LHCb HCAL PMT problems HAMAMATSU studies 1 Yu. Guz.

Slides:



Advertisements
Similar presentations
ECAL and HCAL status 1Yu. Guz 2014/11/26. TED shots, 24-Nov 2Yu. Guz 2014/11/26.
Advertisements

Daylight Savings No matter what its orientation, only half the Earth gets sunlight at any given time. But the amount of sunlight, in terms of the length.
Line Efficiency     Percentage Month Today’s Date
Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
Mechanical check of PMT Check base: Remove black tape and two small screws that secure the base. Tighten the nuts on the BNC connector for the HT input.
Hamamatsu Photonics K.K. Electron Tube Division R for ICECUBE 1.Delivery Record and Plan 2.Specification of R Test Result at Hamamatsu.
Phase Shifts of Sinusoidal Graphs. We will graph sine functions of the following form: The amplitude A =  A  The period T = 22  The phase shift comes.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
No dead cells (yet) The integrated luminosity since the last meeting: 477 pb -1 ; since the last TS: 609 pb -1 ; smooth operation since the last meeting,
Studies of radiation hardness of ECAL modules 1Yu. Guz 2013/05/28.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
1 TOF Aging Discussion Background information Summary of results so far Examples of gain loss mechanisms Diagnostics Possible scenarios for 2006 Discussion.
WP1.2 – Photon Detectors Stephan Eisenhardt University of Edinburgh  Budget  Milestones  Progress Report  Partners: International Collaborating Groups.
1 Max-Planck-Institut fuer Physik, Muenchen, Germany, 2 Humboldt-Universituet Berlin, Germany, 3 Univ. Complutense, Madrid, Spain, 4 ETH, Zurich, Switzerland,
Monitoring system of the LHCb electromagnetic calorimeter NEC’2007, Varna, Bulgaria Ivan Korolko (ITEP Moscow)
Improved PMTs for the Cherenkov Telescope Array project Razmik Mirzoyan for the Focal Plane Instrumentation WG Max-Planck-Institute for Physics Munich,
SLAC, HiRes T-461: “FLASH” part 1 Justin Findlay.
ECAL LED monitoring system upgrade R&D status V. Egorychev, P. Shatalov, A. Zhokhov (ITEP, Moscow, Russia) E. Chernov, Yu. Guz, V. Obraztsov (IHEP Protvino,
HCAL status and plans Yu. Guz.  Finally, no dead cells in the run However: There are unstable PMTs (mainly rate effect) Dark current.
U. Akgun, HCAL Fall Meeting, 11/11/2004, Fermilab, IL HF PMT ISSUES By Ugur Akgun The University of Iowa.
Scanning the irradiated ECAL modules with 137 Cs source Yu. Guz 2011/12/161.
ECAL LED monitoring system upgrade Pavel Shatalov ITEP, Moscow, Russia Yuri Guz IHEP Protvino, Russia.
ECAL and HCAL status 1Yu. Guz 2015/02/18. ECAL maintenance 2Yu. Guz 2015/02/18 There were 22 non operational cells at the A side, because of 3 dead CW.
28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending.
Yu. Guz 13/06/ ECAL LED system : degradation of clear fibers The radiation degradation of clear fibers of the LED system is (still) well pronounced.
1 A.Tsirigotus Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch The NESTOR O.M.
1 Yu. Guz HCAL status 22/06/ Yu. Guz HCAL 137 Cs calibration The 3 rd run in 2011 was performed at the technical stop, May-09. Two source passages,
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
Calo preparation for 2015 Goals: -Trigger stability -Good calibration for HLT2 processing -Improved calibration ( timing, e/gamma response) for all calo.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED News New LED scan and stability data for ECAL were.
Cold PM test at Indiana final measurements, September 9 – 24, 2007 PM under test: Hamamatsu R7725 serial # ZK3692 (tube with Pt underlayer) Hans-Otto Meyer.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
ECAL and HCAL technical status 1Yu. Guz 2015/09/02.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
Upgrade of the LHCb ECAL monitoring system Yu. Guz (IHEP Protvino / CERN), on behalf of the LHCb collaboration 07/04/2014.
1 Upper Basin Snowpack as of 3/26/2014
Yu. Guz 08/02/20121 HCAL 2011/2012 shutdown activities.
PMT test device setup functionality –reproducibility of output signal –dynamic range –limitations –test duration conclusion T. Wälchli, TT-Meeting Brussels,
E. Picatoste, D. Gascon PMT afterpulsing and SPD trigger 1 Looking to the problem from the instrumentation point of view LHCb Calorimeter Meeting – CERN.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
PMT AFTERPULSE STUDIES By Ugur Akgun The University of Iowa.
The Results of 10 Additional PMT Tests 1.Timing of afterpulse 2.ADC readout 3. Conclusion TTU HEP Group Meeting, Apr. 14, 2004.
The photomultiplier tubes selection for KM2A electromagnetic particle detectors (EDs) hou chao IHEP The 2nd workshop of air shower detection at high altitudes.
Inventory of the ECAL spare Inner modules Scanning with 137 Cs 1Yu. Guz 2013/12/04 There are 32 spare ECAL Inner modules stored in b The purpose.
Proposal for the after-pulse effect suppression  Observation of pulses and after-pulses  Shape measurement  Algorithm  Results  Efficiencies for after-pulse.
YOSEMITE BY ARSAL.
Characterization of the ETEL and HZC 3+ inch PMTs
Jan 2016 Solar Lunar Data.
JMU Dark Current Tests By: Kevin Nash.
PMT/CW Irradiation tests-2010
ACTIVE DIVIDER for anode currents up to 10 microamps
Comparative Statistics September 2017
Average Monthly Temperature and Rainfall
Comparative Statistics June 2017
80-Hour SHARP Certification Course Schedule
LHCb HCAL: performance and calibration
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Presentation transcript:

