SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting for SunGuide Release 4.1 October 14, 2008 1.

Slides:



Advertisements
Similar presentations
SunGuide TM Software Development Project Release 4.0 Data Fusion Follow-Up DR Jan. 8, 2008 Updated: Jan 4, 2008, 11:00 am.
Advertisements

SunGuide TM Software Development Project Release 3.1: I-95 Express Lanes Design Review Follow-up January 29, 2008.
Current Status of the FDOT SunGuide SM Software Project Robert W. Heller, Ph.D. March 16, 2005.
The Enterprise Guide to Video Conferencing Created using iThoughts [...] [...]
Components of GIS.
FDOT Central Office ITS Deployment Update Gene Glotzbach, P.E. Traffic Engineering and Operations Office.
FDOT Central Office ITS Software Update
COURSE: COMPUTER PLATFORMS
DESIGN AND IMPLEMENTATION OF SOFTWARE COMPONENTS FOR A REMOTE LABORATORY J. Fernandez, J. Crespo, R. Barber, J. Carretero University Carlos III of Madrid.
ITE PC v4.0 Chapter 1 1 Operating Systems Computer Networks– 2.
February 9, 2006TransNow Student Conference Using Ground Truth Geospatial Data to Validate Advanced Traveler Information Systems Freeway Travel Time Messages.
Design of Web-based Systems IS Development: lecture 10.
SYSTEMS DEVELOPMENT Phases, Tools, and Techniques
INFO 355Week #61 Systems Analysis II Essentials of design INFO 355 Glenn Booker.
These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer.
Statewide Transportation Management Center Software Library System Status Meeting February 17, 2004.
02/25/11 Connected Vehicle Design Review Southwest Research Institute 1.
Healthy Kids Zone Team Introduction Chad Honkofsky 2.
RUP Fundamentals - Instructor Notes
Using the WDK for Windows Logo and Signature Testing Craig Rowland Program Manager Windows Driver Kits Microsoft Corporation.
1 ITS America Palm Springs, CA June 6, 2007 SunGuide SM Software – Florida's ITS Software ITS America Palm Springs, CA June 6, 2007 Trey Tillander, P.E.
SunGuide SM Software Development Project Status Meeting March 9, 2004.
SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting for SunGuide Release 4.0 August 18, 2008 August 18,
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
Testing Web to Wireless …and Back March 2001 Presenter: Shirley DeLewis, CQA, CSTE, CPSA.
SunGuide SM Software Development Project Test Readiness Review (TRR) Meeting January 11, 2005.
Project Management Methodology Project Closing. Project closing stage Must be performed for all projects, successfully completed or shut off by management.
ITS Program Update Moving Towards Implementation of Wireless Connectivity in Surface Transportation Talking Freight Webinar January 19, 2011.
May 16, 2007Change Management Board Meeting1 Local: Toll-Free: Ext
Smartphone Application for Road Rangers Tucker Brown Roger Strain Robert W. Heller, Ph.D. Southwest Research Institute San Antonio, Texas USA.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
July 14, 2010SunGuide SMD Kickoff Meeting1 BDQ69 SunGuide Support, Maintenance and Development Enhancement Contract July 14, 2010 Kickoff Meeting.
SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting August 27, 2007.
SunGuide SM Software: Development Status Robert W. Heller, Ph.D. July 14, 2004.
MACCE and Real-Time Schedulers Steve Roberts EEL 6897.
SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review.
SunGuide SM Software Development Project Status Meeting December 7, 2004.
SunGuide SM Software Development Project Test Readiness Review (TRR) Meeting November 1, 2005.
SunGuide SM Software Development Project Status Meeting July 13, 2004.
Lecture 8: 9/19/2002CS149D Fall CS149D Elements of Computer Science Ayman Abdel-Hamid Department of Computer Science Old Dominion University Lecture.
SunGuide SM Software Development Project Status Meeting May 10, 2005 CDRL
SunGuide TM Software Development Project Release 4.0 Kick-off Meeting October 15, 2007.
SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting October 1, 2007.
SunGuide SM Software Development Project Status Meeting April 29, 2004.
SunGuide TM Software Development Project Release 3.1: I-95 Express Lanes GUI Design Review March 10, 2008.
SunGuide SM Software Development Project Status Meeting October 13, 2004.
SunGuide SM Software Development Project End of the Year ITS Working Group Meeting December 7, 2005.
SunGuide SM Software Development Project Test Readiness Review (TRR) Meeting November 1, 2005.
SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting November 27, 2007.
Next VVSG Training Security: Testing Requirements October 15-17, 2007 Nelson Hastings Alicia Clay Jones National Institute of Standards and Technology.
Real Time Bus Information Walt Lenz, Safety & Security Manager Cyndi Raskin-Schmitt, Manager of Communications Pinellas Suncoast Transit Authority St.
CIS 375 Bruce R. Maxim UM-Dearborn
DEPARTMENT OF COMPUTER SCIENCE
COS 260 DAY 17 Tony Gauvin.
Printers.
Agenda Time Item Lead 8:30 – 8:35 Introductions Liang Hsia 8:35 – 8:50
ATO over ETCS Benoît BIENFAIT 10/2/2016.
Networking for Home and Small Businesses – Chapter 2
SunGuideSM Software: Development Status Steven W. Dellenback, Ph. D
Agenda Time Item Lead 10:00 – 10:05 Introductions Liang Hsia
Systems Analysis and Design in a Changing World, 6th Edition
SunGuideTM Software Development Project Release 3
SunGuideTM Software Development Project Release 3. 1
Networking for Home and Small Businesses – Chapter 2
Milestone Demonstration #1
Agenda Time Item Lead 8:30 – 8:35 Introductions Liang Hsia 8:35 – 8:45
IS4680 Security Auditing for Compliance
SunGuideSM Software Development Project Status Meeting and Demonstration April 5-6, 2005 CDRL
Exercise Name player Briefing
NMDWS Internship Portal
Presentation transcript:

SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting for SunGuide Release 4.1 October 14,

October 14, 2008SunGuide 4.1 TRR 2 Introductions

October 14, 2008SunGuide 4.1 TRR 3 Agenda Date / TimeItemLead October 14 8:30 – 9:30 Test Readiness Review (TRR) Meeting:  Discuss project status  Discuss testing process  Review test procedures  Discuss lab configuration  Open discussion Dellenback Robert Heller October 14 9:30 – 10:00 Training on new functionalityRoger Strain October 14 10:00 – 10:15 Break October 14 10:15 – 12:00 IC-1: Admin Editor (AE) IC-2: Graphical User Interface (GUI) SwRI Team October 14 1:00 – 5:30 IC-3: Data Archive (DA) IC-4: Probe Fusion (PF) IC-5: Automatic Vehicle Identification/License Plate Reader SwRI Team October 15 8:30 – 12:00 IC-6: Alternate Routes (AR) IC-7: Travel Times (TvT) IC-8: Miscellaneous (MISC) IC-9: Travel Time Computation (TVTC) SwRI Team October 15 1:00 – 5:30 Footprints Testing:  659, 678, 688, 689, 735, 741, 749, 755, 777, 793, 796, 803, 807, 809, 815,817, 822, 825, 826, 836 Regression Tests: D5 FL ATIS Transition Retest / revisit open issues SwRI Team October 16 8:30 – 11:00 Wrap up discussions:  IV&V  Deployment activities planned FDOT CO All

October 14, 2008SunGuide 4.1 TRR 4 Logistics Test location: –ITS Demo Lab Breaks: –Rolling Lunch –SwRI Cafeteria Internet: –Available in the lobby (100baseT connection) Restrooms Lobby Demo Lab

October 14, 2008SunGuide 4.1 TRR 5 Current Project Status Release 4.1 Development Complete 79 Requirements SwRI has exercised the system –Unit testing –Ad hoc testing –Dry runs of the SICP

October 14, 2008SunGuide 4.1 TRR 6 Architecture: What Changed?

October 14, 2008SunGuide 4.1 TRR 7 Test Hardware Layout

October 14, 2008SunGuide 4.1 TRR 8 Discuss Lab Configuration

October 14, 2008SunGuide 4.1 TRR 9 Discuss Lab Configuration : SwRI Server Farm SAN: –Two drive bays –6 fiber connected hosts FAT: –Four DL380s: Fermat Pythagoras Laplace Kepler Development: –Six DL380s –Eight DL370s

October 14, 2008SunGuide 4.1 TRR 10 Environment Note Note that SwRI has both “real” equipment and simulators in the lab There are times that the simulators “mis-behave” and we find ourselves “re-testing” to achieve the results The “re-tests” do NOT require software modifications For example, one time a drunk driver took out the power (actually causing a short on the power lines and toasted a number of devices such as voice mail) to SwRI and the Cortec Codecs have never been the same. SwRI has other project’s that will occasionally (accidentally) “hit” our development devices

October 14, 2008SunGuide 4.1 TRR 11 Discuss Testing Process Purpose: –Review preparations for testing –Walk through the test procedures at a very high level and determine if anyone has any comments Ground Rules: –Testing will not depart from the written procedures –Any requested “ad hoc” testing will occur after the formal testing process –Re-writing of requirements / scope additions will be captured for future consideration Approvals: –FDOT/SwRI will witness each test case (on “Master SICP”) –At the conclusion, FDOT will sign SICP cover page to acknowledge all tests were executed as written/noted in the “Master SICP”

October 14, 2008SunGuide 4.1 TRR 12 How Testing Will Occur For each Integration Case (IC): –SwRI will explain the objective of the IC –Requirements will be reviewed –A “reader” will walk through each test case (see next slide for an ‘example’ test case) –An “operator” will perform the GUI actions –Results will be captured –Note: Enhancements will be captured for future review by FDOT

