8.7

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Decision Trees Low demand [0.40] $70 $220 $40 $148 $109 High demand [0.60] $135 Don’t expand Expand $135 $ Small expansion Large expansion Figure 8.7

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Decision Trees Low demand [0.40] $70 $220 $40 $148 $109 High demand [0.60] $135 Don’t expand Expand $135 $ Small expansion Large expansion Figure 8.7

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Decision Trees Low demand [0.40] $70 $220 $40 $148 $109 $148 High demand [0.60] $135 Don’t expand Expand $135 $ Small expansion Large expansion Figure 8.7

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Decision Trees Low demand [0.40] $70 $220 $40 $148 $109 $148 High demand [0.60] $135 Don’t expand Expand $135 $ Small expansion Large expansion Figure 8.7

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Bottleneck Figure 8.8

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Capacity Decisions Bottleneck Figure 8.8