MPRDC 1 MANAGING PPPs Institutional Framework for Contract Management and Monitoring Vivek Aggarwal MD MPRDC Connecting People Through Quality Infrastructure.

Slides:



Advertisements
Similar presentations
OMT RETREAT (WORK PLANNING). The UNDG Operational Guidelines for the Implementation of Common Services were developed in 2000 by an inter-agency.
Advertisements

An Overview of Concession Laws Regional Workshop on Public-Private Partnership in Transport Cesar Queiroz Roads and Infrastructure Consultant World Bank.
A framework for organising and financing infrastructure provision Jan-Eric Nilsson, VTI.
Enable Procurement Agencies to Fulfill their Roles Push Smooth Implementation of Project Procurement Foreign Debts Management Center, Hebei Provincial.
Session 8 Implementing PPPs
Vivek Aggarwal Managing Director, MP Road Dev. Corporation
PRESENTATION ON PUBLIC PRIVATE PARTNERSHIP (PPP) IN NATIONAL HIGHWAYS BySECRETARY, DEPARTMENT OF ROAD TRANSPORT & HIGHWAYS GOVT. OF INDIA Conference of.
Significance of Public Procurement in Sri Lanka
MPRDC 1 PPP in Madhya Pradesh Success Story of Roads Vivek Aggarwal MD MPRDC Connecting People Through Quality Infrastructure.
By : Soukata Vichit The Feasibility of NCF The case of Environment Protection Fund, Lao PDR.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU CONCESSIONS IN TURKISH LAW İbrahim BAYLAN Legal Adviser Public.
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
Developing Guiding Principles for ICT in Education Policy
DEPARTMENT OF TOURISM AND PUNJAB INFRASTRUCTURE DEVELOPMENT BOARD invite Public Private Partnership (PPP) for Development of INSTITUTE OF HOTEL MANAGEMENT.
Incubation in Israel: Model and Performance. Extent  24 incubators  About 10 projects per incubator Typically between 8-12 projects  Grant of $
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
Funding for a brighter tomorrow 1 POWER SECTOR CONCLAVE 14th – July Avkash Saxena General Manager (APDRP) Power Finance Corporation Ltd. Restructured.
Jeff Delmon FEU Financial Solutions World Bank. Why PPP? Procurement efficiency Lifecycle management Design/construction/operation management Monetizing.
Public Private Partnership- Identification, Viability and Implementation Prof. Yashvir Tyagi Prof. Yashvir Tyagi Department of Economics Department of.
Viability Gap Funding By Ashok Chawla Additional Secretary Department of Economic Affairs, Government of India 20 th December, th December, 2006.
ZHRC/HTI Financial Management Training
Financing Urban Public Infrastructure
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
ECONOMIC & RISK ANALYSIS
MP was known for bad roads. Improper design based on traditional approach. Budget driven construction methodology in place of demand driven. Poor fund.
VIRGINIA PUBLIC-PRIVATE EDUCATION FACILITIES AND INFRASTRUCURE ACT OF 2002 (PPEA) Augusta County Board of Supervisors Wednesday, January 6, 2009.
MPRDC 1 Operation, Maintenance & Tolling in Road Sector : Potential, Progress & Way Forward Perspective of Madhya Pradesh Vivek Aggarwal MD MPRDC Connecting.
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
1 Eastern Caribbean Geothermal Development Project: Institutional and juridical guidelines Denis LEVY GROUPE T I T A N E Member of.
Audits of pre-accession funds in the State Audit Office of the Republic of Latvia 2000/2001 Uldis Kremers Auditor of the Audit Department of the State.
Presentation on Financial and Procurement Procedure to be followed by the Institute Management Committees.
