HS2 & Water Orton Action Group meeting 11/1/2011 at HS2’s Offices at 55 Victoria Street, London, SW1H 0EU.

Slides:



Advertisements
Similar presentations
Educationeducation Improving Scottish HM Inspectorate of Education Schools (Consultation) (Scotland) Act 2010 HMIe Briefing 2011.
Advertisements

1.The VLRC came into operation on the 6 th April The Victorian Law Reform Commission Act 2000 gives this body its powers. 3. The VLRC is an independent.
THE DIVERSITY OF INTERESTS IN ENVIRONMENTAL GOVERNANCE A CHALLENGE FOR THE RULE OF LAW By Professor D E Fisher.
Railroad Rehabilitation & Improvement Financing Program FEDERAL RAILROAD ADMINISTRATION U.S. DEPARTMENT OF TRANSPORTATION.
Issues and Experiences with Infrastructure Grants from Multiple Perspectives – Panel Discussion OPUS D AYTON K NIGHT John W.C. Boyle, M.I.C.E., P.Eng.
UPAVON PARISH COUNCIL PUBLIC MEETING WHISTLEDOWN FARM DEVELOPMENT 04 JUNE 2014.
New I-65 Interchange at Worthsville Road Welcome!.
Planning Permission Process and Procedures
Supporting and Protecting Adults From Harm Community Planning Board 10 th November 2011 Wendy Hinnie.
Presentation to the Joint Committees’ Meeting on Second 2010 FIFA World Cup South Africa Special Measures Bill (proposed section 76 B ) and 2010.
H EALTH & S AFETY Alan Kaye District 1070 Health & Safety Officer.
FINEX 2008 Environment & Exploration: New Codes and New Attitudes by Fergus Anckorn.
Bills and the legislative process
Promoting Excellence in Family Medicine Enabling Patients to Access Electronic Health Records Guidance for Health Professionals.
Quiz 1: Rail Transport Case Study, 2013 This quiz requires knowledge of the pre-release case study, the issues that lie behind it, and of the Unit 4b specification.
Assessing the efficient cost of sustaining Britain’s rail network: perspectives based on Zonal comparisons. First Conference on Railroad Industry Structure,
Is the expenditure on the ‘HS2’ rail route to Birmingham justified? To see more of our products visit our website at Mark Evetts, Cheltenham.
Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2.
HS2 Steve Rodrick Chief Officer. Preferred Route The Misbourne Valley.
DfE Guidance Post 16 Transport The local authority must exercise its power to provide transport or financial support reasonably, taking into account.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
Icelandair Group Jón Karl Ólafsson PRESIDENT & CEO Icelandair Group and the Environment Reykjavik, December 2006 “Góð hugmynd frá Íslandi”
© Bishop’s Stortford Town Council Bishop’s Stortford Neighbourhood Plan Silver Leys and Meads Wards Draft Transport Stage One 5 February 2013.
Local Assessment of Code of Conduct Complaints. 2 Background  On 08 May 2008 – the local assessment of Code of Conduct complaints was implemented due.
The purpose is to explore methods to improve the safety, capacity, and mobility of Falling Springs Boulevard, US 60, and adjoining roads.
New rights for people complaining about adult social care providers – an introduction.
A PRESENTATION BY `A19NAG’ FOR MEMBERS OF BILLINGHAM TOWN COUNCIL – TO CLARIFY THE AIMS AND PROGRESS OF THE BILLINGHAM A19 NOISE ACTION GROUP, IN SEEKING.
JOINING UP GOVERNMENTS EUROPEAN COMMISSION Establishing a European Union Location Framework.
Review of Issues Affecting Utilities and Road, Rail and Motorway Corridors Mike Sim & Hamish Elliott Resources & Networks Branch Ministry of Economic Development.
PARKING STRATEGY POLICY DEVELOPMENT Transportation & Asset Management Environment & Regeneration Scrutiny Committee 28 February 2007.
Transport The new TEN-T guidelines Results of the legislative procedure Philippe Chantraine (MOVE B1), 24 June 2013.
OHS Seminar DO THE TIME – avoid the crime! Miles Crawley 8 June 2007.
© 2009 Barnes & Thornburg LLP. All Rights Reserved. This page, and all information on it, is the property of Barnes & Thornburg LLP which may not be reproduced,
Regulatory Impact Assessment of New Vehicle Noise Test Colin Treleven Senior Consultant Environmental Assessment Group TRL Limited 6 th September 2005.
Local Assessment of Code of Conduct Complaints. Background  On 08 May 2008 – the local assessment of Code of Conduct complaints was implemented due to.
Police providing crime information and evidence Public Safety Infrastructure Fund Grants Presenter: Superintendent Peter Brigham Title: Assistant Director,
Environment SPC 24 th June 2015 Draft Dublin City Development Plan
Fitness Check of environmental monitoring and reporting Stakeholder Workshop 19/20 Nov 2015 Joachim D'Eugenio Steve White DG Environment European Commission.
High Speed 2 The decision and next steps. Background As per the Coalition commitment, the Government developed a proposed strategy for a high speed rail.
Community Action Derby Kim Harper Chief Executive Update Commissioning & Procurement.
Fitness Check of environmental monitoring and reporting MIG-P meeting 4 Dec 2015 Joachim D'Eugenio Steve White DG Environment European Commission.
European Patients’ Academy on Therapeutic Innovation Aspects of pharmacovigilance: Public hearings.
Rulemaking by APHIS. What is a rule and when must APHIS conduct rulemaking? Under U.S. law, a rule is any requirement of general applicability and future.
Bath and North East Somerset – The place to live, work and visit Instances where planning cases are referred to the Chair of the Development Management.
Page 1 Portfolio Committee on Water and Environmental Affairs 14 July 2009.
RISK MANAGEMENT FOR COMMUNITY EVENTS. Today’s Session Risk Management – why is it important? Risk Management and Risk Assessment concepts Steps in the.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
Lecture 7. A. Collective agreements: 1. Bargaining council agreements: May vary, replace or exclude conditions of employment. ▪ The following core rights.
Torbay Council Partnerships Review August PricewaterhouseCoopers LLP Date Page 2 Torbay Council Partnerships Background The Audit Commission defines.
November 30 th London/Spain Webminar: Railway Infrastructure in the UK Spanish construction and railway industry 1 Jim Steer Director & Founder, Steer.
‘People, Homes and Jobs’ Local Plan Consultation 2015 PPCLG 27 January 2016.
STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER.
Dave Etheridge, CFOA Vice President Move to the Home Office and Fire Reform Programme.
Planning and Zoning Division Jefferson County RZ Sevens Residential Memory Care ODP Case Manager: Russell D Clark.
1 Address: UIC Safety Database (SDB) System and Results.
12 th April  What is it?  Why now?  Who’s doing it?  What are the benefits?  What will the plan look like?  How is it done?
Land west of Grace Crescent, Hardwick Presentation to Hardwick Parish Council 23/08/2016.
Neighbourhood Planning
SIZEWELL C: STAGE 2 CONSULTATION
Hyde St Residents’ Group
Enterprise Programmes Leader
Governance and Ethics BID Workshop 18 June 2018 Maureen Glassey, Senior Investigation Advisor Integrity Unit.
UK Marine Planning and the Ecosystem Based Approach
RSPG 34th Plenary Meeting
West Gate Tunnel – Air quality expert evidence
Management of Allegations Against Adults who work with Children Linda Evans (Head of Quality Assurance for Safeguarding) and Majella O’Hagan (Local Authority.
How to conduct Effective Stage-1 Audit
Pat Sheehan CMIOSH MIIAI Highways Term Maintenance Association
Marco Polo – Towards a policy revision
GCP Transport Update Meeting for: M11 J11 Park & Ride Engagement Group
Presentation transcript:

HS2 & Water Orton Action Group meeting 11/1/2011 at HS2’s Offices at 55 Victoria Street, London, SW1H 0EU

Thank you for the opportunity to meet and have this discussion. Agenda Thank you for the opportunity to meet and have this discussion. Introductions Purpose of meeting Water Orton’s stance & view Response to questions Conclusions

Introductions Water Orton Action Group Dave Henry ~ Chairman mailto:xxxxxxxxxxxxxxxxxxxx@xxxxxxx.xx.xx Jenny Deebank ~ Secretary mailto:xxxxx.xxxxxxx@xxxxxxxxxxx.xxx John Warren ~ Vice Chair. mailto:xxxxxxxxxx@xxxxxxxxxxxx.xxxxx.xx.xx Mark Willis ~ Head of Mitigation mailto:xxxx.xxxxxxxxx@xxxxxxxx.xxx Dan Byles MP ~ Member of Parliament for North Warwickshire & Bedworth mailto:xxx.xxxxx.xx@xxxxxxxxxx.xx Steve Maxey ~ Assistant Chief Executive and Solicitor to the Council, North Warwickshire Borough Council mailto:xxxxxxxxxx@xxxxxxxxxx.xxx.xx HS2 Mrs Alison Munro ~ Chief Executive Professor Andrew McNaughton ~ Chief Engineer Mr Peter Miller ~ Head of Environment

Purpose of this meeting Water Orton Action Group to express our views. To discuss responses to questions we have already raised. To find amendments that ease the situation for Water Orton as per the Rt Hon Philip Hammond’s statement.

