C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) Qalification/Functional Testing Bob Goeke January 3-4, 2008.

Slides:



Advertisements
Similar presentations
March 30, 2004NASA Goddard Space Flight Center Optical Assemblies for Space Environments: Characterization of W.L.Gore Flexlite with Diamond AVIMS for.
Advertisements

Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Palestine TV Test Jason Link University of Hawaii ANITA Collaboration Meeting at UCI 4/7/05 – 4/9/05.
Test readiness review ESA ’s prototype BLANC P-E LAMLyon October 2003 Mechanical test plan.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 1 GLAST Large Area Telescope LAT Pre-Shipment Review EMI/EMC Michael.
Tracker Subsystem1 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 GLAST LAT Tracker Tower7/9 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectPeer Review, March 24-25, E2 1 Gamma-ray Large Area Space Telescope 7E2: EM test plans GLAST Large Area Telescope: GLAST Large Area.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER PDR Mechanical Design Mechanical Design, CRaTER Assembly and Electronics Assembly Preliminary.
MPSRThermal- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Thermal Christopher Smith University of California - Berkeley.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) MISSION ASSURANCE Brian Klatt January 3-4, 2008.
1 - ASP-05-STR1-263 M054-1 Tous droits réservés © Alcatel Space Industries All rights reserved Star One C1 - Insurance Presentation 8 - Satellite Test.
C osmic R Ay T elescope for the E ffects of R adiation Telescope Mechanical Design Albert Lin The Aerospace Corporation Mechanical Engineer (310)
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) R. Foster January 3-4, 2008.
THEMIS F2/F3 IPSR and F4/F5 IPER 1 By Telecon, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW Thermal.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) MISSION ASSURANCE ACTIVITIES Brian Klatt September 10-11,
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Data Products & Production Pipeline Larry Kepko Boston University Center for Space Physics.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
C osmic R Ay T elescope for the E ffects of R adiation 6/27/06 Telescope Mechanical Design1 Albert Lin The Aerospace Corporation (310)
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) Installation Procedures/Orbiter Level Test Procedures Robert Goeke.
Glenn Research Center at Lewis Field Random Vibration Testing of Hardware Tutorial 1 Fatigue Life Assessment William O. Hughes/7735 Mark E. McNelis/7735.
FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THERMAL Chris Smith University.
C osmic R Ay T elescope for the E ffects of R adiation Mechanical Design CRaTER and the Electronics Assembly Matthew Smith Mechanical Engineer (617)
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) Environmental Test Planing Bob Goeke September 10-11, 2008.
The power supply system of the AMS experiment M. Menichelli, L. Accardo, G. Ambrosi, R. Battiston, M. Bizzarri, S. Blasko, D. Cosson, E. M. Fiori, O. Maris,
C osmic R Ay T elescope for the E ffects of R adiation Cosmic Ray Telescope for the Effects of Radiation (CRaTER): Science Overview Harlan E. Spence, Principal.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) Project and Independent Review Activity R. Foster September.
THEMIS PER 1 UCB, May 02, 2005 Magnetometer Booms Pre Environmental Review Prof. Hari Dharan Berkeley Composites Laboratory (Presenter: David Pankow) Department.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Critical Design Review May , 2011 Integration and Test Dave Curtis PFP Package Manager Mars.
PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested; supporting environmental tests Issues: –EUV alignment.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) Calibration Test Planning Justin C Kasper Smithsonian Astrophysical.
10-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : EMC Dave Curtis Mars Atmosphere and Volatile EvolutioN.
C osmic R Ay T elescope for the E ffects of R adiation June 27, 2005Larry Kepko - Data ProcessingPage 1 CRaTER Characterization Data Products & Production.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) Spacecraft I&T Mike Golightly September 10-11, 2008.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Thermal Analysis Huade Tan 6/27/05.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (PSR) Instrument Calibration Science Requirements Compliance Justin C Kasper.
IDPU F1 Test Review FGM Fluxgate Magnetometer Michael Ludlam University of California - Berkeley.
20-1 MAVEN iPSR Oct 30-31, 2012 Particles and Fields Package Pre-Ship Review October 30-31, PFDPU D. Gordon, W. Donakowski & PFDPU Team Mars.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration with PFP, Qualification, ATLO 2011 March 28 Dave Curtis.
C osmic R Ay T elescope for the E ffects of R adiation CDR v1 Telescope Mechanical Design Albert Lin The Aerospace Corporation Mechanical Engineer (310)
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) Thermal Analysis Christine Cottingham LM/GSFC 545 Hume Peabody GSFC.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
C osmic R Ay T elescope for the E ffects of R adiation 27 June 2005 Digital Engineering Digital Sub-System Bob Goeke.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) Calibration Test Planning Justin C Kasper Smithsonian Astrophysical.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) Environmental Test Planing Bob Goeke September 10-11, 2007.
FIELDS MEP Thermal Vacuum Cycling iPER
Gayle K. Martin November 14, 2016
THEMIS INSTRUMENT SUITE FM4/FM5 PRE-ENVIRONMENTAL REVIEW
(EFW Systems Engineer) University of California, Berkeley
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2007.
Solar Probe Plus – FIELDS Main Electronics Package
FIELDS SCM Thermal iPER
LAT Requirements Verification in TVAC
CONTOUR NGIMS PRE-SHIP REVIEW
CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2008.
7E: Tower test plans GLAST Large Area Telescope: Tracker Subsystem
CRaTER Pre-Environmental Review (I-PER) Spacecraft Interfaces Bob Goeke September 10-11, 2007.
CRaTER Pre-Ship Review (I-PSR) Instrument Configuration Bob Goeke
Digital Sub-System Bob Goeke.
CRaTER Pre-Environmental Review (I-PER) Spacecraft I&T Mike Golightly
Integration and Test Organization Chart
CRaTER Pre-Ship Review (I-PSR) RFA Status Bob Goeke
CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2007.
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2008.
Systems Engineering (plus Data, Digital, Power)
CRaTER Pre-Environmental Review (I-PER) Spacecraft Interfaces Bob Goeke September 10-11, 2008.
Presentation transcript:

