Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.

Slides:



Advertisements
Similar presentations
Project Management.
Advertisements

Project Management Concepts
Advanced Energy Vehicle
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Project Kick-off 14-Jan-09.
The exhibition process The phases of an exhibition.
Flight Readiness Review New Mexico Space Grant Consortium University/Institution Team Members Date.
RockSat-C 2011 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
What is a project? Project Management Institute definition
Designing a Product Product design is usually a problem that requires a creative Design and/or manufacturing solution.
Systems Engineering Management
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
PROJECT MANAGEMENT Materials developed under the European programme:
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Introduction to Computer Technology
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
First-Year Engineering Program Performance Test 1: Design Concept Comparisons Objective and Goals Lab Procedure Analysis Test Readiness Review.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
Effective Methods for Software and Systems Integration
Continuing Embry- Riddle’s CubeSat Satellite Development Program Presented by Clayton G. Jacobs Embry-Riddle Aeronautical University, Prescott EagleSat.
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
LSU 06/23/04COSPAR 2004, HASP Presentation1 The High Altitude Student Platform (HASP) for Student-Built Payloads T.G. Guzik and J.P. Wefel Dept. of Physics.
IMPRS June Space Research, in praxis, illustrated by a ground-based example The „Ozonometer“ as a student project.
Steps to the Preliminary Design Review (PDR) ACES Presentation T. Gregory Guzik January 28, 2003.
Technological Design STS-118 Lunar Plant Growth Chamber Challenge © 2013 International Technology and Engineering Educators Association STEM  Center for.
Space Engineering 2 © Dr. X Wu, 2012
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
Project management Lecture 10. Topics covered Management activities Project planning Project scheduling Risk management.
Yazd University, Electrical and Computer Engineering Department Course Title: Advanced Software Engineering By: Mohammad Ali Zare Chahooki The Project.
LSU 01/17/2006Spring LaACES Schedule For the semester and the next few weeks.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Management & Development of Complex Projects Course Code MS Project Management Project Life Cycle & PM Process Groups Lecture # 4.
Project Life Cycle.
Project Management Process Groups and Knowledge Areas Source: PMBOK 4 th Edition Prepared
Individual Subsystem Testing Report New Jersey Space Grant Consortium with Rutgers University Stevens Institute of Technology 2/13/2012.
Lab 07: AEV Design Analysis Tool Advanced Energy Vehicle (AEV)
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
1 Mission Discussion & Project Reviews 祝飛鴻 10/14/93.
EE400D DOCUMENTATION INSTRUCTIONAL SERIES CRITICAL DESIGN REVIEW.
Project Management, Lifecycle and Documentation
ACES Spring 2003 Overview Where are we going? How are we going to get there?
GEEN 2850 / REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL (RFP) NUMBER: _01 FOR DESIGN CONCEPT OF THE CU Balloon Experimental Satellite (CUBESAT)
Critical Design Review (CDR)
Judges Score Card Overview Mark Turner NASA Ames Research Center.
RockSat-C 2013 FMSTR Full Mission Simulation Report University/Institution Team Members Date.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
September 10, FY 2003 Plans Bob Simmons. September 10, Introduction Overview of Project and Engineering Plans Project Plans Engineering Plans.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Planning of the EUSO-BALLOON project Sylvie Dagoret-Campagne on behalf of the JEM-EUSO collaboration, EUSO-BALLOON project manager LAL/France EUSO BALLOON.
2014 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
Tethered Aerostat Program Concept Design Review Team Name Conceptual Design Review University/College Team Members Date.
CMGT 410 Course Tutorial For more course tutorials visit
Fundamentals of Project Management and Schedule Development.
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
Systems Planning and Analysis
Systems Analysis and Design in a Changing World, 4th Edition
Overview of Project Planning
Chapter 6: Database Project Management
Software and Systems Integration
Configuration Management Why do we need it? What does it do?
Prof. S.L. David Anandaraj
Peer Review Agenda (Suggested).
Space Proximity Atmospheric Research above Tropospheric Altitudes
CMGT 410 HOMEWORK Perfect Education/ cmgt410homework.com.
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
Lockheed Martin Canada’s SMB Mentoring Program
Phase 4 PROTOTYPE Review the previous weeks assignment for 20 – 30 mins before beginning the presentation. This week is to make the students learn about.
Software Reviews.
Presentation transcript:

Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003

The Two End Points in a Project Inspiration Operation A miracle occurs

Some consider planning to be miraculous Why do planning? – Time constraints – Budget constraints – Personnel constraints – Physical Constraints – Flight Constraints – Any and all of above Provides structure to “think the problem through” increasing likelihood of project success

Purpose of Project Management Ensure meeting the project objectives within the allocated schedule & budget – Communication – Meetings – Reviews – Authorization – Record Keeping – Monitoring (testing) – Interface Control Not for assigning blame (usually)

Example Management Flow

The Project Life Cycle Phases that all projects go through from inception to completion DESIGN DEVELOPMENT FABRICATION INTEGRATION TESTING OPERATION PDR CDR FRR

The Design Phase “Paper” study of all issues including the following: – Define Objectives – Understand Constraints – Identify all subsystems & interfaces – Design hardware – Identify parts, costs & availability – Determine personnel needs – Establish schedule – Develop plan to achieve objectives

Preliminary Design Review (PDR) Organized by the ACES Program Results from your design phase Should show that you have “thought the problem through” Include written report and oral presentation PDR reviews will occur on Feb. 27, 2003 More on PDR next week

The Development Phase Detailed in-depth study including – Test hardware concepts by prototyping – Finalize designs – Purchase long lead items (identified at PDR) – Establish interface controls – Complete fabrication plan – Finish integration & test plans – Complete operations & data analysis plans

Critical Design Review (CDR) Organized by the ACES Program Results from your development phase Determines whether you are ready to begin building your payload Include written report and oral presentation Precise date should be identified during PDR

Payload Construction Phases Parts procurement Fabrication – Construct subsystems, test, fix, retest Integration – Assemble subsystems, test, fix, retest Testing – Payload qualification testing, fix, retest

Flight Readiness Review (FRR) Organized by the ACES Program Results from your construction phase – Particularly qualification testing Determines whether you are ready to participate in launch operations Include written report and oral presentation FRR will occur on May 1, 2003

Operations & Analysis Interface with launch team Prepare payload for launch Monitor during flight Collect & analyze data

Program Schedule Constraint Design1/21 – 2/26 PDR2/27 Development2/28 – 3/26 CDR3/27 (flexible) Construction, Integration, Testing 3/28 – 4/30 FRR5/1 Operations5/18 – 5/22

Other Project Constraints Budget Constraint – $500 per team Personnel Constraint – 3 members per team Physical Constraint – Weight 1 kilogram – 10 cm x 10 cm x 10 cm or “Coke can” size Flight Constraints – Shock, Thermal, Duration, Altitude