Privatizing for the Public Good “Role of Professional Advisors to State DOTs” April 27, 2007 Thomas W. Bradshaw, Jr. Managing Director Co-Head of Transportation.
James Aiello PricewaterhouseCoopers Africa Utility Week 06 International Good Practice in Procurement.
N° 1 The European railway Agency: an engine for the integrated railway area EFRTC, Vilamoura on June 24 TH 2005 Olivier PIRON 24 June 2005.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
III Astana Economic Forum. Ensuring Sustainable Economic Growth of Countries in Post-Crisis Period July 1-2, 2010 JSC «Kazakhstan public-private partnership.
Public Procurement Reforms
Toll Road Asset Management and the Linkage to Finance Transportation Innovations, Inc. 10/22/
Councillor Community Fund Isabell Procter Director of Resources Francis Fernandes Borough Secretary.
Presentation on Strategies for Infrastructure Development in Karnataka By: V. P. Baligar.
Mid Day Meal Scheme AWP&B Arunachal Pradesh.
Arnsburger Str. 64, Frankfurt, Germany Tel , Fax Internet:
Environmental Investment Centre (EIC) Rävala pst 8, TALLINN Tel: Fax:
WSSB Capacity Enhancement Workshops 1 Session 2: Legal & Institutional Background for Management of Small-Town Water Systems.
SAI & PAC Relationship Perspective from the Maldives “The work of an SAI, and its relations with parliament are key factors in a strong chain of accountability.
WHO EURO In Country Coordination and Strengthening National Interagency Coordinating Committees.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
P ublic Sector Development Project Preparation, Approval and Revision Process Mantu Kumar Biswas Joint Chief Ministry of Water Resources Bangladesh Secretariat.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
 Contract by Public Authority for provision of asset and/or services  With private entity  Private finance used to fund asset/service  Long-term in.
Virginia Office of Public-Private Partnerships (VAP3) Adopted Public-Private Transportation Act (PPTA) enabling legislation in 1995 Public-Private Education.
Infrastructure Development Corporation Limited Risk Mitigation through Project Development Focus on Safer Airplanes in addition to better Parachutes Pradeep.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
The World Bank General Legal Framework for PPPs Katja Kerschbaumer.
Restructuring of the Finnish Infrastructure Administration Draft
The Central purchasing in Bulgaria: Current status and prospective TAIEX Seminar 9-10 December 2015 Ivanina Beleva Director of the Central Purchasing Body.
Public – Private Partnership in Vietnam: A new approach Ho Chi Minh City – June 2010.
CONSTRUCTION PROCUREMENT, CONTRACTING AND CONTRACTS MANAGEMENT IN GHANA PREPARED BY: SURV. OSEI AGYEMANG-BADU MSc, BSc, MGhIS. (PROCUREMENT SPECIALIST)
Advisor, IDS Cell1 NEGOTIATIONS G.C. Tallur (Former Secretary, PWD) Advisor, IDS Cell Monday, July 11, 2005.
Treasury of the Republic of Kazakhstan
Agency Performance: A New Agenda
UNCITRALThird International Colloquium on Public-Private Partnerships (PPPs) October 2017, Vienna Experts for Chapter IV October 2017.
PUBLIC PROCUREMENT SYSTEM IN UZBEKISTAN
Makerere University Investors Conference
Public Private Partnerships
ESCL – ANNUAL CONFERENCE 25 OCTOBER 2018 EDWINA UDRESCU, FCIArb Lawyer
Cofindustria OVERVIEW OF THE WORLD BANK PROGRAM IN SERBIA
Building a secure Home Affairs
Article 5 Setting up the rules guaranteeing Users protection that will
SADC PPP Network PPPs in SADC
Presentation transcript:

MPRDC 1 MANAGING PPPs Institutional Framework for Contract Management and Monitoring Vivek Aggarwal MD MPRDC Connecting People Through Quality Infrastructure

MPRDC 2  Incorporated as wholly owned State Govt. Company under Companies Act 1956, in July  ‘Highway Authority’ for State Highway.  Upgrades, Constructs and Strengthens the total length of State Highways.  Develops projects in the State on Public Private Partnership basis.  The Hon’ble Chief Minister of Madhya Pradesh is the chairman, Hon’ble Minister of Public Works Department & the Chief Secretary are the Vice Chairmen, the Principal Secretaries of the Finance dept., Forest Dept., Urban Administration & development and Mining Dept. are the members of the Board.  MD, MPRDC is also one of the director. Madhya Pradesh Road Development Corporation

MPRDC 3 Invite private investment by providing grant / premium to / by the concessionaire on competitive bidding Our Projects

MPRDC 4 Category/ModelCost (Crores) Ongoing BOT (Toll)16053 BOT (Toll + Annuity)3260 BOT (Annuity)4578 ADB4159 Regular Contract1689 ROB/RUB1645 Border Checkpost1094 OMT45 Building Works165 Projects in Pipeline ADB Loan IV Lanning Of 3 State Highways on BOT (Toll) 4500 Grand Total40188

Our Projects: Cost Share in Crores of Rupees MPRDC 5

6 Project Development  Identification of project.  Feasibility Study- By feasibility Consultant selected through open bidding.  Financial Analysis- In house  Tender Documentation- based on Model documents.  Approval of SLEC- Chaired by the Chief Secretary GoMP.  Cabinet Approval.  Approval of VGF from Empowered Institution of GoI.

7 MPRDC Bidding  Two stage bidding. RFQ & RFP  e-tendering.  Pre-bid Conference at each stage.  Tender Evaluation Committee- Chaired by Technical Advisor MPRDC.  Tender Committee- Chaired by the Chief Secretary GoMP. PS PWD, PS Finance & MD MPRDC are members. Approves the bid.  LOA is issued on the day on which bid is approved.

MPRDC 8 Contract Milestones The Concession Agreement has to be signed within 45 days from the date of issue of LOA.  SPV is needed to be incorporated for signing the Concession Agreement.  Concurrence on the incorporation of SPV is accorded by MPRDC after examination by the Company Secretary. Financial Closure within 180 days of signing of Concession Agreement. Upon failure, of Performance Security upto120 days & 0.2% for further 80 days.

MPRDC 9 Conditions Precedent to be fulfilled by Concessionaire  Submission of Performance Security within 180 days from the date of signing of contract.  Execution of the Escrow Agreement.  Execution of the Substitution Agreement.  Procurement of all Applicable Permits relating to environmental protection and conservation of the Site.  Execution of Financing Agreement.  Legal opinion of the Legal Counsel on the concession.  Upon failure to meet Conditions Precedent, damages for 0.2 % of the Performance Security for each day, subject to a maximum of 20% of Performance Security.

MPRDC 10 Conditions Precedent to be fulfilled by MPRDC  Procurement of Right of Way to the site.  Procurement of Environmental Clearance.  Procurement of GAD from Railway.  Upon failure to meet Conditions Precedent, damages for 0.1 % of the Performance Security for each day, subject to a maximum of 20% of Performance Security.

MPRDC 11 Pre-Construction Activities 1.Land Acquisition 2.Environmental Clearances 3.Approval of Designs 4.Utility Shifting 5.Mobilization of Man & Machinery at the site.

MPRDC 12 Pre-Construction Activities Land Acquisition and Environmental Clearances are planned and executed well in advance. Chief General Manager at Head Office & Divisional Manager coordinate with District Administration. NOC of State Forest Department, permissions for utility shifting, tree cutting permission etc are procured before Appointed date.

MPRDC 13 Financial Closure Conditions Precedent are fulfilled before Financial Closure. State Support Agreement is executed amongst the State Government, MPRDC & the Concessionaire. Most of the projects of MPRDC have achieved Financial Closure in spite of nationwide scenario of Infrastructure sector wherein Financial Closures have become difficult. MPRDC facilitates Concessionaires to achieve Financial Closure. Appointed Date is the date of Financial Closure or the date of start of work which ever is earlier. Escrow mechanism is followed for all deposits & withdrawals.

Milestones during Construction Period Project Milestone- I: 180 th day from Appointed Date. Project Milestone- II: 365 th day from Appointed Date. Project Milestone- III: 600 th day from Appointed Date. Scheduled date for completion of Project is 730 th day from Appointed Date. In the event of failure of achieving project milestone, damages payable is 0.1% of Performance Security until such milestone is achieved. MPRDC 14

Monitoring during Construction  Monitoring of Project by Independent Engineer.  Appointed through open bidding as per Concession Agreement.  Regular monitoring by MPRDC officers.  Change of Scope & Extension of Time (EOT)  There is a Advisory Committee comprising of Technical Advisor, Chief Engineer (BOT), DGM (Technical), DGM (BOT), Concessionaire, Independent Engineer & Divisional Manager.  Advisory Committee examines the proposals of the Concessionaires & make the recommendations.  MD decides with the approval of BOD. MPRDC 15