October 14, 2008SunGuide 4.1 TRR 13 Test Case Example

October 14, 2008SunGuide 4.1 TRR 14 Review Test Procedures IC-1: Admin Editor (AE) IC-2: Graphical User Interface (GUI) IC-3: Data Archive (DA) IC-4: Probe Fusion (PF) IC-5: Automatic Vehicle Identification/License Plate Reader (AVI/LPR) IC-6: Alternate Routes (AR) IC-7: Travel Times (TvT) IC-8: Miscellaneous (MISC) IC-9: TvT Computation (TvTC)

October 14, 2008SunGuide 4.1 TRR 15 General Discussion Questions About Test Cases?

October 14, 2008SunGuide 4.1 TRR 16 Open Discussion

October 14, 2008SunGuide 4.1 TRR 17 Agenda Date / TimeItemLead October 14 8:30 – 9:30 Test Readiness Review (TRR) Meeting:  Discuss project status  Discuss testing process  Review test procedures  Discuss lab configuration  Open discussion Dellenback Robert Heller October 14 9:30 – 10:00 Training on new functionalityRoger Strain October 14 10:00 – 10:15 Break October 14 10:15 – 12:00 IC-1: Admin Editor (AE) IC-2: Graphical User Interface (GUI) SwRI Team October 14 1:00 – 5:30 IC-3: Data Archive (DA) IC-4: Probe Fusion (PF) IC-5: Automatic Vehicle Identification/License Plate Reader SwRI Team October 15 8:30 – 12:00 IC-6: Alternate Routes (AR) IC-7: Travel Times (TvT) IC-8: Miscellaneous (MISC) IC-9: Travel Time Computation (TVTC) SwRI Team October 15 1:00 – 5:30 Footprints Testing:  659, 678, 688, 689, 735, 741, 749, 755, 777, 793, 796, 803, 807, 809, 815, 817, 822, 825, 826, 836 Regression Tests: D5 FL ATIS Transition Retest / revisit open issues SwRI Team October 16 8:30 – 11:00 Wrap up discussions:  IV&V  Deployment activities planned FDOT CO All

October 14, 2008SunGuide 4.1 TRR 18 Agenda Date / TimeItemLead October 14 8:30 – 9:30 Test Readiness Review (TRR) Meeting:  Discuss project status  Discuss testing process  Review test procedures  Discuss lab configuration  Open discussion Dellenback Robert Heller October 14 9:30 – 10:00 Training on new functionalityRoger Strain October 14 10:00 – 10:15 Break October 14 10:15 – 12:00 IC-1: Admin Editor (AE) IC-2: Graphical User Interface (GUI) SwRI Team October 14 1:00 – 5:30 IC-3: Data Archive (DA) IC-4: Probe Fusion (PF) IC-5: Automatic Vehicle Identification/License Plate Reader SwRI Team October 15 8:30 – 12:00 IC-6: Alternate Routes (AR) IC-7: Travel Times (TvT) IC-8: Miscellaneous (MISC) IC-9: Travel Time Computation (TVTC) SwRI Team October 15 1:00 – 5:30 Footprints Testing:  659, 678, 688, 689, 735, 741, 749, 755, 777, 793, 796, 803, 807, 809, 815, 817, 822, 825, 826, 836 Regression Tests: D5 FL ATIS Transition Retest / revisit open issues SwRI Team October 16 8:30 – 11:00 Wrap up discussions:  IV&V  Deployment activities planned FDOT CO All

October 14, 2008SunGuide 4.1 TRR 19 Agenda Date / TimeItemLead October 14 8:30 – 9:30 Test Readiness Review (TRR) Meeting:  Discuss project status  Discuss testing process  Review test procedures  Discuss lab configuration  Open discussion Dellenback Robert Heller October 14 9:30 – 10:00 Training on new functionalityRoger Strain October 14 10:00 – 10:15 Break October 14 10:15 – 12:00 IC-1: Admin Editor (AE) IC-2: Graphical User Interface (GUI) SwRI Team October 14 1:00 – 5:30 IC-3: Data Archive (DA) IC-4: Probe Fusion (PF) IC-5: Automatic Vehicle Identification/License Plate Reader SwRI Team October 15 8:30 – 12:00 IC-6: Alternate Routes (AR) IC-7: Travel Times (TvT) IC-8: Miscellaneous (MISC) IC-9: Travel Time Computation (TVTC) SwRI Team October 15 1:00 – 5:30 Footprints Testing:  659, 678, 688, 689, 735, 741, 749, 755, 777, 793, 796, 803, 807, 809, 815, 817, 822, 825, 826, 836 Regression Tests: D5 FL ATIS Transition Retest / revisit open issues SwRI Team October 16 8:30 – 11:00 Wrap up discussions:  IV&V  Deployment activities planned FDOT CO All