C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) Qalification/Functional Testing Bob Goeke January 3-4, 2008

C osmic R Ay T elescope for the E ffects of R adiation Qual Test/Vibration -- SN2 Vibration Tests ( ) -- 9/25-26/07 –Sine; Loads - Sine Burst; Random -- all to ProtoFlight Levels

C osmic R Ay T elescope for the E ffects of R adiation Qual Test/Vibration -- SN2

C osmic R Ay T elescope for the E ffects of R adiation Qual Test/Vibration -- SN2 No exceptions to success criteria 1.Complete testing to limit levels with the appropriate test factor. 2.No structural degradation after test. 3.No unexplained frequency shifts more than 5% between pre and post test. 4.No Visible damage that is a result of the test environment. 5.Pass all functional performance testing performed during and upon completion of the test.

C osmic R Ay T elescope for the E ffects of R adiation Qual Test/TV -- SN2 Thermal-Vacuum Testing -- 9/27-10/5/07 –+40C Hot soak/turn on/Long Form Functional –-40C Cold soak/turn on/Long Form Functional –7 more +40/-40 cycles with instrument always on; Short Form Functionals Success defined by no significant shifts in parameters given in Trend Analysis List –Sole variance was increase in noise of detector D6 from 0.7 ADU rms to 1.6 ADU rms –Limit in LFF for shifts is 0.3 ADU rms –Limit in SFF for absolute value is 2.0 ADU rms –Science requirement is 8 ADU rms maximum

C osmic R Ay T elescope for the E ffects of R adiation CRaTER T-Vac Setup Vacuum Chamber is a 2’x2’x2’ stainless steel chamber Interface plate to drive the spacecraft interface temperatures TQCM in chamber to monitor bakeout Cobalt 60 source for use during long form functional tests Power source and spacecraft simulator feed through in chamber

C osmic R Ay T elescope for the E ffects of R adiation Thermal-Vacuum Timeline

C osmic R Ay T elescope for the E ffects of R adiation Qual Test/EMC -- SN2 EMC/EMI Tests ( ) -- 10/15-23/07 –CE01: minor limit failure

C osmic R Ay T elescope for the E ffects of R adiation Qual Test/EMC -- SN2 EMC/EMI Tests ( ) -- 10/15-23/07 –CE03: minor limit failure

C osmic R Ay T elescope for the E ffects of R adiation Qual Test/EMC -- SN2 RE02: major limit failure

C osmic R Ay T elescope for the E ffects of R adiation Qual Test/EMC -- SN2 Made change to SN1 (not yet buttoned up): removed bus voltage/current housekeeping telemetry sense points. Reran RE02 with SN1 –RE02: less bad limit failure

C osmic R Ay T elescope for the E ffects of R adiation Qual Test/EMC -- SN2 Completed remaining EMC tests with SN1 –CS01, CS02, CS06 passed –RS06: instrument fails in MHz range when exposed to launch site environment –RS06: instrument passes when exposed to LRO operational environment

C osmic R Ay T elescope for the E ffects of R adiation Qual Test/Vibration Retest Retest consisted of one axis (Z) random vibration at 10.1 grms –passed Qual Test/Thermal-Vac Retest Retest consisted of one +40/-40 thermal-vacuum cycle –included hot/cold survival soak and turn-on –Long Form Functionals both hot and cold –passed

C osmic R Ay T elescope for the E ffects of R adiation