Ensuring Quality 3-tier system of checking PMC of Concessionaire Independent Quality Control Engineer Officers of MPRDC Quarry approval after thorough testing. Field & lab testing is mandatory as per the norms of MORTH. Use of Graders for maintaining the camber at sub grade/GSB level. Crushed GSB Layer -1 (drainage) Coarse graded Grade-I. Layer -2 Close graded Grade-II. WMM in place of WBM with pavers. Use of Sensor Paver in place of mechanical paver for BT works. Use of RMC plant in place of normal concrete mixers. MPRDC

Dispute Resolution Conciliation  Amicable settlement through mediation of Independent Engineer.  Referring the dispute to the Secretary PWD & the Chairman of BOD of the Concessionaire for amicable settlement. Arbitration  Arbitration by a Board of Arbitrators.  There shall be a board of 3 arbitrators of whom each party shall select 1, and the 3 rd arbitrator shall be appointed by the 2arbitrator so selected.  Arbitration in accordance with the rules of Arbitration. MPRDC 17

Post COD Contractual Issues Maintenance  Annual Maintenance Programme  Roughness Test & BBD (Benkelman Beam Deflection) Test  Monitoring by Chief Engineer(Maintenance) & Divisional Manager.  Road Data System  Penalty for non-compliance Toll Collection-  MPRDC ensures toll collection with the help of District Administration.  Standardized software for automation Premium/ O&M Grant  As per Concession Agreement. Road Safety  Through Accident Response System. MPRDC 18

Our Strengths Concessionaire’s faith in MPRDC due to transparency in bidding process. Lender’s faith in MPRDC ensuring Financial Closure of BOT Projects. Deployment of Supervision and Quality Control Consultants with international expertise. Deployment of capable construction agencies with introduction of advance machineries and equipments. Adequate Budget provision for Annuity &VGF payments by the State Government. Annuity payment along with bonus on due date. MPRDC

Our Strengths Outsourcing of Expertise. Consultants are appointed for Feasibility Report/DPR and Supervision of Construction. Experts like Legal Advisor, Chartered Accountant, Company Secretary, Environment expert, MIS expert, Road Data System Engineer are engaged in house. In-house financial analysis. Planning is done well in advance at the head office level. Fast decision making. Political commitment & support. Concessionaires are treated as partner. Bills are cleared in 2 to 4 working days. All Stake holders are facilitated. MPRDC

Accident Response System Implementation of ARS system on PPP mode is probably a first in the world. State wide implementation of ARS will be first in country. ARS to address safety requirements in the larger perspective. Technical Assistance through ADB for capacity building in road safety. Accident Response System & Traffic Management Centre in Madhya Pradesh including operation & maintenance for 5 years with estimated cost of Rs crores has been proposed. A Road Safety Cell is created in MPRDC. MPRDC has engaged an agency for ARS on Annuity basis. ARS includes centralized call centre, GIS based automatic vehicle tracking system (AVTS), Computer aided dispatch system, Traffic Management Centre. MPRDC 21

Innovative Financial Models MPRDC BOT (Toll + Annuity) Model 2. BOT (Annuity) Model 3. Deemed Shadow Fee Model 4. OMT Model

Innovative Financial Models MPRDC 23 ProjectsCost (Crores) 24 Border Checkposts ROBs / RUBs1645

State Highway Fund MPRDC 24 GoMP has enacted the Madhya Pradesh Rajmarg Nidhi Adhiniyam 2012 to provide for the establishment of a Fund for investments in the highways & infrastructure projects of the State. Corpus of the Fund is 125 Crores (approx). Executive Committee under the Chairmanship of Chief Secretary to administer the fund. Sources of FundApplication of Fund All payments of PremiumFor Maintenance and Repair of Highways Proceeds towards encashment of Performance Security or Bid Security For Meeting any Development Cost of Highway or Infrastructure Project All returns on investments made out of the Fund For Project Preparation, Pre Tender Activities, Cost towards Utility Shifting, Land Acquisition

MPRDC 25 A country has to pay for its roads. Whether it has them or not, it pays more for those it does not have. So Lets Have them….. Connecting People Through Quality Infrastructure