Our general stance on HS2 Over all we disapprove of HS2 We believe There is no financial case. There is no environmental case. There is no substantiation of economic benefit to our region. The proximity of HS2 to the school is unacceptable. The number of people and properties affected is unacceptable. The forthcoming consultation period, does not give us any confidence in the ability to change the proposal. Disappointment in the lack of response from HS2, to the questions raised, so that we could have maximised today’s meeting.

Stating the facts The Delta Junction has already been recognised as one of the worst affected areas in the HS2 plans, ref the Rt Hon Philip Hammond’s comment as reported by Mr D.Byles Several weeks ago I invited the Secretary of State for Transport, Philip Hammond, to come to North Warwickshire to see for himself the impact HS2 will have on our villages and our countryside. He came and drove the route, and then attended a meeting with myself and a small number of activists and councillors. At that meeting he agreed that in many places the current proposed route will have a significantly higher impact due to the very high viaducts which are proposed to cross the motorways. He agreed to instruct HS2 Ltd to have another look at whether steps can be taken to amend the design so as to minimise the height of these viaducts, and even to potentially tunnel under the motorways in places. No significant changes have been announced to date for the Delta Junction.

Stating the facts continued Noise The ‘DEFRA’ & ‘World Health Organisation’ (Environmental strategy on noise) recommends reducing noise, rather than increasing noise. Any train will generate a level of noise. The faster a train travels, the more noise it makes. The closer to a rail line you are, the louder it is. The higher a rail line is on a viaduct, the more noise it creates, than at ground level or in a cutting. Any surface rail lines (viaducts/surface/cutting) are noisier than tunnelled sections (excluding tunnel entrances).

Environmental Noise Regulations Data published by the Government under the regulations indicates that the long term average noise levels due to traffic noise in Water Orton are already very high.

Environmental Noise The average level exceeds 60dB over all of the village The night time level exceeds 55dB over all of the village The World Health Organisation (and other bodies) recommend that the noise levels in private amenity space should not exceed 50 dB with 55 dB as a maximum. Some recommend 40dB for new build. A maximum average level of 45dB outside any bedroom window at night. A maximum of 55dB in any school play ground These levels have been recommended because there is evidence of adverse health effects from long term exposure. There is no spare capacity to add more noise to the local environment.

Environmental Noise Stated aims of the Noise Policy Statement for England are:- Avoid significant adverse impacts on health and quality of life from … Mitigate and minimise adverse impacts on health and quality of life … Contribute to the improvement of health and quality of life… We would like to see that the Government’s commitment to this policy taken seriously by designing and routing HS2 so that it does not increase the ambient noise levels and risks to health to residents of the village for now and for the future.

Stating the facts continued Safety School children or anyone gaining access to the rail track are always a risk. This risk is only minimised by fencing and is not eliminated. Anywhere there is a railway, there is a risk of derailment, however small. Any open rail track is subject to objects being dropped onto or thrown at the train & track, particularly bridges or cuttings.

Discussion Our unanswered questions. Our concerns, which have outlined above and documented in "WO questions 14/12/10", in conjunction with the Rt Hon Philip Hammond’s statement on visiting the area in October. In the announcement made 20/12/10 of the amendments made, little has changed with respect to Water Orton and the Delta Junction. Is there anything HS2 & DFT want to declare at this point, that would totally mitigate the issues faced by our area?

Discussion of Questions & Answers

Conclusion We request written confirmation from HS2 / DFT that Water Orton will be given assurance that the current HS2 proposal will be re-visited. Then suitably agreed amendments can be made to alleviate the current HS2 proposed route from devastating our village.

Conclusion Water Orton Delta Junction has three High Speed rail lines. It represents the most significant IMPACT HS2 will have anywhere on the proposed route, devastating our village. Water Orton is already over exposed to the current transport infrastructure. At the very least, based on quotes from the Rt Hon Philip Hammond, changes should be made. If not move it, then tunnelling is a viable option as already suggested by Arup Ltd.

Conclusion We request that our questions from today, and our previously presented 10 questions from the NWBC meeting of the 14/12/10,  be dealt with within 20 working days (8/02/11), as stated by HS2 Ltd.

We extend an invitation to the principles of HS2 limited to a follow up meeting and visit the Village of Water Orton, to gauge the devastation the current proposal will inflict. Thank you