LHCb HCAL PMT problems HAMAMATSU studies 1 Yu. Guz

degraded PMTs sent to HAMAMATSU (11) 2 Yu. Guz PMT serial#gain degradationdark current rate effectworking currentworking HV factorat working HVat 1 kV2 hours after the(from collisions)before since 2009nA start of collisions nAreplacement, kV AA LA LA LA LA LA LA LA LA LB LB rate effect: measured in situ (on HCAL) with LED monitoring system during the LHC data taking, measured as a ratio of LED flash response 2 h after LHC collision start. dark current: measured in situ (on HCAL), no collisions, no LED flashes working current: the DC current caused by physics events during the LHC collisions gain degradation: ratio of LED amplitudes in 2009 to the LED amplitude right before the dismounting, recalculated for the same HV working HV before replacement: it is rather high for many of these PMTs because we had to compensate the gain degradation

DC test result at HAMAMATSU 3 Yu. Guz Type number:R Serial Number CathodeAnodeBlueGainDark CurrentV-I (Shipping Month) Sens 1000V1250V1500V1800V Judgement (µA/lm)(A/lm)Index(E+06)(nA) 1800V/1250V AA2009 (Apr.2003) Shipping Data Failed Retest Result LA1413 (Jan.2004) Shipping Data Failed Retest Result LA2058 (Sep.2003) Shipping Data Failed Retest Result LA2091 (Sep.2003) Shipping Data Failed Retest Result LA4457 (Jan.2004) Shipping Data Failed Retest Result LA8487 (Jul.2004) Shipping Data Failed Retest Result LA9057 (Jul.2004) Shipping Data Failed Retest Result LA9772 (Jul.2004) Shipping Data Failed Retest Result LA9869 (Jul.2004) Shipping Data Failed Retest Result LB0031 (Jul.2004) Shipping Data Failed Retest Result LB0086 (Jul.2004) Shipping Data Failed Retest Result Specifications 70 Min.9 Min.-2.5 Max.--

afterpulse test at HAMAMATSU (1/3) 4 Yu. Guz

afterpulse test at HAMAMATSU (2/3) 5 Yu. Guz

afterpulse test at HAMAMATSU (3/3) 6 Yu. Guz Conclusion: afterpulses are moderate, no problem with vacuum

black paint has been removed for further studies 7 Yu. Guz

emission studies (1/5) 8 Yu. Guz

emission studies (2/5) 9 Yu. Guz

emission studies (3/5) 10 Yu. Guz

emission studies (4/5) 11 Yu. Guz

emission studies (5/5) 12 Yu. Guz