1100 Superior Ave., Suite 300441 Wolf Ledges Parkway, Suite 300990 West Third Avenue Cleveland, OH 44114Akron, OH 44311Columbus, OH 43212 216-861-2020330-535-3132614-306-6374.

Slides:



Advertisements
Similar presentations
Not Your Father’s Older Brother’s LEED: Energy & Commissioning Opportunities in LEED v4 Mark Gelfo, PE LEED AP BD+C, LEED AP O+M, CxA, EMP Director of.
Advertisements

Energy Sub-Metering for Measurement and Verification
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
Sustainability and Energy ServicesSustainability and Energy Services.
LEED® HVAC Design LEED® Commissioning How Does the Mechanical Engineer & Cx Provider Impact the Success of a Sustainable Building? Presented by MBO Inc.
Commissioning: The Most Important Component of LEED ® by Rick Miller, PE, LEED AP RNM Engineering, Inc. San Luis Obispo, CA.
Sustainability and Commissioning for Military Facilities WHAT IT IS AND WHAT IT IS NOT! Dan Jackson, PE, Vice President Tim Whitley, PE, CxA, CCP, LEED.
BPA Guidelines for Measurement & Verification of Energy Efficiency Measures Presented at Brown Bag Session November 29, 2006.
Energy Performance Analysis with RETScreen
MEASUREMENT & VERIFICATION
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
There is Much More to Protocols than Good M&V Steve Kromer Chair, IPMVP Inc. Paolo Bertoldi European Commission DG JRC.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Building Enclosure Commissioning (BECx): Practical Project Implementation.
ASHRAE Guideline The Commissioning Process Building Commissioning Association Northeast Chapter Thomas Anderson, CCP.
Technical And Financial Benefits Of Retro-Commissioning Initiatives Society of American Military Engineers Northern Virginia Post January 6, 2011 Presented.
Building Commissioning
ENERGY CONSERVATION TEAM (Facility Audits and Recommissioning )
Benchmarking State Buildings Karen Herter, Heschong-Mahone Group (HMG) Mike Langley, Dept. of General Services (DGS) April 8, 2008.
Commissioning Presentation For Society of American Military Engineers (SAME) George Washington University Chapter February 25, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
The Future of Commissioning for Sustained Building Performance Birmingham, AL SERBCA Fall Conference Proposed LEED Requirements for Commissioning.
REVIEW Green Professional Building Skills Training Construction Management.
Leveraging an Energy Plan Managing Energy to Reduce Operating Cost and Improve Building Valuation.
Building Commissioning: It’s a Process For a Reason Presented by Rick Scivally CHFM, CHSP, CBCP, LEED AP.
The 5 th Annual Conference on Total Building Commissioning 2009 Commissioning Changes in LEED 2009 Paul McCown, PE, CxA, LEED AP, CEM SSRCx, LLC.
Green Building Demonstration Project Adam Saling City of San Diego.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
August 10, 2007 CONTROL YOUR DATA CENTER! Tune your Legacy Data Center to improve overall efficiencies.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
Commissioning for Sustained Building Performance Building Performance Birmingham, AL Marriott 9/29/11 Introduction to Commissioning and Retro-Commissioning.
Dan Frasier, PE, CCP Successful Turnover of New and Renovation Construction Projects Successful Turnover of New and Renovation Construction.
Presentation to HOK. 2rw.com NET ZERO ENERGY. SITE < or = renewable energy generated Building produces as much energy as it uses over the course of a.
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
2 of 45 WELCOME TO BUILDING COMMISSIONING 101 Building Commissioning Association.
Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,
MBCx Projects – Programs, Process, and Results Soda, Tan, Shields and Wurster David Jump, Ph.D., P.E., Matt Denny, P.E. Quantum Energy Services & Technologies,
Introduction to Integrated Chiller Retrofits Dr. Lisa Gartland (510) ,
© 2009 AirAdvice, Inc. Increasing Profitability Through Energy Services A Comprehensive Program To Deliver Energy and Sustainability Services.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
Phoenix Convention Center Phoenix, Arizona Lessons Learned from ARRA Projects Solution ShowcaseLessions Learned from ARRA Projects Walter Tersch, LEED.
Name of Building(s) or Project Speaker(s) Organization(s)
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
Building Commissioning: Cx 101 Brock Graham, Gilbane Building Co. Michael Gannon, BVH Integrated Services November 15, 2010.
Birmingham, AL SERBCA Fall Conference Presented by: Gary Sweatt, CxA, QCxP.
Halcom Consulting llc Sustainability Consulting & Commissioning 2917 Carlisle NE Suite 109 Albuquerque, New Mexico p f
Energy Design of Buildings using Thermal Mass Cement Association of Canada July 2006.
IND4623 Sustainable Design Applications Spring 2012 Term Southwest Florida College Professor: Tamara Chesney.
Introduction to Energy Management Doty, Steve & Turner, Wayne. (2009). Energy Management Handbook. Lilburn, GA: The Fairmount Press. Jacobsen, J. (2011).
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Energy & Atmosphere. Hydroelectric Water Use (USGS): Energy & Atmosphere: Renewable Energy.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
Commissioning HVAC Systems: Lessons learned throughout
the Basic Commissioning (Cx) Process
1 Potomac Electric Power Company Case 9155 & Delmarva Power & Light Case 9156 EmPOWER MARYLAND DRAFT NON-RESIDENTIAL ENERGY EFFICIENCY AND.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
Presented to The Raymore Peculiar Schools Board of Education Van McLain Energy Educator/Manager February 26 th, 2007Energy Management Conservation Program.
CxA at Georgia Tech TRAINING OUTLINE Epsten Group, Darren Draper
Introduction to LEED Building Commissioning
Sean Weber Energy Engineer
Energy Saving Bureau Industrial energy audits in coherence with Directive on the promotion of end-use efficiency and energy services.
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
Monitoring-Based Commissioning what is it and how can I use in in LEED v4 Administrated by.
LEED BD+C – Integrative Process
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
2018 Retro-Commissioning (RCx) Program
Presentation transcript:

1100 Superior Ave., Suite Wolf Ledges Parkway, Suite West Third Avenue Cleveland, OH 44114Akron, OH 44311Columbus, OH Douglas S. Lancashire, P.E., CEM, LEED AP The Commissioning Process and Measurement & Verification

“Building Commissioning is the systematic process of ensuring, through documented verification, that all building systems are installed and perform in accordance with the design intent.” DEFINING COMMISSIONING

Controls Operating Costs & Energy Consumption Fewer E&O’s Results in Fewer Change Orders Reduces Start-up / Comfort Problems Tighter A/E Fees Complexity of Modern Buildings: Digital Controls Critical Building conditions Technology WHY IS COMMISSIONING NEEDED?

Quality Design Intent Verification Value Engineering Comfort Energy Efficiency Sustainable Performance

PROJECT KICKOFF Kickoff Meeting Integrate Cx Tasks into Schedule Review / Assist in Developing OPR Review BOD Develop Collaborative Approach DESIGN REVIEWs Commissioned Systems Building Envelope HVAC Controls Lighting Controls LEED Compliance Work with Team to Resolve Issues DEVELOP TEST CRITERIA Commissioning Specifications Prefunctional Checklists Functional Test Procedures CONSTRUCTION Monitor Schedule for Cx Tasks Shop Drawing Review Construction Observation Identify Issues and Work with Team to Develop CAP & Resolve TESTING Witness Start Up / Review Forms Witness TAB / Review Report Prefunctional Checklists Functional Testing Seasonal Testing ISSUES RESOLUTION Develop Issues Log and Work with D/B Team to Develop CAP & Resolve Set Up & Review Trend Logs Data Loggers Thermal Imaging CONSTRUCTION CLOSEOUT O&M Review Ensure Training is Adequate Develop Commissioning Report Develop Systems Manual Upload LEED Documents POST-OCCUPANCY Review Actual Utility Data Comfort Survey 10 Month Walkthrough Meet with Maintenance Staff Identify Warranty Issues Measure and Verify Retest

Pre-Requisite – Fundamental Commissioning Must be independent, but can be employed by the Design or Construction Firms for smaller project The CxA reviews the OPR and BOD documents for clarity and completeness At a minimum, must commission the following systems: HVAC (including controls) Lighting and daylighting controls Domestic hot water systems Renewable energy systems

Credit – Enhanced Commissioning Must be independent and can not be employed by the Design or Construction Firms The Cx reviews design for compliance with the OPR and BOD Contractor submittal reviews Training verification Warranty review Develop systems manuals

Owner's Project Requirements (OPR) Owner and User Requirements Environmental and Sustainability Goals Energy Efficiency Goals (Basis of the M&V Plan) Indoor Environmental Quality Requirements Equipment and Systems Expectations Building Occupant and O&M Personnel Expectations

Basis of Design (BOD) System Narrative Descriptions Primary Design Assumptions Standards Utilized for Design

Air handling unit used for storage during construction

Side-stream filter for cooling tower installed directly on floor – not able to be drained

Geothermal well field piping left unprotected

Thermographic imaging reveals misaligned pump

Uses and Purposes of M&V:  Confirm energy savings for projects that received energy efficiency grants from government or utility provider  Verify savings as part of an energy performance contract  Continuously monitor performance to achieve energy reduction goal at building or campus level when implementing ECMs  Achieve LEED points through credit EAc5 Measurement & Verification  Demonstrate savings of new technology before implementing on a larger scale  Verify requirements of the OPR

Accepted Practices: International Performance Measurement & Verification Protocol (IPMVP) 4 Options

Option A: Partially Measured Retrofit Isolation Basic single component modification where energy not dependent on weather or varying usage patterns. Each upgrade analyzed independently. Metered for brief time period

Option B: Retrofit Isolation Basic single component modification where energy dependent on weather and varying usage patterns. Each upgrade analyzed independently. Metered minimum one year.

Option C: Whole Facility Whole building energy performance based on benchmarking against similar buildings for minimum one year. Cannot use for building types without widely available data.

Option D: Calibrated Simulation Whole building energy performance using computer simulation for minimum one year. Most difficult method but can be used for any building type and multiple interacting ECMs.

Raw energy data cannot be used; important to normalize based on:  Weather: Adjust so baseline and upgraded building are analyzed using the same heating/cooling degree days or weather profile.  Occupancy: Adjust for number of occupants and hours of usage.  Building Modifications: Adjust for any other changes in building not related to project that could affect energy usage (examples: interior renovation, new receptacle loads).

Methods of Metering and Monitoring:  Main meter: Measure electricity, gas, and other energy to whole building.  Temporary sub-meters: Measure electricity to individual components for a short period of time.  Permanent sub-meters: Measure electricity, gas, and other energy by usage type or individual component permanently over life of building.  Equipment controls: Utilize variable frequency drives, chiller/boiler control panels, and motor status to calculate energy consumption. Recommend recording energy data in building automation system application. Can also be displayed on a dashboard to show real-time usage and energy breakdown.

Recommended metering/monitoring points include:  Main HVAC equipment: boilers, chillers, large AHUs  Main lighting panels  Large process equipment: servers, manufacturing equipment

ENERGY STAR Buildings Program Ohio Building Authority Facilities ENERGY USAGE PER SQ. FT. SAVINGS

Questions?