Yellowtail Dam & Bighorn Lake Billings, Montana October 18, 2007 RECLAMATION Managing Water in the West.

Slides:



Advertisements
Similar presentations
Kansas Groundwater Management Districts
Advertisements

US Army Corps of Engineers BUILDING STRONG ® Mid-West Electric Consumers Association September 16, 2014 Corps of Engineers US Army Missouri River Mainstem.
Groundwater Management Districts Association Chuck Cullom Colorado River Manager CAP January 7, 2015.
Yellowtail Dam & Bighorn Lake Water Supply & Operations Meeting Billings, Montana October 8, 2009 RECLAMATION Managing Water in the West.
US Army Corps of Engineers BUILDING STRONG ® Skiatook Lake Drought Issues and Management.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
31 DECEMBER VARIABLE FLOOD CONTROL DRAFT FOR LIBBY RESERVOIR U.S. Army Corps of Engineers Northwestern Division, North Pacific Region.
Yellowtail Dam & Bighorn Lake Potential Revisions to Draft Criteria Based on Comments and Operating Experience Billings, MT October 13, 2011 RECLAMATION.
Yellowtail Dam & Bighorn Lake Billings, Montana January 2011 RECLAMATION Managing Water in the West.
Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations.
‘The world’s greatest plumbing system’ An example of how a river is managed to use its water as a resource.
Colorado River Basin Water Supply Out look Lake Powell Lake Mead.
(Mt/Ag/EnSc/EnSt 404/504 - Global Change) Water Resources (from IPCC WG-2, Chapter 3) Water Resources Primary Source: IPCC WG-2 Chapter 3 – Freshwater.
One Corps Serving The Army and the Nation Water Supply FY 05 Program Development Ron Conner.
Making Better Decisions in an Uncertain World Reservoir Operations Modeling.
The Colorado River: Operation, Current and Projected Future Conditions Southern California Water Dialogue Los Angeles, CA April 27, 2011.
CRFS Technical Committee Spring Meeting LC Operations Update March 26, 2015.
CRFS Technical Committee Fall Meeting LC Operations Update November 20, 2014.
Responding to Drought (and other) Conditions on the Colorado River Urban Water Institute’s 21 st Annual Conference August 14, 2014.
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting #2: October.
Yellowtail Dam & Bighorn Lake Operating Criteria Review Billings, MT September, 2010 RECLAMATION Managing Water in the West.
Youghiogheny River Lake Storage ReAllocation for Downstream Water Supply by Werner C. Loehlein, P.E.
Bathymetry Changes Caused by a Tropical Storm Chris Scheiner and Gary Pelton US Army Corps of Engineers.
44 th Annual Mid-Pacific Region 2011 Water Users Conference Water Supply Outlook Reno, Nevada January 26-28, 2011.
FERC Relicensing of the Toledo Bend Project – Hydroelectric Power Generation Drought Hydroelectric vs. Water Supply Sabine River Authority Issues.
Water Supply Reallocation Workshop Determining Yield and Space Requirement.
US Army Corps of Engineers BUILDING STRONG ® Savannah River Basin Drought Workshop October 24-25, 2012.
WATER AVAILABILITY MODELING for the SULPHUR RIVER BASIN Texas Natural Resource Conservation Commission Austin, Texas Consultant: R. J. Brandes Company.
A Perspective on Today’s Colorado River Issues. Upper Colorado Region River Basins.
Yellowtail Dam & Bighorn Lake Climate Change Billings, MT September, 2010 RECLAMATION Managing Water in the West.
IMPROVING MILLERTON LAKE FLOOD CONTROL OPERATIONS TO INCREASE WATER SUPPLY Mr. Antonio M. Buelna, P.E. Mr. Douglas DeFlitch Ms. Katie Lee October 29, 2009.
NE Drought Conditions CARC Update: April 2011 Mark Svoboda and Brian Fuchs National Drought Mitigation Center University of Nebraska-Lincoln.
1 Certainty in Uncertain Times? Policy Implications of the Colorado River Compact Eric Kuhn, General Manager.
Water Supply at Beaver Lake, Arkansas Little Rock District US Army Corps of Engineers ® One Corps Serving The Army and the Nation.
Boysen/Buffalo Bill Reservoir Operations John H. Lawson Area Manager Wyoming Area Office April 24, 2007.
Missouri River Forecaster’s Meeting January 28-29, 2014 Scott Guenthner Great Plains Regional Office Billings, Montana Reclamation Reservoir Status.
Yellowtail Dam & Bighorn Lake 2010 Operation Review Billings, MT January 2011 RECLAMATION Managing Water in the West.
Libby Dam June 2006 Spill: Total Dissolved Gas Monitoring.
Yellowtail Dam Modeling Results Brian Marotz Hydropower Mitigation Coordinator.
Yellowtail Dam & Bighorn Lake Water Supply & Operations Meeting Billings, Montana October 9, 2008 RECLAMATION Managing Water in the West.
Colorado River Update Terry Fulp Deputy Regional Director
USACE Managing a Drought  Overview  Timeline  Depletion Scenario Current Status– 17 Oct 07.
Upper San Joaquin River Basin Storage Investigation ACWA Regions 9 and 10 Carlsbad Water Summit U.S. Department of the Interior Bureau of Reclamation State.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
NON-TREATY STORAGE AGREEMENT “Introduction to Operations and the Non Treaty Storage Scenarios” Presenter: Jim Gaspard.
U.S. Army Corps of Engineers Wilmington District Real-Time Conservation Pool Storage Accounting for the Falls Lake Project.
NID Data Model based on HUC CE394K.3 Term Project by Seungwon Won December 7, 2000.
Present and Future Water Supplies to Meet El Paso Demands Presentation to NM-TX Water Commission August 20, 2004 by Michael Fahy El Paso Water Utilities.
NE Drought Conditions CARC Update: November 17, 2015 Brian Fuchs National Drought Mitigation Center University of Nebraska-Lincoln School of Natural Resources.
Yellowtail Dam & Bighorn Lake Reservoir Operating Criteria Proposed Modifications Lovell, Wyoming July 29, 2008 RECLAMATION Managing Water in the West.
Urban Water Institute Colorado River Lower Basin Issues Tanya Trujillo Colorado River Board of California February 10, 2016.
CRFS Technical Committee Fall Meeting LC Operations Update December 8, 2015.
Reclamation and Hoover Dam It’s All About The Water.
CRFS Technical Meeting LC Operations Update November 14, 2012.
CRFS Technical Meeting LC Operations Update March 27, 2014.
Wyoming Association of Rural Water Systems Harry LaBonde Jr, P.E. Director Wyoming Water Development Office April 19, 2016.
Yuma Agriculture Water - Rights and Supply Terry Fulp Director, Lower Colorado Region Yuma Agriculture Water Conference January 13, 2016.
CRFS Technical Committee Spring Meeting LC Operations Update March 15, 2016.
Reservoir Operations and Water Supply Planning at Salt River Project
Management of Flood Waters through Mcphee Reservoir
Drought on the Colorado River System: Impacts and Response
Grapevine Lake Modeling & Watershed Characteristics
Kootenai Basin Spring/Summer Operations for 2016
Lake Ralph Hall Upper Trinity Basin, Texas
Review of Flood Reservoir Routing
Modeling Green and Blue Water: The InVEST Monthly Model
Department of Environmental Quality
Annual Snow Pack Effect on Lake Powell
Agassiz National Wildlife Refuge 61,500 acres 40,100 acres of wetlands 280 species of birds 49 species of mammals 12 species of amphibians 9 species.
Department of Environmental Quality
Presentation transcript:

Yellowtail Dam & Bighorn Lake Billings, Montana October 18, 2007 RECLAMATION Managing Water in the West

Bighorn Lake and River Basin Investigations Possible Flood Storage Reallocation Bighorn River Basin Changes (Depletion Study)

Flood Control Storage Reallocation

BIGHORN LAKE STORAGE ALLOCATIONS Dam Crest Elev Top of Conservation Elev (493,584 Acre - Feet) Surcharge (52,829 af) 3657 (1,328,360 AF) Exclusive Flood Control - 258,331 Acre - Feet 3640 (1,070,029 Acre - Feet) Joint Use - 240,342 Acre - Feet 3614 (829,687 Acre - Feet) Top of Dead Elev (16,008 Acre - Feet) Active Conservation - 336,103 Acre - Feet Inactive Conservation - 477,576 Acre - Feet Dead - 16,008 Acre - Feet

Scenarios Modeled & Reviewed Normal Full Pool Elev. 3640, Current Flood Control Storage Allocation Normal Full Pool Elev 3645, Modified Flood Control Storage Allocation with top of Joint Use raised 5 ft

BIGHORN LAKE STORAGE ALLOCATION Dam Crest Elev Top of Conservation Elev (493,584 Acre - Feet) Surcharge (52,829 af) 3657 (1,328,360 AF) Exclusive Flood Control - 258,331 Acre - Feet 3640 (1,070,029 Acre - Feet) Joint Use - 240,342 Acre - Feet 3614 (829,687 Acre - Feet) Top of Dead Elev (16,008 Acre - Feet) Active Conservation - 336,103 Acre - Feet Inactive Conservation - 477,576 Acre - Feet Dead - 16,008 Acre - Feet

PROPOSED STORAGE REALLOCATION Dam Crest Elev Top of Inactive Conservation Elev (493,584 Acre - Feet) Surcharge 3657 (1,328,360 AF Exclusive Flood Control - 190,846 Acre - Feet 3645 (1,1370,514 Acre - Feet) Joint Use - 307,827 Acre - Feet 3614 (829,687 Acre - Feet) Top of Dead Elev (16,008 Acre - Feet) Active Conservation - 336,103 Acre - Feet Inactive Conservation - 477,576 Acre - Feet Dead - 16,008 Acre - Feet

Possible Flood Storage Reallocation Current Joint Use Pool –240,342 –Elevation Exclusive Flood Pool –258,331 acre-feet –Elevation Conservation Pool –567,445 acre-feet –Elevation Reallocation Joint Use Pool –307,827 acre-feet –Elevation Exclusive Flood Pool –190,846 acre-feet –Elevation Conservation Pool –643,930 acre-feet –Elevation Total Flood Control Storage Space 498,673 acre-feet Elev

Flood Control Impacts Not Addressed To Be Determined by Corps of Engineers

BIGHORN RIVER BASIN CHANGES

Bighorn Lake Average Inflow Pre-Drought Flows vs. Drought Flows

8 Year Average Drought Inflow 53% OF Period

Bighorn River Investigations Bighorn Lake Flood Pool Reallocation –Raise Joint Use Pool 5 feet Bighorn River Basin Depletion Study –New Irrigation or other Development –New Reservoir Storage –New well Development –Changes in Land Management Practices –Changes in Forest Management

QUESTIONS & COMMENTS