Facilities and Aggregate Planning. A digression I am not an advocate of gambling, but use an example here that you might draw on later. Say I have a coin.

Slides:



Advertisements
Similar presentations
13.1 ECONOMIC COST AND PROFIT
Advertisements

Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.
Constraint Management
Capacity Planning For Products and Services
Utility Theory.
Labor Demand in the market in the short run.
Operations Management Contemporary Concepts and Cases Chapter Twelve Capacity Planning Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
MD707 Operations Management Professor Joy Field
6 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Capacity Planning 6 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
Capacity planning.
CAPACITY LOAD OUTPUT.
Strategic Capacity Planning & Aggregate Planning
1 Aggregate Supply The AS is the part of our national economy model where the production side is studied.
Process Selection.
1 Utility Theory. 2 Option 1: bet that pays $5,000,000 if a coin flipped comes up tails you get $0 if the coin comes up heads. Option 2: get $2,000,000.
1 Monopsony Monopsony is a situation where there is one buyer – you have seen Monopoly, a case of one seller. Here we want to explore the impact on the.
Monopsony Monopsony is a situation where there is one buyer – you have seen Monopoly, a case of one seller. Here we want to explore the impact on the.
1 Long Run Cost Here we study the long run.. 2 Long Run Costs Remember the long run is when all inputs are variable. I think it is useful to think of.
1 Labor Market Equilibrium. 2 Overview In this section we want to explore what happens in a competitive labor market. Plus we will look at an application.
Copyright © 2007 Prentice-Hall. All rights reserved 1 Special Business Decisions and Capital Budgeting Chapter 25.
September 19, 2009Section 4 Section Notes1 EWMBA201A Eva Vivalt.
1 Job Search Models. 2 In economics we have a general rule of behavior that says engage in an activity up to the point where the marginal benefit is equal.
1 Labor Demand and Supply. 2 Overview u In the previous few chapters we have focused on the output decision for firms. Now we want to focus on the input.
1 Excise Tax on a Market. 2 excise tax An excise tax is a tax on the seller of a product. We treat the tax as a cost of doing business. If there is no.
1 Section 2a Production and Costs. 2 Overview In this section we want to 1) Think about how production might occur and change as different amounts of.
1 Production and Costs in the Long Run. 2 The long run u The long run is the time frame longer or just as long as it takes to alter the plant. u Thus.
Production In this section we want to explore ideas about production of output from using inputs. We will do so in both a short run context and in a long.
1 Monopsony Monopsony is a situation where there is one buyer – you have seen Monopoly, a case of one seller. Here we want to explore the impact on the.
Aggregate planning 1 Aggregate planning / scheduling Medium range plan - what we will make over the next 3-18 months. –general demand –controllable variables.
Operations Management Capacity Planning Supplement 7
Chapter 9 Capacity Planning 2000 by Prentice-Hall, Inc.
Facilities and Aggregate Planning. Overview As you know there are 24 hours a day, 7 days a week. What can you get done in a week period? Firms need to.
1 Decision Analysis Here we study the situation where the probability of each state of nature is known.
Operations Management
Cost. Overview In this section we want to translate the production data into cost data. In other words, we will want to understand how the cost of producing.
Chapter 30: The Labor Market Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 13e.
Operations Planning Horizons
Process Selection and Capacity Planning
Intermediate-range capacity planning Usually covers a period of 12 months. Short range Intermediate range Long range Now2 months1 Year Aggregate Planning.
Ardavan Asef-Vaziri Systems and Operations Management
PowerPoint presentation to accompany Heizer/Render - Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Outline Random processes Random variables Probability histograms
C A P A C I T Y Dr. Dewi Nusraningrum, M.Si. CAPACITY PLANNING - Capacity is the maximum rate of output for a facility. - Capacity planning is central.
 The McGraw-Hill Companies, Inc Irwin/McGraw-Hill 1 Facilities and Aggregate Planning Chapter 12 Due Date!
1 Parrondo's Paradox. 2 Two losing games can be combined to make a winning game. Game A: repeatedly flip a biased coin (coin a) that comes up head with.
Welcome to MM570 Psychological Statistics
CHAPTER 8 CAPACITY. THE CONCEPT Maximum rate of output for a process Inadequate capacity can lose customers and limit growth while excess capacity can.
Capacity Planning Pertemuan 04
S7 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry.
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 18 Delving Deeper Into Microeconomics.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 16 Sales and Operations Planning.
21-1 The Costs of Production  Before anyone can consume to satisfy wants and needs, goods and services must be produced.  Producers are profit-seeking,
 Capacity is the ability of a process or system to hold, receive, store or accommodate.  In business terms, it is the amount of output that a system.
© 2006 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
Equine Business Breakdown For AGBS 2300 and 2700.
5-1Capacity Planning William J. Stevenson Operations Management 8 th edition.
Operations Management
Facilities and Aggregate Planning
Constraint Management
Chapter 8 Aggregate Planning in the Supply Chain
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Operations Management Capacity Design
Stevenson 5 Capacity Planning.
Planning Capacity Chapter 4.
Capacity Planning For Products and Services
Production and Operations Management
Capacity Planning For Products and Services
Presentation transcript:

Facilities and Aggregate Planning

A digression I am not an advocate of gambling, but use an example here that you might draw on later. Say I have a coin that comes up heads 50% of the time and comes up tails 50% of the time (is there any other kind of coin? – you bet there is!). Say I offer you the following bet. If you flip the coin and it lands on the floor heads up you give me a dollar and if it ends up tails up I give you a dollar. Of course on any one flip you may win or lose a dollar, but if you play over and over again you would expect to not win or lose any money because the expected value to you is.5(-1) +.5(1) = 0 The expected value, or average, is the sum of the probability of each outcome times the cash flow of each outcome. Note the -1 is your cash flow when it comes up heads.

Overview As you know there are 24 hours a day, 7 days a week. What can you get done in a period of 1 week? Firms need to come to grips with what can be accomplished in any time frame. Capacity is the maximum output that can be produced over a given time period. Nominal, or effective, capacity builds in the downtime for machine repairs, shift breaks and the like that make nominal capacity lower. Facilities and decisions regarding facilities have a major impact on what the firm can accomplish.

Facilities Strategy Of course the author suggests that the firm have an overall strategy about facilities as opposed to “incremental capital budgeting” decisions. This means the firm must look beyond just whether a facility will have more revenue than cost. Factors to consider when formulating strategy are 1) Level of predicted demand, 2) Cost of facilities, 3) Response of competitors to firm decisions, 4) The fit with overall business strategy, and 5) International considerations.

Capacity Cushion Capacity cushion is defined as capacity minus average demand. This is a measure of the firms ability to meet the average demand in the market. Let’s study the solved problem on pages 278 and 279 to put some associated ideas into context. Say demand from period to period is uncertain but has the following probability distribution for a chemical company: 1000’s of gallons demanded Probability The average, or expected, demand is the sum of the product of each demand amount and its associated probability: 100(.1) + 110(.2) + 120(.3) + 130(.3) + 140(.1) = = 121

Capacity Cushion If capacity is set at 130 there will be a cushion = 130 – 121 = 9. Anytime demand is less than 130 there will be idle capacity and this will occur =.6 or 60% of the time. Average utilization of the plant is what % of the 130 is being used and it equals the sum of the product of each utilization rate times its probability of occurrence. When demand is 100 the utilization is 100/130, so in total we have (100/130).1 + (110/130).2 + (120/130).3 + (130/130).3 + (130/130).1 = 10/ / / / /130 = ( )/ 130 =.9231 or 92.31% Note when demand is 140 the plant can only make 130 for full utilization.

Capacity Cushion Say that the business will lose $100,000 in revenue for each 1000 gallons it can not deliver, and it costs $5000 to build each 1000 gallons of capacity. There is a trade-off then between capacity and not being able to meet demand. I reproduce the probability distribution for a chemical company: 1000’s of gallons demanded Probability So if 100 capacity is built, unmet demand is (add across)0(.1)10(.2)20(.3)30(.3)40(.1) = 21 Similarly for 110 capacity 0(.1) 0(.2)10(.3)20(.3)30(.1) = 12 Similarly for 120 capacity 0(.1) 0(.2)0(.3)10(.3)20(.1) = 5 Similarly for 130 capacity 0(.1) 0(.2)0(.3) 0(.3)10(.1) = 1 Similarly for 140 capacity 0(.1) 0(.2)0(.3) 0(.3) 0(.1) = 0

Capacity Cushion On the previous slide we see if 100 capacity is built the firm will not be able to meet 21 units of demand (in a probabilistic sense). The total cost is thus 500, ,100,000 = 2,600,000 When it adds 10 more in capacity, an additional 50,000 in cost in building is put on but it reduces lost sale cost on 9 units. SO the extra 50,000 in building cost saves 900,000 in lost sales. This change is a bargain. It makes sense to build 140 capacity because even that extra 10 over 130 adds 50,000 in cost but saves 100,000 on the reduction in lost sales. In this case the building cost is low enough relative to lost revenue to build lots of capacity.

Aggregate Planning Aggregate planning is concerned with matching supply and demand of output over a medium time range, up to approximately 12 months into the future. The planning considers the amount of a product to make and the amount of the resources needed to get the job done. On page 265 you see the characteristics of aggregate planning. Planning options may attempt to modify demand or supply or both.

Workforce Planning The author mentions that firms may use a level strategy or a chase strategy in its use of a workforce. Table 12.1 page 269 has characteristics under which each strategy may be better.

Supply In a basic microeconomics class you may recall the discussion of cost as a major idea behind the supply curve. Much of this chapter is about the costs of production, including the ideas of economies and diseconomies of scale. One thing you may remember from econ is the idea of trade-offs. The last few sections of our chapter here bring these ideas to light and an example is presented.